Nikhil S. Bhat

Nikhil S. Bhat

Auto-generated profile, based on publicly available information

Nikhil S. Bhat

Hindustan Construction Company Limited, Mumbai, India

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 May 2018 in International Journal of Construction Education and Research
Verified
Journal Article
Closed access
PVPrasad K V
Prasad K V
VVV Vasugi
V Vasugi
RVR. Venkatesan
R. Venkatesan
NBNikhil S. Bhat
Nikhil S. Bhat
Construction projects are the fuel for economic growth of any nation as they provide the essential requirements of housing, transportation, connectivity, and social infrastructure. India is in need of rapid infrastructure development. However, construction projects in India are plagued by a global phenomenon––“Delays/Time overruns”. Projects in India continue to suffer excessive delays. To identify the root causes of delay specifically in different type of projects, the projects were categorized based on the type and causes for each project type viz., transportation, power, buildings, and water/irrigation sector were identified. A questionnaire survey was conducted among the major contractors, owners and consultants in India to determine the critical causes of delay. Sixty causes of delay identified from literature were selected for the study and ranked using the Importance Index (II). Financial related causes viz., delay in settlement of claims by owner, contractor’s financial difficulties, delay in payment for extra work/variations and late payment from contractor to subcontractors/suppliers were found to be the most critical causes of delay in all the type of projects. Semi-structured interviews were conducted with senior professionals of Indian construction industry and exhaustive mitigation measures for top causes of delay were also developed to overcome them. These mitigation measures will serve as a checklist of best practices and will aid project managers and professionals to control delay causes and improve construction project delivery.

1 May 2022 in Civil Engineering
Verified
Journal Article
Closed access
KPKudrekodlu Venkatesh Prasad
Kudrekodlu Venkatesh Prasad
NBNikhil Bhat
Nikhil Bhat
The construction sector in India employs nearly 60 million people, so the unprecedented 2 month lockdown to slow the spread of Covid-19 in 2020 had devastating economic and social effects. The reduced demand for projects slowed demand for downstream industries, increased labour migration to villages and reduced logistics support for supplies and resources. This paper reports on the challenges experienced by one of India’s leading construction organisations on a major metro contract in Mumbai. It describes the impact of the pandemic on project delivery, including time, cost and supply chain issues, and discusses the mitigation strategies adopted.