Roman Demianenko

Roman Demianenko

Auto-generated profile, based on publicly available information

Roman Demianenko

Kyiv National University of Construction and Architecture

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 February 2020
Verified
Conference Paper
Open access
PDF file
RSRoman Shults
Roman Shults
KKKhaini-Kamal Kassymkanova
Khaini-Kamal Kassymkanova
SBShugyla Burlibayeva
Shugyla Burlibayeva
DSDaria Skopinova
Daria Skopinova
RDRoman Demianenko
Roman Demianenko
YMYurii Medvedskyi
Yurii Medvedskyi
The first stage of any construction is carrying out excavation works. These works are high-priced and timeconsuming. Mostly, for geodetic control of the works, the surveyors are using total stations and GNSS equipment. Last decade, UAV technology was a breakthrough in the geodetic technologies market. One of the possible applications of UAV is the monitoring of excavation works. In the article, the opportunities and accuracy of UAV data while performing the excavation works were studied. The surveying of earth volume in the middle of construction works was made using DJI Phantom 4 UAV. The data were being processed using two photogrammetric software: Agisoft Metashape and PhotoModeler Premium. For comparison, the surveying also was made using a conventional total station. For each data source, the 3D models were generated. The obtained models were compared with each other in CloudCompare software. The comparison revealed the high accuracy of UAV data that satisfies customer’s requirements. For the case of two software comparing, it is better to process data using PhotoModeler. The PhotoModeler software allows performing in-depth data analysis and blunders searching.

31 August 2022 in Urban development and spatial planning
Verified
Journal Article
Open access
PDF file
YMYurii Medvedskyi
Yurii Medvedskyi
AAAndriy Annenkov
Andriy Annenkov
OIOleksandr Isayev
Oleksandr Isayev
RDRoman Demianenko
Roman Demianenko
The article considers the existing methods used in the problem of geodetic monitoring of structures, analyzes the possibilities and gives a preliminary assessment of the accuracy of their use in monitoring high-rise structures. Methods have been identified that allow obtaining measurement results with a high sampling rate and have the potential for automation. Methods have been identified that allow solving the problem of calculating the daily fluctuations of a structure from the effects of solar radiation and wind load separately from the values of heel and draft.

4 May 2023
Verified
Conference Paper
Closed access
VRVolodymyr Rashkivskyi
Volodymyr Rashkivskyi
RDRoman Demianenko
Roman Demianenko
The article examines approaches to determining the adequacy of the BIM model when surveying construction sites that have suffered as a result of hostilities. In particular, it has been determined that the inspection of construction objects and structures damaged during aggressive influence, in particular combat operations, requires the development of special measures for conducting the inspection. The process of the actual condition of the construction structures of the structures under investigation, taking into account safety measures, including the danger of collapse of structures or structures, the presence of explosive substances and means on the territory of the survey, the presence of harmful construction materials on the sites, etc., requires significant attention. Modern methods of inspection of buildings and structures determine the periodicity of work, which usually takes into account the specifics of the object, its actual condition and expert recommendations of a specialist. Such approaches are justified under normal operating conditions of construction objects, but are not effective in the presence of variable factors caused by external influences, such as military operations or natural disasters. Analysis of the state of buildings and structures, as well as their structures, is proposed to be carried out discretely to form a picture of changes in their state over time. The degree of discreteness is determined by the expert. Conducting an initial survey of building structures using remote monitoring allows you to form an information database about the state of these structures. Means of remote monitoring, in particular, UAVs, make it possible to obtain the accuracy of studies of the state of structures within 20 mm. Such values are not exhaustive, they allow to determine only generalized parameters, for example, the scope of work, the implementation of monitoring of the execution of related works, etc., therefore, at present, the search for methods and means of remote monitoring is being carried out to increase the accuracy of measurements for the study of cracking of structures, exact deviations of structures from design, etc. Modern software tools make it possible to create intermediate 3D models of objects using photogrammetry methods during geodetic research. Comparative analysis of simulation modeling of construction objects and their cartographic analysis allow to adjust the BIM model of the object for the development of measures to restore its operational state or disposal or conservation.

17 April 2024 in Strength of Materials and Theory of Structures
Verified
Journal Article
Open access
PDF file
RDRoman Demianenko
Roman Demianenko
AAAndriy Annenkov
Andriy Annenkov
SBSvitlana Bondar
Svitlana Bondar
OKOleksandr Kuzmych
Oleksandr Kuzmych
ILIhor Lapytskyi
Ihor Lapytskyi
During the construction and operation of high-rise buildings, their vertical axis changes its position in space. The greater the height of the structure, the greater the amplitude of oscillations. This causes problems of geodetic construction support and the need to monitor deformations during the operation of high-rise structures. In real conditions, part of the structures will be in the shade and their temperature will be lower than the structures that will be under the influence of solar radiation, the temperature of which will be much higher. Thus, the building will deform as a result of uneven thermal expansion, that is, it will bend. From DBN B.1.3-2:2010 "Geodesic works in construction". Also, during the geodetic provision of the construction and operation of high-rise buildings, changes in the temperature regime of building structures should be taken into account in connection with significant absolute values of changes in the geometric dimensions of the building as a result of thermal expansion, which significantly exceed the accuracy regulated by the regulatory document. The article examines and analyzes the influence of external forces on changes in the geometry of high-rise structures and focuses attention on solving the scientific problem of geodetic support for the construction and operation of modern high-rise structures under dynamic loads.

11 November 2022 in Strength of Materials and Theory of Structures
Verified
Journal Article
Open access
PDF file
OIOleksandr Isaev
Oleksandr Isaev
AAAndriy Annenkov
Andriy Annenkov
RDRoman Demianenko
Roman Demianenko
PCPetro Chulanov
Petro Chulanov
The article is related to the field of geodetic and engineering construction monitoring of building structures in the form of rod systems. It investigates the measurement accuracy of the compression deformation of the rod. As an example, there is considered a vertical rectilinear rod of high flexibility, loaded with a longitudinal axial force. Experience demonstrates that the rod, under the influence of an axial compressive load not exceeding the permissible design values, retains its original form of equilibrium and stability. At the same time, it works in the field of elastic compression deformations. As the load increases to its critical values, there occurs a particular state of the element when the form of equilibrium becomes unstable, and at any moment, it can turn from a straight line into a curvilinear one with a slight external influence or as a result of position errors. This is accompanied by large displacements and permanent deformations. The importance of monitoring is noted when a building structure with similar constructions, for example, is situated in the area of development of negative natural and anthropogenic processes. As a result, the load on some elements may increase to critical values due to uneven horizontal and vertical displacement and inclination of the structure, including vibrations, etc. Attention is focused on the fact that the complex of engineering and technical measurements should show, with the necessary completeness, reliability and accuracy of the value, the nature and dynamics of changes in the external load on the elements of the building structure, changes in internal forces and stresses in them, the development of deformations (changes in the size and shape of equilibrium). There is explained the accuracy with which it is necessary to measure the displacement of the rod end during the deformation. There was derived the dependence with the help of which it is possible to see the root-mean-square error of the displacement measuring that depends on the choice of the maximum stress deviation in the sections of the rod made of a certain material. There is laid out the calculation of the maximum stress deviation based on the stability and flexibility of the rod.

29 March 2024 in Urban development and spatial planning
Verified
Journal Article
Open access
PDF file
YMYurii Medvedskyi
Yurii Medvedskyi
AAAndriy Annenkov
Andriy Annenkov
OAOleksandr Adamenko
Oleksandr Adamenko
RDRoman Demianenko
Roman Demianenko
ETElena Tcikolenko
Elena Tcikolenko
ОЦОлена Циколенко
Олена Циколенко
The research delves into a comprehensive analysis of the outcomes derived from Unmanned Aerial Vehicle (UAV) mapping applied to a terrain characterized by a significant variance in elevation. Specifically, the study focuses on the incline of the National Museum of the Holodomor Genocide in Kyiv. Throughout the process of generating orthophotomaps, meticulous attention was given to georeferencing the images to reference points. The coordinates of these points were determined with precision using Global Navigation Satellite System (GNSS) methods implemented through a network of permanent Real-Time Kinematic (RTK) stations. In addition to the georeferencing process, these points underwent coordination to facilitate a more in-depth analysis of linear distortions evident in the orthophotomap along and across the slope. Upon scrutinizing the results obtained by comparing horizontal distortions between control points derived from the orthophoto and those obtained through analytical calculations, a discernible correlation emerged between the elevation difference and the magnitude of misalignment. It was observed that longer lines parallel to the slope exhibited a tendency for increased errors, while no such dependence was noted for lines perpendicular to the slope. This observed trend underscores the importance of considering elevation differences in the survey area when employing UAV survey methodology. The results strongly suggest the feasibility and practicality of integrating such considerations into the UAV surveying process for terrains characterized by significant elevation variations.