Aneta Konczak

Aneta Konczak

Auto-generated profile, based on publicly available information

Aneta Konczak

MSc., PhD., Eng., Poznan University of Technology, Institute of Structural Engineering, Piotrowo 5 Street, 60-965 Poznan, Poland

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2016 in Archives of Civil Engineering
Verified
Journal Article
Open access
PDF file
Agnieszka DziadoszAgnieszka Dziadosz
Agnieszka Dziadosz
AKA. Kończak
A. Kończak
The problems related to construction production are multi-faceted and complex. This has promoted the search for different methods/approaches for analizing the data which supports the decision-making process in the construction industry. In the article the authors focus their attention on well-known methods and tools, and on some new approaches to solving decision-making problems. The aim of the article is to analyze the methods used to analyse data in a construction company, convey their advantages and disadvantages, and specify the degree of efficiency in the discussed area.

1 January 2013 in Procedia Engineering
Verified
Journal Article
Open access
KAKonczak Aneta
Konczak Aneta
JPJerzy Paslawski
Jerzy Paslawski
One of the fundamental problems in building engineering is to ensure conformance between the planned and the actual course of construction works. What may help solve this problem is a database with examples of performance of similar processes in analogous environmental conditions that enables estimating the basic process parameters (time, cost, quality, etc.). Case-based reasoning in a hybrid advisory system may play an important role between the rule-based reasoning and the machine learning when the data that has been gathered enables inference based on analogies with the completed processes, but their number is still inadequate for application of machine learning. Introduction of the abductive approach is intended to enable a detailed analysis of causes of nonconformances – a limited number of examples facilitate this. This is an example of cooperation between a human (search for causes based on intuition) and a computer (systematic gathering of examples). The authors also plan to use simulations to verify the abductive hypotheses. In the final part of the article, an example of application of case-based reasoning in the process of delivery of ready-mix concrete is presented

1 January 2015 in Procedia Engineering
Verified
Journal Article
Open access
MGMarcin Gajzler
Marcin Gajzler
AKAneta Konczak
Aneta Konczak
The subject of the article is to present the possibility of applying artificial neural network in analysis of observational data on the issue of simulation concrete supplies in construction industry. Neural networks allows a quick and efficient way to model phenomena at different levels of complexity. They can be used both in processes of well and poorly structured problems, knowledge of which is limited. The advantages of neural networks were transferred to the possibilities of defining probability distributions of individual tasks in cyclical building processes.The article presents the problem of concrete supplies for construction site, its elements and parameters which describe the process. The use of simulation in decision-making system was also demonstrated. One of the stages of creating simulation models is the adoption and verification of probability distributions that describe the elements of the system. In order to learn and predict the characteristics of probability distributions neural networks were used, that enable in the efficient and effective manner the implementation of further stages of simulation modeling. The article presents the results of applying the neural network and approach that enables their use

1 January 2015 in Procedia Engineering
Verified
Journal Article
Open access
AKAneta Konczak
Aneta Konczak
JPJerzy Paslawski
Jerzy Paslawski
Simulation is one of methods enabling support of the planning of construction processes. The article presents the possibilities of using simulation as a component of a hybrid advisory system. The system is based on the accumulation of knowledge from observations and using it with previous cases as an analogy and likeness of cyclic processes. Simulation is used to verify hypotheses in the selection of resources and parameters of the process. The study explores available simulation software (MicroCyclone, FlexSim, and AnyLogic) and compares them in terms of ease of implementation, data readability and quality of results. Created statement is used for selection of software, which reflects the actual model of building processes with the highest precision.The problem of production of precast slabs was analyzed. On the basis of research to determine the duration of individual tasks of production, simulation model was defined. Using available software (MicroCyclone, FlexSim) capable of simulating the production process, changes in the selection of the composition of the team and materials have been proposed, enabling improvement of the efficiency of prestresed core slabs production on the analyzed line in the prefabrication plant