Łukasz Kubica

Łukasz Kubica

Auto-generated profile, based on publicly available information

Łukasz Kubica

Cracow Univ Technol, Fac Comp Sci & Telecommun, PL-31155 Krakow, Poland

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 March 2018 in DEStech Transactions on Engineering and Technology Research
Verified
Journal Article
Open access
PDF file
BZBożena Zwolińska
Bożena Zwolińska
Katarzyna GrzybowskaKatarzyna Grzybowska
Katarzyna Grzybowska
ŁKŁ. Kubica
Ł. Kubica
Manufacturing a variety of final products in small (short) production series – requires the production systems to be flexible and to adapt almost instantly to the quickly changing customer requirements. Dynamics of changes and no predictability of system’s state in time t+1 lead to increase of the operational costs. It particularly affects those companies which are producing goods using make – to – order method in short series. This article describes research around a product for which 3 production technologies exist. The examined flow stream variants take into account a resources load with the tasks resulting from clients orders placed within Δt time. The goal of this article is to establish the parameters being the main determinants of production structure fluctuations.

13 August 2024 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
BZBożena Zwolińska
Bożena Zwolińska
ŁKŁukasz Kubica
Łukasz Kubica

1 June 2017 in Journal of Konbin
Verified
Journal Article
Open access
PDF file
BZBożena Zwolińska
Bożena Zwolińska
ŁKŁukasz Kubica
Łukasz Kubica
Managing company in the lean way presumes no breakdowns nor reserves in the whole delivery chain. However, achieving such low indicators is impossible. That is why in some production plants it is extremely important to focus on preventive actions which can limit damages. This article depicts the method of designating the critical damages in accordance with lean maintenance method. The article consists of two parts which make for an integral body. Part one depicts the characteristic of a realistic object, it also contains productions capabilities analysis of certain areas within the production structure. Part two depicts the probabilistic model of shaping maximal time loss basing on emptying and filling interoperational buffers.