19 December 2014 in Journal of Scheduling
1 August 2006 in Journal of Scheduling
27 December 2017 in Journal of Combinatorial Optimization
We consider the single channel PMU placement problem called the Power Edge Set problem. In this variant of the PMU placement problem, (single channel) PMUs are placed on the edges of an electrical network. Such a PMU measures the current along the edge on which it is placed and the voltage at its two endpoints. The objective is to find the minimum placement of PMUs in the network that ensures its full observability, namely measurement of all the voltages and currents. We prove that PES is NP-hard to approximate within a factor (1.12)-\(\epsilon \), for any \(\epsilon > 0\). On the positive side we prove that PES problem is solvable in polynomial time for trees and grids.
29 August 2009 in Algorithmica
4 July 2007 in Theory of Computing Systems
27 February 2018 in arXiv
A maximal independent set (MIS) can be maintained in an evolving $m$-edge graph by simply recomputing it from scratch in $O(m)$ time after each update. But can it be maintained in time sublinear in $m$ in fully dynamic graphs? We answer this fundamental open question in the affirmative. We present a deterministic algorithm with amortized update time $O(\min\{\Delta,m^{3/4}\})$, where $\Delta$ is a fixed bound on the maximum degree in the graph and $m$ is the (dynamically changing) number of edges. We further present a distributed implementation of our algorithm with $O(\min\{\Delta,m^{3/4}\})$ amortized message complexity, and $O(1)$ amortized round complexity and adjustment complexity (the number of vertices that change their output after each update). This strengthens a similar result by Censor-Hillel, Haramaty, and Karnin (PODC'16) that required an assumption of a non-adaptive oblivious adversary.