Erkan Sunan

Erkan Sunan

Auto-generated profile, based on publicly available information

Erkan Sunan

TUBITAK Marmara Res Ctr, Energy Inst, Kocaeli, Turkey

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2009 in Energy Policy
Verified
Journal Article
Closed access
CGCihan Gokcol
Cihan Gokcol
BDBahtiyar Dursun
Bahtiyar Dursun
BABora Alboyaci
Bora Alboyaci
ESErkan Sunan
Erkan Sunan

6 May 2014 in IEEE Transactions on Energy Conversion
Verified
Journal Article
Closed access
ESErkan Sunan
Erkan Sunan
FKFuat Kucuk
Fuat Kucuk
HGHiroki Goto
Hiroki Goto
HGHai-Jiao Guo
Hai-Jiao Guo
OIOsamu Ichinokura
Osamu Ichinokura
A permanent magnet reluctance generator (PMRG), which is a type of switched reluctance machine (SRM) with magnets on stator yoke, has an extremely simple and robust structure and is suitable for variable speed applications such as wind energy conversion systems (WECSs). A three-phase asymmetric half-bridge (AHB) converter with a torque ripple minimization-assisted maximum power point tracking (MPPT) algorithm presents an effective control for a PMRG-based WECSs, which allows suppressing torque ripples arising from the nature of the PMRG while capturing maximum power from the wind. However, a single package of the converter is not available in the markets and hence, its construction by a user suffers from higher cost and lower reliability. In order to overcome the drawbacks of the AHB converter, this research introduces, for the first time, the use of full-bridge (FB) converter to drive the PMRG-based WECS. The three-phase FB converters, which have widespread use in practice, are commercially available in the markets. The FB converter with torque ripple minimization-assisted MPPT algorithm has been successively employed in the PMRG driven WECS. Performance of the control-converter combination has been experimentally tested on the three-phase 6/4 PMRG.

1 January 2013 in Journal of Renewable and Sustainable Energy
Verified
Journal Article
Closed access
PDF file
ESE. Sunan
E. Sunan
FKF. Kucuk
F. Kucuk
KRK. S. Raza
K. S. Raza
HGH. Goto
H. Goto
HGH. J. Guo
H. J. Guo
OIO. Ichinokura
O. Ichinokura
A permanent magnet reluctance generator (PMRG), which is the member of switched reluctance machine (SRM) family, has an extremely simple and robust structure: no winding on both rotor and stator. Required flux for energy conversion is provided by magnets buried in stator yokes. Thus, it seems to be suitable for wind energy conversion systems (WECSs) for reducing power generation cost to the level of fossil energy conversion systems. In a PMRG based conventional WECS, the PMRG is often accompanied by a simple diode bridge and a maximum power point tracking (MPPT) controlled converter. This type of converter topology does not allow utilizing any torque ripple minimization strategy. Thus, the system inevitably suffers from large torque ripples due to the doubly salient structure of both stator and rotor of the PMRG. Torque ripples propagate acoustic noise, vibrations, and mechanical stress in the turbine-shaft. Exposing to such ripples may result serious failure or damage in the WECS. In this paper, a novel algorithm consisting of MPPT and torque ripple control has been tested on the PMRG based WECS. The control strategy is applied to the system through an asymmetric half bridge (AHB) converter which is accepted to be a traditional converter for SRMs. The performance of control method has been verified under the conditions of constant and variable wind speed. Both simulation and experiment results prove that the control algorithm with the AHB converter allows significant torque ripple reduction in PMRG based WECS while generating power at its maximum point.

1 September 2010
Verified
Conference Paper
Closed access
ESErkan Sunan
Erkan Sunan
KRKazmi Syed Muhammad Raza
Kazmi Syed Muhammad Raza
HGHiroki Goto
Hiroki Goto
HGHai-Jiao Guo
Hai-Jiao Guo
OIOsamu Ichinokur
Osamu Ichinokur
A usual wind energy conversion system (WECS) suffers from significant amount of torque ripples even if the wind velocity remains constant. These torque ripples propagate mechanical stress in the turbine-generator drive train and may eventually lead to the failure of its various components. This research paper presents a unified control strategy which yields maximum power from WECS while minimizing the torque ripple through the instantaneous torque control. The permanent magnet reluctance generator (PMRG) employed in this research has a substantial advantage over a switched reluctance generator (SRG) that it does not require an external source for excitation. However similar to SRG, PMRG also exhibits large torque ripples. The torque ripple minimization in this research work has been achieved by controlling the torque distribution in the commuting phases of the generator. The generator torque is estimated through the pre-calculated phase reluctances obtained from the finite element analysis. The reference torque is generated by a maximum power point tracking (MPPT) algorithm in order to operate at the maximum efficiency. The effectiveness and superiority of the proposed unified control system has been established by comparing the results with the conventional controller that provides only MPPT.

1 January 2014 in IEEJ Journal of Industry Applications
Verified
Journal Article
Closed access
KNKenji Nakamura
Kenji Nakamura
ESErkan Sunan
Erkan Sunan
OIOsamu Ichinokura
Osamu Ichinokura

1 December 2014
Verified
Conference Paper
Closed access
ESErkan Sunan
Erkan Sunan
FKFuat Kucuk
Fuat Kucuk
HGHiroki Goto
Hiroki Goto
HGHai-Jiao Guo
Hai-Jiao Guo
OIOsamu Ichinokura
Osamu Ichinokura
A permanent magnet reluctance generator (PMRG), which is a type of switched reluctance machine (SRM) with magnets on stator yoke, has an extremely simple and robust structure and is suitable for variable speed applications such as wind energy conversion systems (WECSs). A three-phase asymmetric half-bridge (AHB) converter with a torque ripple minimization-assisted maximum power point tracking (MPPT) algorithm presents an effective control for a PMRG-based WECSs, which allows suppressing torque ripples arising from the nature of the PMRG while capturing maximum power from the wind. However, a single package of the converter is not available in the markets and hence, its construction by a user suffers from higher cost and lower reliability. In order to overcome the drawbacks of the AHB converter, this research introduces, for the first time, the use of full-bridge (FB) converter to drive the PMRG-based WECS. The three-phase FB converters, which have widespread use in practice, are commercially available in the markets. The FB converter with torque ripple minimization-assisted MPPT algorithm has been successively employed in the PMRG driven WECS. Performance of the control-converter combination has been experimentally tested on the three-phase 6/4 PMRG.