Wonsuh Sung

Wonsuh Sung

Auto-generated profile, based on publicly available information

Wonsuh Sung

Zachry Department of Civil & Environmental Engineering, Texas A&M University, College Station, USA

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 July 2024 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
WSWonsuh Sung
Wonsuh Sung
Ki Il SongKi Il Song
Ki Il Song
KKKyoung-Yul Kim
Kyoung-Yul Kim
HRHee-Hwan Ryu
Hee-Hwan Ryu
Effective backfill grouting is crucial for the stability of Tunnel Boring Machine (TBM) tunnels. Insufficient grouting can lead to severe consequences, including groundwater seepage, surface settling, and cavity in the ground. This study introduces an innovative evaluation system using the impact-echo (IE) method to ensure the quality of backfill grouting behind segment linings. Through in-depth analysis of IE signals, three key indicators—Geometric Damping Ratio (GDR), Dominant Resonance Duration (DRD), and the number of post-peak amplitude Counts above 10% of the peak value after 1 millisecond (N10AMP)—have been identified, effectively capturing grouting quality in the near-surface zone. Despite the current limitations of solenoid hammers in terms of structural thickness applicability, our enhancements in the diversification of size, impact force, and contact time extend their utility, promising greater flexibility and precision in structural evaluations. This aligns with the evolving demands of modern tunnel engineering projects, ensuring compatibility and efficiency. The optimized automated IE approach was then applied to a real construction site segment, showcasing its superiority over conventional methods. Successfully deployed in two field locations, the system reliably assessed backfill grouting quality. This impact-echo system streamlines data acquisition with an automated solenoid, proving its field-ready capability. By ensuring proper backfill grouting, this novel IE system promotes safer, more efficient TBM tunnel construction with enhanced stability, safety, and reduced maintenance costs.

7 January 2025 in Structures
Verified
Journal Article
Closed access
WSWonsuh Sung
Wonsuh Sung
NPNikhil Potnuru
Nikhil Potnuru
SASuhaib Alfaris
Suhaib Alfaris
PSPetros Sideris
Petros Sideris
SPStephanie Paal
Stephanie Paal
SHStefan Hurlebaus
Stefan Hurlebaus