Construction projects are the fuel for economic growth of any nation as they provide the essential requirements of housing, transportation, connectivity, and social infrastructure. India is in need of rapid infrastructure development. However, construction projects in India are plagued by a global phenomenon––“Delays/Time overruns”. Projects in India continue to suffer excessive delays. To identify the root causes of delay specifically in different type of projects, the projects were categorized based on the type and causes for each project type viz., transportation, power, buildings, and water/irrigation sector were identified. A questionnaire survey was conducted among the major contractors, owners and consultants in India to determine the critical causes of delay. Sixty causes of delay identified from literature were selected for the study and ranked using the Importance Index (II). Financial related causes viz., delay in settlement of claims by owner, contractor’s financial difficulties, delay in payment for extra work/variations and late payment from contractor to subcontractors/suppliers were found to be the most critical causes of delay in all the type of projects. Semi-structured interviews were conducted with senior professionals of Indian construction industry and exhaustive mitigation measures for top causes of delay were also developed to overcome them. These mitigation measures will serve as a checklist of best practices and will aid project managers and professionals to control delay causes and improve construction project delivery.
Purpose: Construction projects in India continue to suffer excessive delays. This paper aims to investigate the delay causes in India by project sector (transport, power, buildings and water) and carry out a comparative study of delay causes in design build (DB) projects with that of design bid build (DBB) projects along with mitigation measures. Design/methodology/approach: A questionnaire survey was conducted among major clients, contractors and consultants in India. Importance Index was used for ranking of the delay causes. Projects were categorized based on the type, and causes of delay in each project type were identified. Projects were also categorized based on type of contract, and delay causes in DB and DBB projects were compared. Statistical analysis of responses by Cronbach’s alpha, one-way analysis of variance, Kruskal–Wallis tests was carried out with Statistical Package for Social Sciences. Semi-structured in-depth interviews were conducted with senior industry professionals to develop exhaustive mitigation measures. Findings: The research findings indicate finance-related causes as the most critical causes of delay in Indian projects. Delay in settlement of claims, contractor’s financial difficulties, delay in payment for extra work/variations by owner, late payment from contractor to subcontractor or suppliers, variation orders/changes of scope by owner during construction and changes in design by owner were the highly ranked delay causes. The research found no significant difference in the delay causes in DB and DBB projects. Originality/value: This is the first study wherein delay causes for various project types within a single country are identified. In addition, the study has identified and compared the delay causes in DB projects and DBB projects. Mitigation measures developed in this study will help professionals and project managers not just in India but other developing countries as well to alleviate delay causes and in improvement of project timelines.
Despite the growing environmental consequences of cement production, geopolymer concrete now has gradually evolved as an ecologically sustainable product. This study experimentally investigates the effect of addition of different proportions (0%, 10%, and 20%) of rice husk ash (RHA) and polypropylene (PP) fibers (0%, 0.1%, and 0.3%) on the mechanical and durability characteristics of fly ash (FA)‐based geopolymer mortars. The strength property is assessed by testing the mortar specimen by uniaxial compressive strength and flexural strength while the durability properties were tested with water absorption, water sorptivity, and acid (10% concentration of H2SO4) resistance tests. The experimental findings revealed that the PP fiber addition is not significant in improving the compressive strength, while the addition up to 0.3% by volume had shown good improvement in flexural behavior. Water absorption increases with an increment in the replacement proportion of RHA. Water sorptivity also increases with an increase in RHA substitution levels. Furthermore, an artificial neural network prototype was proposed in this work to forecast the mechanical and durability properties of fiber reinforced FA‐RHA blended geopolymer mortar. The ANN architecture was constructed utilizing the mechanical and durability characteristics of FA‐RHA blended geopolymer mortar procured through experimental investigation. The RHA substitution proportion, sodium hydroxide (NaOH) liquid concentration, and polypropylene fiber content have been employed as input parameters in the construction of ANN framework. The predicted strength values of mechanical and durability tests achieved from the ANN framework agree well with experiment results. Use of geopolymer mortar has a high potential in repairing the structural elements, and further studies can be done on applying this mortar for the repairs.