Jose Conto

Jose Conto

Auto-generated profile, based on publicly available information

Jose Conto

Electric Reliability Council of Texas, Taylor, TX, USA

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 November 2016
Verified
Conference Paper
Closed access
NSNA Samaan
NA Samaan
JDJe Dagle
Je Dagle
YMYv Makarov
Yv Makarov
RDRuisheng Diao
Ruisheng Diao
VAVallem
Vallem
SKSun Wook Kang
Sun Wook Kang
This paper shows how generic protection relay models available in planning tools can be augmented with settings that are based on NERC standards or best engineering practice. Selected generic relay models in Siemens PSS®E have been used in dynamic simulations in the proposed approach. Undervoltage, overvoltage, underfrequency, and overfrequency relays have been modeled for each generating unit. Distance-relay protection was modeled for transmission system protection. Two types of load-shedding schemes were modeled: underfrequency (frequency-responsive non-firm load shedding) and underfrequency and undervoltage firm load shedding. Several case studies are given to show the impact of protection devices on dynamic simulations. This is useful for simulating cascading outages.

20 August 2025 in IEEE Power and Energy Magazine
Verified
Journal Article
Closed access
JCJosé Conto
José Conto
YCYunzhi Cheng
Yunzhi Cheng
JRJonathan Rose
Jonathan Rose
JSJohn Schmall
John Schmall
ERCOT, the independent system operator (ISO) for the Texas region, USA, continuously assesses the reliability of its grid. With the increase of large loads interconnecting to the electric grid, including large data centers and crypto mining centers, maintaining grid reliability can become more challenging depending on the size of the load, its geographical location, its ramping controls, and network conditions. Further, a load’s lack of voltage ride-through (VRT) capability or frequency ride-through (FRT) capability could degrade system reliability. Additionally, these loads could introduce new vulnerabilities to sub-synchronous oscillations (SSO) or sub-synchronous control interactions (SSCI). This article will review realistic critical scenarios that require planning or operation level studies to assess reliability. These assessments will consider VRT and FRT tests with updated models, evaluations of large load on regions with known stability constraints, system impact of co-located load with generation, SSO/SSCI vulnerabilities and other similar reliability challenges.