Araby Ibrahim Mahdy

Araby Ibrahim Mahdy

Auto-generated profile, based on publicly available information

Araby Ibrahim Mahdy

Engineering Faculty, Suez University

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 November 2021
Verified
Conference Paper
Closed access
AMAraby I. Mahdy
Araby I. Mahdy
AEAbdullah Elfar
Abdullah Elfar
One of the most important assumptions in production scheduling is that the machines are permanently available without any breakdown. In the real world of scheduling, machines can be made unavailable due to various reasons such as preventive maintenance and unpredicted breakdown. In this research, the production scheduling is explored and we considered the machine consists of some components or elements each is subjected to failure rate with different scale and shape parameters. The machine components are under the competing risk reliability model as an availability constraint. A well known enumeration solution technique is designed for the small size problems then an evolutionary metaheuristic based on genetic algorithm is designed for larger problems. The results showed a great chance to enhance the scheduling problem through modifying some basic assumptions.

5 September 2022 in Egyptian Journal of Chemistry
Verified
Journal Article
Closed access
AMAraby Ibrahim Mahdy
Araby Ibrahim Mahdy
ASAbeer Mahmoud Shoaib
Abeer Mahmoud Shoaib
MAMohamed Gamal Mohamed Ahmed
Mohamed Gamal Mohamed Ahmed
WSWalaa Osman Saad
Walaa Osman Saad
KBKhaled Ibrahim Behery
Khaled Ibrahim Behery
The sulfur recovery unit (SRU) is an important part of gas processing and crude oil refinery plants. The primary purpose of SRU is to convert sulfur components in the acid gas stream, such as H2S, SO, SO2, and COS, to elemental sulfur to comply with rigorous environmental regulations regarding release of these components into atmosphere. SRU with Tail Gas Treating Unit (TGTU) was simulated using Aspen HYSYS simulation software, with actual plant data used to validate the model. MATLAB was integrated with Aspen HYSYS to optimize ten operating variables of SRU and (TGTU) using genetic algorithm without affecting Sulfur Recovery Efficiency (SRE). When the model was used, sulfur output increased by 2%, Net High-Pressure Steam (HPS) increased by 9%, and Low-Pressure Steam (LPS) decreased by 8%, resulting in an increase in (SRE). Using this approach, similar SRUs with varying feed conditions and properties might be optimized.

26 November 2021
Verified
Conference Paper
Closed access
AMAraby I. Mahdy
Araby I. Mahdy
AEAbdullah Elfar
Abdullah Elfar
The production scheduling with restricted machine availability problem is known to be NP-Hard problem since the time complexity increase exponentially with the required number of jobs increasing. This fact enforces researchers to find approximate solutions for these problems by heuristics and meta-heurisics. Another state-of-the-art solution methodology which may help solving the problem exactly and saves time is the cloud computing. By using parallel computing via cloud we solved larger problems exactly than those solved by total enumeration.The results showed that by using parallel computing via cloud and by adding more workers (represented here as processing cores) the problem solution speed up could be gained and problems with more number of jobs could be solved exactly by the proposed total enumeration algorithm.Cloud computing could be the next generation in the field of solving optimization techniques exactly.