Zhuolan Li

Zhuolan Li

Auto-generated profile, based on publicly available information

Zhuolan Li

School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan, China

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 April 2024 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
ZLZhuolan Li
Zhuolan Li
Yu ZhangYu Zhang
Yu Zhang
MZMengyuan Zhao
Mengyuan Zhao
When adjusting the transmission power of the dual-bridge series resonant converter (DBSRC) under the phase-shift modulation, significant step changes in phase-shift angles may occur. These changes stimulate a long-time oscillation process in the resonant tank with a large amplitude appearing in inductor current and capacitor voltage. During this transient process, the converter's dynamic performance deteriorates considerably, and the circuit components may experience severe overvoltage and overcurrent. In view of that, this article develops a transient process calculation model (TPCM) for the DBSRC using the fundamental harmonic approximation to analyze the oscillations during the transient process. Subsequently, the peak capacitor voltage, the peak inductor current, and the settling time during the transient process are estimated. Furthermore, based on the TPCM, this article proposes a control method to make the converter reach a steady state after one switching cycle, thus avoiding the risk of overvoltage and overcurrent and greatly improving the dynamic performance of the converter. Finally, the results of the theoretical analysis and the proposed control method are verified by simulations and experiments.

24 October 2024 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
ZSZonghui Sun
Zonghui Sun
GWGuangsen Wang
Guangsen Wang
ZLZhuolan Li
Zhuolan Li
XGXizheng Guo
Xizheng Guo
Yu ZhangYu Zhang
Yu Zhang
This letter presents a real-time simulation method for bridge-based power electronic converters based on the Ron/Roff model. By constructing the equivalent system state equation, all multiplications can be performed by shift addition operations in field programmable gate array (FPGA) implementation and avoids using limited multipliers. Then, a 50-kHz dual active bridge converter and a 100-kHz ac-dc–ac converter are simulated on FPGA with 20 ns simulation time step. Accuracy, timing, and resource consumption results verify the effectiveness of this method.

4 August 2025 in IEEE Transactions on Industrial Electronics
Verified
Journal Article
Closed access
ZSZonghui Sun
Zonghui Sun
Yu ZhangYu Zhang
Yu Zhang
ZLZhuolan Li
Zhuolan Li
For the bridge-based high-frequency power electronic converters (BHPECs) using the Ron/Roff model, the identification of blocking mode is crucial for the real-time simulation to avoid oscillation and ensure model accuracy. This article presents a predictive correction method that identifies the blocking mode of the half-bridge arm with low computational amount. The proposed method ensures model stability by the backward Euler method and achieves decoupling between half-bridge arms. Besides, by correcting the predicted state variables at the diode status-changing time point, this method significantly reduces the computational amount compared to the existing blocking mode identification methods without iterative operations. Finally, a series load resonant (SLR) converter with 100 kHz switching frequency and an LLC resonant converter with 200 kHz switching frequency were implemented on a field programmable gate array (FPGA), achieving simulation time steps as low as 20 ns. Comparisons with existing methods confirm the advantages of the proposed method in terms of timing and resource consumption.

10 November 2023
Verified
Conference Paper
Closed access
ZLZhuolan Li
Zhuolan Li
Yu ZhangYu Zhang
Yu Zhang
Under extended-phase-shift (EPS) modulation, both the internal phase-shift angle and the external phase-shift angle will have large step changes when the dual-bridge series resonant converter (DBSRC) rapidly adjusts the transmission power. This will cause serious oscillations in the resonant current and resonant voltage of DBSRC and threaten the safety of the converter. This paper analyzes the transient process produced by sudden changes in phase shift angles under EPS modulation. Then a fast transient control method is proposed for suppressing the oscillation by utilizing both internal and external phase-shift angles, which controls the transient process within one switching cycle and achieves a smooth transition of transmission power. Besides, impact and oscillation on the resonant current and resonant voltage during transient processes are significantly reduced. Finally, the performance of the control method is verified based on experimental and simulation results.

17 July 2025 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
ZSZonghui Sun
Zonghui Sun
ZLZhuolan Li
Zhuolan Li
Yu ZhangYu Zhang
Yu Zhang
GWGuangsen Wang
Guangsen Wang
For the high accuracy RON/ROFF model, multiplications need to be performed by field programmable gate array multiplier DSP48 slices, which limits the model scale for power electronic converters (PECs). Although the existing zero-multiplier method substitutes multiplications with shift addition operations (SAOs), the large number of SAOs not only inflates the computational complexity but also substantially increases the modeling workload. This article proposes a novel zero-multiplier method for real-time simulation of PECs based on the voltage controlled current source (VCCS) model. In order to guarantee the same high modeling accuracy as the RON/ROFF model, the equivalent conditions between the VCCS model and the RON/ROFF model are derived by analyzing the characteristics of switch currents. Besides, by applying the switch voltage equation of the RON/ROFF model to the VCCS model, the number of SAOs is significantly reduced. Moreover, the proposed method effectively circumvents the iterative operations that are inherent in traditional VCCS model-based methods. Finally, a three-phase inverter and a dual-active bridge converter are simulated in real-time. The simulation time steps can be as low as 20 ns. The most used resource is lookup tables (LUTs), but only consumes a little of the total resources. Compared with the existing zero-multiplier method, the proposed method demonstrates remarkable advantages in terms of reducing both the number of SAOs and the resource consumption of LUTs.

1 November 2026 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
ZSZonghui Sun
Zonghui Sun
ZLZhuolan Li
Zhuolan Li
YNYanting Niu
Yanting Niu
CWChudong Wang
Chudong Wang
Yu ZhangYu Zhang
Yu Zhang