Bryce Fledderman

Bryce Fledderman

Auto-generated profile, based on publicly available information

Bryce Fledderman

General Atomics, San Diego, CA, USA

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 December 2023 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
KKKenneth Khumthong
Kenneth Khumthong
EOEdward Ortiz
Edward Ortiz
JSJeffery Sheeron
Jeffery Sheeron
BFBryce Fledderman
Bryce Fledderman
NNNikolai Norausky
Nikolai Norausky
ALAlan Langhorn
Alan Langhorn
General Atomics (GA) is under contract to UT-Battelle c/o Oak Ridge National Laboratory for the fabrication of ITER Central Solenoid Modules (CSM). GA will provide seven modules to ITER Organization (IO), six of which will be assembled in a stack that forms the ITER Central Solenoid. All CSMs are required to pass factory acceptance testing (FAT) at General Atomics’ Magnet Technology Center (MTC) test facility prior to shipment to IO. Currently, CSMs 1, 2, and 4 have completed FAT and have been delivered to IO. CSM5 has completed FAT and CSM3 will repeat FAT after resuming its test campaign. FATs on CSMs 6 and 7 are planned as the modules complete fabrication. The MTC test facility was designed and built to conduct CSM factory acceptance tests. The test facility consists of the test chamber, high vacuum system, 4.5 K recirculating supercritical helium refrigeration plant, 50 kA DC power supply, capacitor-pulsed DC circuit breakers, 1 GJ discharge resistor, high-temperature superconducting current feeders, data acquisition system, supervisory control and magnet quench protection system, and a multitude of supporting equipment. Where possible, the test facility utilizes similar equipment planned for use at IO for magnet operation. The test facility operational lessons learned as a result of CSM 1–4 FATs are presented and discussed in this paper.

24 November 2025 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
YMY. Miyoshi
Y. Miyoshi
ABA. Bruton
A. Bruton
CCC. Cormany
C. Cormany
TST. Schild
T. Schild
IRI. Rodin
I. Rodin
JSJ. Smith
J. Smith
ITER Central Solenoid (CS) system manufacturing, after ten years, completed all coil modules manufacturing and testing to full current 40 kA at 4.5 K. Meanwhile the assembly work at ITER has progressed steadily since its start five years ago. A summary of characteristic technical challenges found in manufacturing and assembly, and an outlook of what is expected towards the completion of CS assembly are presented.

23 January 2024 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
BFBryce Fledderman
Bryce Fledderman
KKKenneth Khumthong
Kenneth Khumthong
NNNikolai Norausky
Nikolai Norausky
EOEdward Ortiz
Edward Ortiz
JSJohn Smith
John Smith
ALAlan Langhorn
Alan Langhorn
General Atomics (GA) is fabricating seven ITER Central Solenoid Modules (CSM) for the ITER Organization (IO). As part of the fabrication process, all CSMs undergo factory acceptance testing (FAT) prior to shipment to the IO. The FAT includes charging the modules to 40 kA and performing fast discharges (7.3 second decay time constant) to measure alternating current (AC) losses. These fast discharges generate high voltages at the electrical connections between the CSM and the test facility. Due to a fast discharge fault during the CSM 3 FAT, Paschenization methods of high voltage connections between the CSM and the test facility needed to be developed, qualified, and implemented. These connections included the coaxial and twinbox joints, all in-chamber instrumentation voltage tap wire splices, and voltage tap chamber feedthroughs. A test article was manufactured to replicate these connections and joints, and qualify the locally removable Paschenized insulation designs with a Paschen Test at 4.5 K. The 4.5 K Paschen test was comprised of 15 kV tests between 1E-03 and 1 mbar. This paper will present and discuss the Paschenization methods, lessons learned from research, and the CSM implementation in the test facility.