The implementation of auctions of long-term firm energy call options and forward contracts as part of the instruments adopted in emerging countries to ensure resource adequacy is discussed. These mechanisms are being implemented in Latin American nations (Brazil, Chile, Peru, El Salvador and Panama) and fast-growing economies in Europe such as Turkey. Brazil has led this process and in overall has auctioned about 25,000 average MW of contracts, involving about 65 billion USD in financial transactions, while Chile has carried out its first auction in 2006, involving about 1,300 average MW (30% of energy sales of the main interconnected Chilean system expected for 2010). Overall, this mechanism is proving to be adequate to attract investments and ensure resource adequacy.
The optimal scheduling of hydrothermal systems requires the representation of uncertainties in future streamflows to devise a cost-effective operations policy. Stochastic optimization has been widely used as a powerful tool to solve this problem but results will necessarily depend on the stochastic model used to generate future scenarios for streamflows. Periodic autoregressive (PAR) models have been widely used in this task. However, its parameters are typically unknown and must be estimated from historical data, incorporating a natural estimation error. Furthermore, the model is just a linear approximation of the real stochastic process. The consequence is that the operator will be uncertain about the correct linear model that should be used at each period. The objective of this work is to assess the impacts of incorporating the uncertainty of the parameters of the PAR models into a stochastic hydrothermal scheduling model. The proposed methodology is tested with case studies based on data from the Brazilian hydroelectric system. It is shown that when the uncertainty of the parameters is ignored, the policies given by the stochastic optimization tend to be too optimistic.
10 January 2022 in IEEE Latin America Transactions
The Coronavirus outbreak has imposed different levels of stay-at-home orders worldwide to help contain the disease spread, thus promoting severe impacts over the global economy. The World Bank expects 90% of the world economy to go into recession, being this the most severe global economic crisis since the second world war. Consequently, electricity consumption has fallen sharply in many countries, so as in Brazil, what provoked critical effects over many electricity sector stakeholders. In this context, this article discusses the main consequences of COVID-19s outbreak over the Brazilian electricity sector and some measures taken by the government and the regulator to address such issues. Further, this work proposes a long-term electricity demand forecast methodology, taking into consideration bottom-up technics for general demand growth and top-down technics for the expansion of distributed generation in Brazil. The model uses as input economic forecasts from the World Bank, the International Monetary Fund and Brazilian market consolidated expectations disclosed by the Brazilian Central Bank. The model proves to be useful to long-term demand forecast by producing results adherent to official forecasts published by Brazilian governmental institutions.