Simon Ackerman

Simon Ackerman

Auto-generated profile, based on publicly available information

Simon Ackerman

Department of Forest and Wood Science, Stellenbosch University, Stellenbosch, South Africa

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 April 2018 in Annals of Forest Research
Verified
Journal Article
Closed access
PDF file
JBJulia Brewer
Julia Brewer
BTBruce Talbot
Bruce Talbot
HBHelmer Belbo
Helmer Belbo
PAPierre Ackerman
Pierre Ackerman
SASimon Ackerman
Simon Ackerman
Productivity of a mechanized P. patula cut-to-length harvesting operation was estimated and modelled using two methods of data collection: manual time study and follow-up study using StanForD stem files. The objective of the study was to compare the productivity models derived using these two methods to test for equivalence. Manual time studies were completed on four different machines and their operators. Two Ponsse Bear harvesters fitted with H8 heads, and two Ponsse  Beaver harvesters, fitted with H6 heads, were included. All machines were equipped with Ponsse Opti2 information system. All four operators had approximately 1 year of experience working with their respective machines. The four machines worked in separate four-tree-wide harvesting corridors, and they each harvested 200 trees.  Individual tree diameter at breast height (DBH), and height measurements were made manually. Subsequently, data on the trees in each study were extracted from the StanForD stem reports from each of the harvesters. Cycle times in the stem reports were determined based on the difference between consecutive harvest timestamps. The two methods were compared in terms of their abilities to estimate equivalent measures for tree DBH, volume, and productivity. In all four cases, significant differences were found between the DBH and volume measures derived using the two methods. Subsequently, the volume measures from the manual methods were used as the basis for productivity calculations. Results of the productivity comparisons found no significant differences between the models developed from the two methods. These results suggest that equivalent productivity models can be developed in terms of time using either method, however volume discrepancies indicate a need to reconcile bark and volume functions with the high variability experienced in the country.Â

8 April 2020 in Croatian journal of forest engineering
Verified
Journal Article
Open access
KGKayla Gagliardi
Kayla Gagliardi
SASimon Ackerman
Simon Ackerman
PAPierre Ackerman
Pierre Ackerman
Accurate predictions in forest operations can be used towards effective planning, costing, and maximizing the productivity of machines in mechanised cut-to-length (CTL) harvesting. There is a general and substantial gap in forwarder productivity data available for pine sawtimber in South Africa at present, and as the number of product assortments being harvested increase there is a need for more work to quantify the effects of extracting products of different dimensions. The aim of this study was to calculate the time consumption and productivity of two models of Ponsse forwarders (15 t and 20 t capacity) to consider and compare the effects of multiple variables including machine capabilities, product assortment, load size, extraction distance and fuel consumption. Productivity averaged at 34.08 m3 per productive machine hour excluding delays longer than one minute (PMH1) for the smaller machine, and 55.94 m3/PMH1 for the larger machine. Productivity and average log volume were strongly positively correlated. Regression models were created for each machine where load volume and extraction distance were both significant factors for predicting productivity. Average fuel consumption of the smaller machine was 15.55 l/PMH1 and 0.47 l/m3, and 20.57 l/PMH1 and 0.43 l/m3 for the larger machine. The product with the largest volume was found to require the least fuel per m3. The models developed could aid in predicting system productivity and potentially carbon emissions under similar conditions in a South African context of industrial plantation forestry.

2 November 2021 in International Journal of Forest Engineering
Verified
Journal Article
Open access
SASimon A. Ackerman
Simon A. Ackerman
BTBruce Talbot
Bruce Talbot
RARasmus Astrup
Rasmus Astrup
Long-term machine-derived data sets comprising 140,000 trees were collected from four harvesters of equal age and similar working conditions, into two machine size classes, viz. two Ponsse Bears and two smaller Ponsse Beavers. Productivity functions for each size class were modelled using a nonlinear mixed effects approach. Based on these functions, unit costs and their sensitivity to utilization rates and cost of capital were assessed. Results showed that despite considerably higher capital costs (32%) on the Bear, a 50% higher mean productivity resulted in a unit cost only 17% higher than the Beaver in a disadvantageous scenario (high interest rates and low utilisation), and a 6% lower unit cost than the Beaver in an advantageous scenario (low interest and high utilisation), within the range of tree sizes observed. Between these extremes, only marginal differences in unit costs were observed. This demonstrates that the difference in ownership and operating costs between larger and smaller harvesters is largely negated by the difference in productivity rates. These results can provide useful insight into timber harvester investment decisions. Harvesters from two adjacent size classes can be used interchangeably at the same unit cost within a wide range of tree sizes despite productivity differences. It should be noted that increased repair costs and an eventual reduction in expected economic lifetime on a smaller harvester, or the negative effects of using a larger harvester in smaller trees, e.g. thinning operations, were not taken into account in this work.

1 December 2013 in Southern Forests: a Journal of Forest Science
Verified
Journal Article
Closed access
SASimon A Ackerman
Simon A Ackerman
PAPierre A Ackerman
Pierre A Ackerman
TSThomas Seifert
Thomas Seifert

18 April 2018 in International Journal of Forest Engineering
Verified
Journal Article
Closed access
PAPierre Ackerman
Pierre Ackerman
CMChad Martin
Chad Martin
JBJulia Brewer
Julia Brewer
SASimon Ackerman
Simon Ackerman
With the emergence of excavator-based harvesters in cut-to-length CTL operations as a potential alternative to purpose-built harvesters, a debate has been opened as to which machine type is the most suitable in the forestry environment. A mechanized Eucalyptus pulpwood CTL operation, was observed to determine the effect of slope on harvester productivity and cost. A 2 × 2 factorial design with two treatments (machine type) against slope and individual tree volume as factors was developed. Two machine types were studied, an excavator-based harvester (Volvo EC210BF), and a purpose-built harvester (TimberPro TL725B), both fitted with Maskiner SP 591 LX harvester heads. A single operator with significant experience on both machines was used throughout the study. The machines worked on a range of slopes, from level to 50% in two separate corridors containing trees of similar volume and form. Continuous slope data was derived using large footprint light detection and ranging (LiDAR) data of the area. Calculations were carried out on each machine to determine which machine was more cost-effective. The productivity of the excavator based harvester decreased by 0.048 m3PMH−1 for every 1% increase in slope, while the productivity of the purpose-built harvester was constant across slope. While the purpose-built harvester was found to have a higher mean productivity the excavator-based harvester was more economical. This suggests that, in terms of economics the excavator-based harvester was more suitable across the conditions encountered in this study.

1 March 2019 in International Journal of Forest Engineering
Verified
Journal Article
Closed access
RWRoland Wenhold
Roland Wenhold
PAPierre Ackerman
Pierre Ackerman
SASimon Ackerman
Simon Ackerman
KGKayla Gagliardi
Kayla Gagliardi
In this study, a South African pine sawtimber mechanized cut-to-length harvesting operation was analyzed with the objective of modelling productivity development learning curves of beginner operators in both clear-felling and thinning operations. Trainee operators were selected based on the results of an assortment of psychometric testing and subsequently completed several harvester simulator tests. On average, a trainee operator would start at aperformance level (PL) of 60% lower than the population’s mean test time per test (PTmean) and end with a PL of 22% higher than the PTmean. Furthermore, when the PL of an average simulator trainee was measured over a period of 8.4 days or 25.2 tests (three tests per day), the operator’s PL was improved by 200%. Following sufficient simulator training, the operators began working in-field. Thinning operators worked with an average tree size of 0.18 m3, starting at a productivity of 13.71 m3 per productive machine hour excluding delays longer than 5 minutes (PMH5) at month one and increasing their productivity to 38.96 m3·PMH5−1 by the end of month 12. Clear-felling operators worked with an average tree size of 0.54 m3, starting at a productivity of 27.56 m3·PMH5−1 at month one and increased their productivity to 43.75 m3·PMH5−1 by the end of month 12. Ultimately, the thinning and clear-fell operators reached the end of their learning curves after an average of 9 and 6.5 months, and increased their productivity performances by 218% and 104%, respectively. These findings suggest acceptable learning periods and performance increases for beginner harvester operators.