Himal Suranga Jayasena

Himal Suranga Jayasena

Auto-generated profile, based on publicly available information

Himal Suranga Jayasena

Department of Building Economics, University of Moratuwa, Sri Lanka

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2019
Verified
Conference Paper
Closed access
DLDimuthu Lakmal
Dimuthu Lakmal
KKKumaran Kugathasan
Kumaran Kugathasan
VNVishaka Nanayakkara
Vishaka Nanayakkara
SJSuranga Jayasena
Suranga Jayasena
APAmal Shehan Perera
Amal Shehan Perera
LFLasantha Fernando
Lasantha Fernando
Every year paddy cultivators lose a significant amount of crop yield due to diseases and pests. Brown Planthopper (BPH) is one of the most common diseases that affect paddy cultivation. Sri Lankan government is struggling to make appropriate estimations regarding Brown Planthopper prevalence due to the absence of accurate and timely data. To solve this issue, a machine learning approach is proposed based on optical and synthetic aperture radar remote sensing data in this study. However, there is no previous effort for detecting Brown Planthopper attacks using machine learning and satellite remote sensing data under field conditions. This study consists of two phases. A time series classification based on SAR imagery is implemented to identify cultivated paddy fields in the first phase. Ratio and standard difference indices derived from optical satellite images are used in the second phase to identify regions affected by BPH attacks in paddy fields. Convolution neural network that is used in the first phase reports an accuracy of 96.20% for identifying cultivated paddy regions. A Support Vector Machine is used to detect areas damaged by BPH attacks in the second phase. The Combined approach of the first and the second phases shows promising results with an accuracy of 96.31% for detecting Brown Planthopper attacks.

19 July 2016 in International Journal of Strategic Property Management
Verified
Journal Article
Open access
LGLuisa Giuliani
Luisa Giuliani
ARAlexandra Revez
Alexandra Revez
JSJörgen Sparf
Jörgen Sparf
SJSuranga Jayasena
Suranga Jayasena
MFMichael Havbro Faber
Michael Havbro Faber
Large scale projects tasked with designing infrastructures and urban networks resilient to disasters face a common challenge, i.e. the need to address concomitant technological issues and social problems. What is more, conflicting technologies and the diverse philosophical underpinnings of distinct academic disciplines pose difficulties in the collaboration among experts of different fields. These difficulties and possible ways to tackle them have been highlighted by a questionnaire developed in the framework of an EU project named ANDRDD (Academic Network for Disaster Resilience to optimize Educational development). More specifically, the project investigated the level of interdisciplinary work in current research and educational projects within the field of disaster resilience. findings illustrate the number and types of disciplines involved in disaster resilience projects and suggest that a higher degree of integration between different disciplines in tertiary education could promote a transdisciplinary approach to disaster resilience, resulting in design efficiency and innovation.

29 November 2020 in Intelligent Buildings International
Verified
Journal Article
Closed access
Akila Pramodh RathnasingheAkila Pramodh Rathnasinghe
Akila Pramodh Rathnasinghe
UKU. Kulatunga
U. Kulatunga
HJH. S. Jayasena
H. S. Jayasena
M.K. Chamitha Sanjani WijewickramaM.K. Chamitha Sanjani Wijewickrama
M.K. Chamitha Sanjani Wijewickrama
Building Information Modelling (BIM) is a revolutionary stride of technology towards the orthodox construction and procedures in conventional Architecture Engineering and Construction (AEC) industry. The strength of BIM has been undervalued on the eyes of many professionals as to think of BIM as just another ‘software’ which is in reality, a ‘process’ of attaining an outstanding collaboration among every stakeholder throughout a project's life cycle. Thus, the purpose of this study is to develop a foreseeable information flow model related to the Construction Supply Chain (CSC) of a BIM aided project. This study administered a qualitative approach. Data was collected through semi-structured interviews with 10 experts, due to the lack of expertize with actual implementation experiences in the subject matter. The data were analysed using manual content analysis. The outcomes revealed that BIM standards have laid down charismatic arrangements on information flows among BIM project stakeholders, which is, in reality, a complex and random setup. The research outcome has successfully answered the complications in complex information setup of a BIM project by laying down guidance for any outsider to the BIM field as to recognize on what would be the contribution of each stakeholder throughout its BIM project's life cycle.

4 November 2020 in Built Environment Project and Asset Management
Verified
Journal Article
Closed access
GPG.P.P.S. Perera
G.P.P.S. Perera
TTT.M.M.P. Tennakoon
T.M.M.P. Tennakoon
UKUdayangani Kulatunga
Udayangani Kulatunga
HJHimal Suranga Jayasena
Himal Suranga Jayasena
MWM.K.C.S. Wijewickrama
M.K.C.S. Wijewickrama
Purpose: The purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approach: An abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.Findings: The critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implications: The study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implications: The systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/value: A study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.

31 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
ISIshini Saparamadu
Ishini Saparamadu
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
RGRomasha Nethmini Deveni Guruge
Romasha Nethmini Deveni Guruge
HJH. S. Jayasena
H. S. Jayasena
Ali DarejehAli Darejeh
Ali Darejeh
Balachandra Arachchige Isuru ErangaBalachandra Arachchige Isuru Eranga
Balachandra Arachchige Isuru Eranga
Frequent ambiguities in contract terms often lead to costly legal disputes and project delays in the construction industry. Large Language Models (LLMs) offer a promising solution, enhancing accuracy and reducing misinterpretations. As studies pointed out, many professionals use LLMs, such as ChatGPT, to assist with their professional tasks at a minor level, such as information retrieval from the Internet and content editing. With access to a construction regulation database, LLMs can automate contract interpretation. However, the lack of Artificial Intelligence tools tailored to industry regulations hinders their adoption in the construction sector. This research addresses the gap by developing and deploying a publicly available specialised chatbot using the ChatGPT language model. The development process includes architectural design, data preparation, vector embeddings, and model integration. The study uses qualitative and quantitative methodologies to evaluate the chatbot’s role in resolving contract-related issues through standardised tests. The specialised chatbot, trained on construction-specific legal information, achieved an average score of 88%, significantly outperforming ChatGPT’s 36%. The integration of a domain-specific language model promises to revolutionise construction practices through increased precision, efficiency, and innovation. These findings demonstrate the potential of optimised language models to transform construction practices.

7 August 2019
Verified
Book Chapter
Closed access
PDF file
Akila Pramodh RathnasingheAkila Pramodh Rathnasinghe
Akila Pramodh Rathnasinghe
MWM. K. C. S. Wijewickrama
M. K. C. S. Wijewickrama
UKU. Kulatunga
U. Kulatunga
HJH. S. Jayasena
H. S. Jayasena