Taha Teti̇k

Taha Teti̇k

Auto-generated profile, based on publicly available information

Taha Teti̇k

TUSAŞ – Türk Havacılık ve Uzay Sanayii A.Ş

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 May 2023 in Gazi University Journal of Science
Verified
Journal Article
Closed access
PDF file
TTTaha Teti̇k
Taha Teti̇k
GDGülesin Sena Daş
Gülesin Sena Daş
BBBurak Bi̇rgören
Burak Bi̇rgören
The development and launch of communication satellite projects pose significant challenges and costs. The expenses can range from several hundred million dollars, contingent on factors such as mission objectives, satellite system size and complexity including the launch vehicle, and ground infrastructure. Satellites must be designed to withstand harsh conditions in space, such as the extreme temperatures, radiation, and other hazards, while delivering reliable communication services to its users. However, once a satellite is launched, physical maintenance interventions become infeasible in the event of technical problems. Thus, reliability is a critical aspect for these expensive systems. This study aims to minimize the cost of a high-tech communication satellite by addressing design considerations that meet customer reliability requirements without exceeding power and redundant equipment limits. To achieve this goal, we propose an integer non-linear programming model in this research. To solve the satellite design problem, we adopt a two-stage solution approach. Conventional industrial practices in satellite design often involve iterative attempts to determine the redundancy level of onboard units based on customer reliability requirements. These processes rely heavily on the experience of design engineers who evaluate a limited number of alternatives to determine the number of redundant units, resulting in sub-optimal outcomes. In contrast, our proposed approach systematically handles the problem and yields optimal results. Our findings demonstrate that the proposed two-phase approach can achieve optimal redundancy levels within seconds.