Nur IzieAdiana Abidin

Nur IzieAdiana Abidin

Auto-generated profile, based on publicly available information

Nur IzieAdiana Abidin

Universiti Teknologi Malaysia

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2021 in Journal of Building Engineering
Verified
Journal Article
Closed access
NDNur'AFini Dzulkifli
Nur'AFini Dzulkifli
NSNoor Nabilah Sarbini
Noor Nabilah Sarbini
IIIzni Syahrizal Ibrahim
Izni Syahrizal Ibrahim
NANur Izieadiana Abidin
Nur Izieadiana Abidin
FYFadzil Mat Yahaya
Fadzil Mat Yahaya
NANik Zainab Nik Azizan
Nik Zainab Nik Azizan

1 September 2015 in Knowledge-Based Systems
Verified
Journal Article
Closed access
Mehrbakhsh NilashiMehrbakhsh Nilashi
Mehrbakhsh Nilashi
Rozana ZakariaRozana Zakaria
Rozana Zakaria
OIOthman Ibrahim
Othman Ibrahim
MMMuhd Zaimi Abd. Majid
Muhd Zaimi Abd. Majid
RZRosli Mohamad Zin
Rosli Mohamad Zin
DYDodo Aminu Yakubu
Dodo Aminu Yakubu

1 October 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
SLS E N Lau
S E N Lau
Rozana ZakariaRozana Zakaria
Rozana Zakaria
EEYDZAH AMINUDINEEYDZAH AMINUDIN
EEYDZAH AMINUDIN
CSC Chang Saar
C Chang Saar
NAN I A Abidin
N I A Abidin
ELE Lou
E Lou
Industrial revolution is a series of events driven by the growth of technological innovations, and so far, the world had witnessed the first three industrial revolutions. Today, a new revolution referred to as the fourth industrial revolution is entering even though it is still in its early stages of development. Many developed countries had established their own roadmap or strategic plan as a first step. However, only a few of them touched the construction sector even though the construction industry provides a significant contribution to the country’s GDP. Based on this understanding, there is a fundamental need to give a clear view of Industry 3.0 to Industry 4.0 from the construction industry’s perspective, since most users are still finding their way in this transition. An extensive literature review is used to define the scope and terms of the field of construction in the industrial revolution. Towards this goal, a clear definition and concept of each revolution, key technologies related to construction and challenges faced by the industry will be explored. Simultaneously, this review paper also benchmarked a few documents as a simple guide in the transition process to the fourth industrial revolution to avoid a lag in a world where changes are swift and sudden. Therefore, this review paper contributes by providing a better understanding of the challenges and trends in Construction 4.0 to academics and practitioners. Moreover, it will spark new ideas on the policy or strategic roadmap development in the future.

11 April 2018 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
JKJam Shahzaib Khan
Jam Shahzaib Khan
Rozana ZakariaRozana Zakaria
Rozana Zakaria
EEYDZAH AMINUDINEEYDZAH AMINUDIN
EEYDZAH AMINUDIN
NANur IzieAdiana Abidin
Nur IzieAdiana Abidin
SSShaza Rina Sahamir
Shaza Rina Sahamir
DADarul Nafis Abas
Darul Nafis Abas
Sudden decline in financial markets and economic meltdown has slow down adaptation and lowered interest of investors towards green certified buildings due to their higher initial costs. Similarly, it is essential to fetch investor's attention towards more development of green buildings through automated tools for the construction projects. Though, historical dearth is found on the automation of green building rating tools that brings up an essential gap to develop an automated analog computerized programming tool. This paper present a proposed research aim to develop an integrated web-based automated analog computerized programming that applies green building rating assessment tool, green technology and life cycle cost analysis. It also emphasizes to identify variables of MyCrest and LCC to be integrated and developed in a framework then transformed into automated analog computerized programming. A mix methodology of qualitative and quantitative survey and its development portray the planned to carry MyCrest-LCC integration to an automated level. In this study, the preliminary literature review enriches better understanding of Green Building Rating Tools (GBRT) integration to LCC. The outcome of this research is a pave way for future researchers to integrate other efficient tool and parameters that contributes towards green buildings and future agendas.

30 December 2017 in MATEC Web of Conferences
Verified
Journal Article
Open access
FGFarid Ezanee Mohamed Ghazali
Farid Ezanee Mohamed Ghazali
Rozana ZakariaRozana Zakaria
Rozana Zakaria
EEYDZAH AMINUDINEEYDZAH AMINUDIN
EEYDZAH AMINUDIN
LSLee Yong Siang
Lee Yong Siang
GAGamal Alqaifi
Gamal Alqaifi
SSSiti Mazzuana Shamsuddin
Siti Mazzuana Shamsuddin
Green building development is an emerging paradigm for the construction industry practice all around the world. The establishement of Green Building rating tool helps to assess the whole life cycle process in planning to operation in a building. The Malaysian construction industry recognizes buildings that have been assessed using established green building tool such Green Building Index, Green RE or My CREST. Eventhough these rating tools provide motivation factors in its criteria and sub-criteria to promote sustainability in Malaysia buildings, there is still a major doubt to developers in terms of risks that may hinder their investments in green buildings. This paper highlights the priority importance of economic motivation factors against risks in the green building development in Malaysia. The data presented in this paper have been mainly derived from responses received through questionnaires completed by building stakeholders involved in green building developments. In order to determine the priority importance of economic motivation factors and risks identified for green building development, the questionnaire outcomes have been thoroughly assessed using the Analytical Hierarchy Process (AHP) method. As a result, lack of government incentive and high capital cost, which classified under green building risks, are the two key factors with highest priority importance that influenced most of the decision making for green building development in Malaysia. The results show green buildings have proliferated as governmental support and incentives with more exampler of higher profit return of investment in enhancing developers preference for green building development.

30 December 2017 in MATEC Web of Conferences
Verified
Journal Article
Open access
SSSiti Mazzuana Shamsuddin
Siti Mazzuana Shamsuddin
Rozana ZakariaRozana Zakaria
Rozana Zakaria
NHNorfashiha Hashim
Norfashiha Hashim
NYNorazian Mohamad Yusuwan
Norazian Mohamad Yusuwan
SSShaza Rina Sahamir
Shaza Rina Sahamir
NANur IzieAdiana Abidin
Nur IzieAdiana Abidin
Industrialised Building System (IBS) contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC) leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.