Zhiheng Sun

Zhiheng Sun

Auto-generated profile, based on publicly available information

Zhiheng Sun

China Institute of Water Resources and Hydropower Research, Beijing, 100038, China

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
19 July 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZWZhengxing Wang
Zhengxing Wang
JHJutao Hao
Jutao Hao
ZSZhiheng Sun
Zhiheng Sun
BMBaodong Ma
Baodong Ma
SXShifa Xia
Shifa Xia
XLXiulin Li
Xiulin Li
Two years after the Zhanghewan Pumped-Storage Power Station was put into operation, more than 500 blisters appeared in the asphalt concrete facing of the upper reservoir, and nearly half of them ruptured at the surface. The blistering mechanism of the asphalt concrete facing was studied in this paper. Through on-site inspection and coring inspection, it was found that the blistering was caused by the vapor pressure formed by the water enclosed in the middle of the impervious layer during high temperatures. Numerical analysis showed that the temperature 5 cm below the surface could reach 50–60 °C. Through numerical analysis and model tests, the internal water at this temperature may form a vapor pressure of 20 kPa. Finally, the blister size of the asphalt concrete facing at this temperature and pressure was studied with a model test. The possible sources of moisture inside the impervious layer were also analyzed through a core test, which found that moisture was most likely to be introduced by water spraying during rolling.

10 December 2019
Verified
Conference Paper
Open access
PDF file
ZCZhigang Cui
Zhigang Cui
ZSZhiheng Sun
Zhiheng Sun
MLMeng Li
Meng Li
JLJincheng Liu
Jincheng Liu
In view of damages that are common in anti-seepage coiled joints used in the water-sealing of the concrete faced rockfill dam junction surface, the construction method that uses SK hand scraping polyurea and tire base fabric to quickly repair the broken coiled joint is proposed. By polishing the surface of the commonly-used Ethylene-Propylene-Diene Monomer (EPDM) board coiled material and using a special BU primer, good adhesion can be ensured between the SK hand scraping polyurea and the EPDM board. The EPDM boards were joined by docked joints and lapped joints, the boards were coated with SK hand scraping polyurea and adhered with tire base fabric, and the tensile and peel tests are carried out. The results show that SK hand scraping polyurea and EPDM board is well bonded. The method using for the connection of EPDM board joints has the advantages of simple construction, high speed, good quality and good anti-seepage effect, and it has been successfully applied to repair of damages of concrete faced joints on Pushi River pumped storage power station in Liaoning and the Nazixia hydropower station in Qinghai.