Kun Liao

Kun Liao

Auto-generated profile, based on publicly available information

Kun Liao

School of Mechanical Engineering, Xihua University , Chengdu 610039, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2022 in AIP Advances
Verified
Journal Article
Open access
PDF file
HYHao Yan
Hao Yan
GCGang Chen
Gang Chen
SHShipeng Huang
Shipeng Huang
YDYao Dai
Yao Dai
KLKun Liao
Kun Liao
The problem of electrochemical corrosion of buried pipelines in near-neutral electrolytes leads to defects in or even fracture of oil and gas pipelines and the leakage of natural gas. Based on the principle of material diffusion and migration, the research object established an electrochemical corrosion model under the metallographic structure of pipes with ferritic–pearlitic pipeline steel. The results show that the most severe corrosion occurs at the center of the corrosion on the surface of the pipeline steel in a near-neutral corrosive environment. In addition, due to corrosion product accumulation, the material corrosion rate increased by about 38%. The electrolyte potential near the corrosion electrode is smaller, the ion concentration near the electrode is the highest, and the mass transfer phenomenon around the corrosion electrode is obvious. When the material undergoes metallographic corrosion, the corrosion is more severe. This research method can be used to predict the electrochemical corrosion occurring in the metal structure of buried pipelines and has some guidance for the assessment of the integrity of the external surface of buried pipes.

23 June 2021 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
HYHong-Hu Yuan
Hong-Hu Yuan
LKLiao Kun
Liao Kun
YWYu Wang
Yu Wang
There is a large amount of backfilled earth on both sides of the wall and the top of the lower wall of the Daning Reservoir’s cutoff wall, which is greatly disturbed by the project, and the safety of the cutoff wall needs to be evaluated. Based on the deformation law and stress condition of rigid cutoff wall during construction, according to the connection characteristics of rigid cutoff wall and plastic cutoff wall structure, the stress analysis of rigid cutoff wall is carried out by using field measurement data, so as to deduce the deformation law of plastic cutoff wall underneath, and evaluate the safety of plastic cutoff wall. The results show that the plastic cutoff wall is mainly affected by compressive stress, and the maximum compressive stress is far less than the allowable compressive stress, which indicates that the plastic cutoff wall is safe and stable during the whole construction period, although it is affected by construction and rigid cutoff wall.