Carrie Sturts Dossick

Carrie Sturts Dossick

Auto-generated profile, based on publicly available information

Carrie Sturts Dossick

University of Washington

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2010 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
CDCarrie S. Dossick
Carrie S. Dossick
GNGina Neff
Gina Neff
Proponents claim that the adoption of building information modeling (BIM) will lead to greater efficiencies through increased collaboration. In this paper, we present research that examines the use of BIM technologies for mechanical, electrical, plumbing, and fire life safety systems (often referred to as MEP) coordination and how the introduction of BIM influences collaboration and communication. Using data from over 12 months of ethnographic observations of the MEP coordination process for two commercial construction projects and interviews with 65 industry leaders across the United States, we find that BIM-enabled projects are often tightly coupled technologically, but divided organizationally. This means that while BIM makes visible the connections among project members, it is not fostering closer collaboration across different companies. We outline the competing obligations to scope, project, and company as one cause for this division. Obligations to an individual scope of work or to a particular com...

1 November 2013 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
JWJongsung Won
Jongsung Won
GLGhang Lee
Ghang Lee
CDCarrie Dossick
Carrie Dossick
JMJohn Messner
John Messner
Suggestions abound for successful adoption of building information modeling (BIM); however, a company with limited resources cannot adopt them all. The factors that have top management priority for successful accomplishment of a task are termed critical success factors (CSFs). This paper aims to derive the CSFs for four questions commonly asked by companies in the first wave of BIM adoption: (1) What are the CSFs for adopting BIM in a company? (2) What are the CSFs for selecting projects to deploy BIM? (3) What are the CSFs for selecting BIM services? (4) What are the CSFs for selecting company-appropriate BIM software applications? A list of consideration factors was collected for each question, based on a literature review, and then refined through face-to-face interviews based on experiences of BIM experts. An international survey was conducted with leading BIM experts. From the 206 distributed surveys, 52 responses from four continents were collected. This study used quantitative data analysis...

16 June 2011 in Engineering Project Organization Journal
Verified
Journal Article
Closed access
CDCarrie Sturts Dossick
Carrie Sturts Dossick
GNGina Neff
Gina Neff
We studied the organizational practices around Building Information Modelling, or BIM, in inter-organizational collaborations among architects, engineers and construction professionals in order to theorize how communication supports technology adoption. Using ethnographic observation and one-on-one interviews with project participants, we observed five teams on three different commercial and institutional building projects that each collaborated over periods of 8–10 months. In this paper, we argue that the dynamic complexity of design and construction processes requires what we call ‘messy talk’—conversations neither about topics on meeting agendas, nor on specified problems or specific queries for expertise. In messy talk interactions, AEC professionals contributed to innovation and project cohesion by raising and addressing issues not known by others. The communicative ‘affordances and constraints’ of BIM structured meeting conversations away from less structured, open-ending problem-solving and towards agenda-driven problem-solving around already identified problems. In other words, using BIM to make information exchange more efficient and effective worked only for certain tasks. We found BIM supports the exchange of explicit knowledge, but not necessarily informal, active and flexible conversations and exchange of tacit knowledge through messy talk. Although messy talk is perceived as more inefficient, it ultimately makes inter-organizational teams more effective.

1 April 2011 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
JTJohn E. Taylor
John E. Taylor
CDCarrie Sturts Dossick
Carrie Sturts Dossick
MGMichael Garvin
Michael Garvin
The case-study research method is popular across various disciplines; however, critics of the method argue that results from this form of research are applicable only to the case studied and cannot be generalized further. In the field of construction engineering and management (CEM), the number of papers employing case-study research methods over the past decade has increased substantially. As the method proliferates, the question arises: are CEM case studies being performed with sufficient validity and reliability to meet the burden of proof to generalize from the case-study findings? Meeting the burden of proof is particularly critical in CEM because of the unique, site-based nature of the projects and industry. This paper presents a review of 156 papers employing case studies published in the Journal of Construction Engineering and Management, of which the writers identified 33 theory-building case-study-method papers. This subset of theory-building papers was examined to induce a set of requirements a...

10 June 2010 in Information, Communication & Society
Verified
Journal Article
Closed access
GNGina Neff
Gina Neff
BFBrittany Fiore-Silfvast
Brittany Fiore-Silfvast
CDCarrie Sturts Dossick
Carrie Sturts Dossick
When can digital artefacts serve to bridge knowledge barriers across epistemic communities? There have been many studies of the roles new information and communication technologies play within organizations. In our study, we compare digital and non-digital methods of inter-organizational collaboration. Based on ethnographic fieldwork on three construction projects and interviews with 65 architects, engineers, and builders across the USA, we find that IT tools designed to increase collaboration in this setting instead solidify and make explicit organizational and cultural differences between project participants. Our study suggests that deeply embedded disciplinary thinking is not easily overcome by digital representations of knowledge and that collaboration may be hindered through the exposure of previously implicit distinctions among the team members’ skills and organizational status. The tool that we study, building information modelling, reflects and amplifies disciplinary representations of the building by architects, engineers, and builders instead of supporting increased collaboration among them. We argue that people sometimes have a difficult time overcoming the lack of interpretive flexibility in digital coordinating tools, even when those tools are built to encourage interdisciplinary collaboration.

1 March 2008 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
CDCarrie Sturts Dossick
Carrie Sturts Dossick
MSMakoto Sakagami
Makoto Sakagami
This paper reports on results of research conducted at the University of Washington to investigate the means and methods for overcoming barriers to the implementation of Web-based project management systems (WPMS), and to develop a set of best practices in both the United States and Japanese construction industries. The United States and Japanese economies are high-tech intensive and both cultures have embraced technology. However, a relatively small sector of the construction industry in each country has implemented WPMS. The question posed here is why have these drivers not resulted in the industry’s adoption of this new technology, and further, perhaps there are lessons learned from those who have successfully implemented WPMS. This research seeks to broaden our understanding of implementation barriers that are limiting the use of WPMS tools as well as means and methods of overcoming those barriers based on successful implementation in both countries.