Paul Vincent Brogan

Paul Vincent Brogan

Auto-generated profile, based on publicly available information

Paul Vincent Brogan

School of Electronics, Electrical Engineering and Computer Science The Queen's University Belfast Ashby Building, Stranmillis Road Belfast BT9 5AH Northern Ireland

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2018 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
PBPaul Vincent Brogan
Paul Vincent Brogan
RBRobert J. Best
Robert J. Best
DMD. John Morrow
D. John Morrow
KMKenneth McKinley
Kenneth McKinley
MKMarek L. Kubik
Marek L. Kubik
Battery energy storage system (BESS) services will be of great help when operating power systems at high renewable energy penetrations. This paper demonstrates the requirements for effective frequency and inertia services. Some system operators currently apply scalars to financially reward improved performance. This paper demonstrates a method of validating and improving these scalars by considering the delay time and ramp time of the BESS. The importance of the method used to measure the rate of change of frequency is discussed in the paper. While rate of change of frequency services improve with reduced delivery times, limits are identified where further reductions produce negligible impact. This demonstrates the tangible benefits of a rapid response and that current technology could meet the criteria. A variety of BESS capacities are trialled which demonstrate consistency in performance and the occurrence of diminishing returns.

6 October 2020 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
RBRobert J. Best
Robert J. Best
PBPaul V. Brogan
Paul V. Brogan
DMD. John Morrow
D. John Morrow

3 June 2020 in IET Smart Grid
Verified
Journal Article
Open access
PDF file
PBPaul Vincent Brogan
Paul Vincent Brogan
RBRobert Best
Robert Best
JMJohn Morrow
John Morrow
RDRobin Duncan
Robin Duncan
MKMarek Kubik
Marek Kubik
Battery energy storage systems (BESSs) offer many desirable services from peak demand lopping/valley filling too fast power response services. These services can be scheduled so they enhance each other; in this manner, the inverter size is effectively leveraged with battery capacity. A variable cost for under‐frequency service provision will be required to incentivise this type of operation, and various options are explored in this study. It is demonstrated that BESSs may struggle for profitability under certain service payments; however, returns can be maximised through revenue stacking. In this study, enhanced service provision results in increased power system service provision and returns from energy arbitrage. A 10 and 2 years datasets, containing information on the Irish power system, are used to investigate potential per MW revenue from a BESS with a 1.5 and 2.5 h batteries. Three statistically derived, engineering‐based, power system service scalar multipliers are investigated and compared with the scalar being introduced on the Irish system. It is demonstrated that flexible service payments can be increased by more than 10% while receiving arbitrage payments. The seasonal variation in BESS revenue is investigated and observed to be mitigated or exacerbated by service scalars.

31 August 2018 in The Journal of Engineering
Verified
Journal Article
Open access
PDF file
PBPaul V. Brogan
Paul V. Brogan
RBRobert Best
Robert Best
JMJohn Morrow
John Morrow
HGHani Gharavi
Hani Gharavi
MKMarek Kubik
Marek Kubik
In this study, the development of a wide‐area, multi‐objective cost function is explained. The cost function is designed for implementation on wide‐area phasor measurement unit data. In this study, the cost function was applied to the IEEE 30 and 57 Bus models for monitoring and control purposes. Although the cost function was originally intended as a situational awareness tool that indicated system health; it has now been applied as a control metric for the operation of on‐load tap changing transformers on a variety of standard IEEE test systems. The system benefits, relative to conventional local control, are quantified. The primary metrics for testing protection outcomes are maximum voltage deviation and line thermal overload. The wide‐area optimisation is assessed from a voltage profile, reactive power demand, and transmission losses. The benefits of this type of wide‐area control are demonstrated in a variety of situations and environments.