Frank Gerigk

Frank Gerigk

Auto-generated profile, based on publicly available information

Frank Gerigk

CERN, Geneva, Switzerland

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2013 in Reviews of Accelerator Science and Technology
Verified
Journal Article
Closed access
POPeter Ostroumov
Peter Ostroumov
FGFrank Gerigk
Frank Gerigk

12 January 2018 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
FGFrank Gerigk
Frank Gerigk
The CERN SRF infrastructure was originally set-up for Nb on Cu coated cavities for LEP and later for LHC. Today Superconducting RF has become a vital technology not only for LHC but also for HIE-ISOLDE and the HL-LHC project. More SC cavities will be needed for a potential HE-LHC or for any of the Future Circular Collider (FCC) options, which are presently under study. To meet these demands, CERN has improved its SRF infrastructure over the recent years and has started several R&D lines including improved thin film coating techniques, high-power couplers, cold-test diagnostics, etc. This paper will give an overview of CERN's SRF activities today, and the challenges of future projects.

1 June 2007
Verified
Conference Paper
Open access
WWW. Weterings
W. Weterings
GBG. Bellodi
G. Bellodi
JBJ. Borburgh
J. Borburgh
TFT. Fowler
T. Fowler
FGF. Gerigk
F. Gerigk
LSL. Sermeus
L. Sermeus
The H - beam from the proposed LINAC4 will be injected into the four existing rings of the PS Booster at 160 MeV. A substantial upgrade of the injection region is required, including the modification of the beam distribution system and the construction of a new H - injection system. This paper discusses beam dynamics and hardware requirements and presents the results of optimisation studies of the injection process for different beam characteristics and scenarios. The resulting conceptual design of the injection region is presented, together with the main hardware modifications and performance specifications.

Verified
Conference Paper
Open access
PDF file
MVMaurizio Vretenar
Maurizio Vretenar
AAAbdelouahid Akroh
Abdelouahid Akroh
LALuca Arnaudon
Luca Arnaudon
PBPhilippe Baudrenghien
Philippe Baudrenghien
GBGiulia Bellodi
Giulia Bellodi
FZFrancesca Zocca
Francesca Zocca

1 January 2007
Verified
Conference Paper
Closed access
FGF. Gerigk
F. Gerigk
NAN. Alharbi
N. Alharbi
MPM. Pasini
M. Pasini
SRS. Ramberger
S. Ramberger
MVMaurizio Vretenar
Maurizio Vretenar
RWR. Wegner
R. Wegner
Linac4 is proposed to replace the existing proton linac at CERN (Linac2). Using an increased injection energy of 160 MeV instead of 50 MeV, Linac4 is expected to double the beam intensity in the PS Booster (PSB) and will thus be the first step towards higher brightness beams in the LHC. In this paper we re-assess the choice of RF structures for Linac4. Different accelerating structures for different energy ranges are compared in terms of RF efficiency, ease of construction and alignment, and necessary infrastructure. Eventually we present the final choice for Linac4.