Heping Zhang

Heping Zhang

Auto-generated profile, based on publicly available information

Heping Zhang

Xinjiang Fukang Pumped Storage Power Company Limited, Fukang 831500, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 June 2022 in Wireless Communications and Mobile Computing
Verified
Journal Article
Open access
PDF file
CQChanglu Qiao
Changlu Qiao
YWYan Wang
Yan Wang
YLYanxue Liu
Yanxue Liu
LJLi Junfeng
Li Junfeng
HZHeping Zhang
Heping Zhang
JLJiangang Lu
Jiangang Lu
Aiming at the problems that need to be solved urgently in the current operation of a multireservoir in Kuitun River Basin, such as the uneven distribution of water resources in time and space, the large workload of manual operation calculation, and low coordination level, the paper takes the optimal operation of water resources in the basin as the main goal and carries out the research on the optimal operation model of the multireservoir in combination with the complex characteristics of local water resources system. Firstly, based on the generalization of hydraulic engineering in Kuitun River Basin, a water resources optimal operation model of the multireservoir is established and is solved by the graph theory. Then, the actual data of typical years were selected to test the model. The test results show that, compared with the actual water distribution, the water shortage rate of 2015 and 2016 in high flow years decreased by 98.57% and 100%, respectively; the water shortage rate of 2013 and 2014 in normal flow years decreased by 92.65% and 96.38%, respectively; and the water shortage rate of 2009 in a low flow year decreased by 87.78%. The model can provide the optimal operation scheme for the optimal operation of the multireservoir in the basin. And it can solve the problems such as the uneven distribution of water resources and the large workload of manual operation calculation and can provide technical support for the optimal operation of water resources of the multireservoir in Kuitun River Basin in the future.