High-mix low-volume (HMLV) manufacturing faces cycle-time challenges from frequent product changes, short production runs, variable process routes, setup variation, uneven workloads, waiting, downtime, and rework. This study proposes an integrated Lean-DMAIC framework for cycle-time reduction and smart factory implementation. The framework combines value stream mapping, 5S, standard work, line balancing, bottleneck analysis, Pareto analysis, 5 Whys, time-motion analysis, and PFMEA with the DMAIC sequence. Total cycle time is divided into processing, setup, waiting, rework, downtime, and queue components. The methodology evaluates OEE, throughput, setup time, downtime, Cpk, WIP, lead time, and cost per part. A three-machine cellular configuration is compared with a single multi tasking machine under simulated HMLV conditions. IoT/PLC data, KPI dashboards, quartile based monitoring, and Taguchi experiments support process control. Illustrative results indicate lower setup, waiting, downtime, queue, and rework losses, with favorable performance from the cellular configuration.