Markus Zerlauth

Markus Zerlauth

Auto-generated profile, based on publicly available information

Markus Zerlauth

European Organization for Nuclear Research

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 December 2025 in The European Physical Journal C
Verified
Journal Article
Open access
MBM. Benedikt
M. Benedikt
FZF. Zimmermann
F. Zimmermann
BAB. Auchmann
B. Auchmann
WBW. Bartmann
W. Bartmann
JBJ. P. Burnet
J. P. Burnet
MZM. Zykova
M. Zykova
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools/reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. The content and structure of this report are guided by the scope and priorities defined in the mandate of the FCC Feasibility Study. It is therefore not intended to serve as an exhaustive review of the full physics potential of FCC. Several topics, already covered in earlier reports such as the FCC CDR, are not reiterated here or are addressed only briefly, in alignment with the study’s focus. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.

31 January 2024
Verified
Conference Paper
Open access
PDF file
MZMarkus Zerlauth
Markus Zerlauth
OBOliver Bruning
Oliver Bruning
This contribution summarizes the status of preparations and series production of key technologies for the HL-LHC upgrade project. The upgrade will be deployed in the LHC tunnel at the end of the currently ongoing third operational run of the LHC, by creating new underground areas and upgrading the existing LHC equipment, aiming to increase the data set collected by the main LHC experiments by another order of magnitude and starting operation as of 2029.

9 January 2024 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Open access
SYS. Yammine
S. Yammine
MBMarta Bajkó
Marta Bajkó
ABA. Ballarino
A. Ballarino
MBM. J. Bednarek
M. J. Bednarek
DBD. Bozzini
D. Bozzini
MZM. Zerlauth
M. Zerlauth
This contribution describes the experimental program already undergoing and to be completed on the High Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String, an important intermediate milestone of the HL-LHC project at CERN. First, it describes the magnet circuits of the HL-LHC IT String. Afterwards, the different systems installed to perform the experimental program are detailed. The proposed tests are defined for the validation of the cryogenic system, the full remote alignment system, the powering system, and the protection schemes of all magnets working in unison. This strategy will allow for a verification of the integrated powering system before the final installation and commissioning in the HL-LHC's underground areas.

11 August 2020 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PDF file
BLB. Lindstrom
B. Lindstrom
PBP. Bélanger
P. Bélanger
LBL. Bortot
L. Bortot
RDR. Denz
R. Denz
MMM. Mentink
M. Mentink
MZM. Zerlauth
M. Zerlauth
An energy of 362 MJ is stored in each of the two LHC proton beams for nominal beam parameters. This will be further increased to about 700 MJ in the future high luminosity LHC (HL-LHC) and uncontrolled beam losses represent a significant hazard for the integrity and safe operation of the machine. In this paper, a number of failure mechanisms that can lead to a fast increase of beam losses are analyzed. Most critical are failures in the magnet protection system, namely the quench heaters and a novel protection system called coupling-loss induced quench (CLIQ). An important outcome is that magnet protection has to be evaluated for its impact on the beam and designed accordingly. In particular, CLIQ, which is to protect the new HL-LHC triplet magnets, constitutes the fastest known failure in the LHC if triggered spuriously. A schematic change of CLIQ to mitigate the hazard is presented. A loss of the beam-beam kick due to the extraction of one beam is another source of beam losses with a fast onset. A significantly stronger impact is expected in the upcoming LHC Run III and HL-LHC as compared to the current LHC, mainly due to the increased bunch intensity. Its criticality and mitigation methods are discussed. It is shown that symmetric quenches in the superconducting magnets for the final focusing triplet can have a significant impact on the beam on short timescales. The impact on the beam due to failures of the beam-beam compensating wires as well as coherent excitations by the transverse beam damper are also discussed.

Verified
Conference Paper
Open access
MBMarta Bajkó
Marta Bajkó
SBStefano Bertolasi
Stefano Bertolasi
CBCaterina Bertone
Caterina Bertone
SBSebastien BLANCHARD
Sebastien BLANCHARD
DBDavide Bozzini
Davide Bozzini
MZMarkus Zerlauth
Markus Zerlauth
In the framework of the HL-LHC project, full-scale integration and operational tests of the superconducting magnet chain, from the inner triplet quadrupoles up to the first separation/recombination dipole, are planned in conditions as similar as possible to the final set-up in the LHC tunnel. The IT String includes all of the required systems for operation at nominal conditions, such as vacuum, cryogenics, warm and cold powering equipment, and protection systems. The IT String is intended to be both an assembly, and an integration test stand, and a full rehearsal of the systems working in unison. It will, closely reproducing the mechanical, electrical, and thermo-hydraulic interfaces of the final installation, as well as allowing a full rehearsal of the systems working in unison. This paper describes the conceptual design, the test stand’s reference configuration, and the main goals. It also summarizes the status of the main activities, including the detailed design of the test infrastructure, procurement of main equipment, the baseline installation schedule, and major milestones. The first version of the experimental program and the associated planning are also presented.

15 January 2025 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Open access
MBMarta Bajkó
Marta Bajkó
SBS. Blanchard
S. Blanchard
DBD. Bozzini
D. Bozzini
OBO. Bruning
O. Bruning
NGN. Heredia Garcia
N. Heredia Garcia
SYS. Yammine
S. Yammine
The objective of the High-Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String is to faithfully represent and validate, within a surface building at CERN, the installation and collective behavior of all major systems in the new HL-LHC IT zone. These systems encompass superconducting magnets, protection, cryogenics for the superconducting magnets and the superconducting link, powering, vacuum, alignment, interconnections between magnets, and the superconducting link itself. The construction of this test facility, intended to complete its validation program before the installation of equipment in the LHC tunnel, is currently in an advanced state. From the initial concept to the final design and implementation of the IT String, numerous challenges had to be addressed in both technical and management domains. This publication aims to outline and classify these challenges, providing detailed insights into the proposed solutions for the problems encountered. Following an introduction to the project and its structure, the publication will delve into challenges related to integration, scheduling, budget and resource estimates, installation aspects, responsibilities, collaborations between teams, safety, and communication. Finally, we will conclude summarizing the key challenges addressed and solutions implemented, and we will discuss the potential overall impact and benefits of the HL-LHC IT String test stand on the broader HL-LHC project.