Yoshihiro Shobuda

Yoshihiro Shobuda

Auto-generated profile, based on publicly available information

Yoshihiro Shobuda

J-PARC Center

Research Focus & Metrics

Academic Career Length

25Years (2002-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2012 in Progress of Theoretical and Experimental Physics
Verified
Journal Article
Open access
PDF file
HHHideaki Hotchi
Hideaki Hotchi
HHHiroyuki Harada
Hiroyuki Harada
NHNaoki Hayashi
Naoki Hayashi
MKMichikazu Kinsho
Michikazu Kinsho
PSPranab Saha
Pranab Saha
MSMasashi Shirakata
Masashi Shirakata
The 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) is a high-power pulsed proton driver aiming at 1 MW output beam power. The RCS was beam commissioned in October 2007 and made available for user operation in December 2008 with an output beam power of 4 kW. Since then, the output beam power of the RCS has been steadily increasing following progressions in beam tuning and hardware improvements. So far, the RCS has successfully achieved high-intensity beam trials of up to 420 kW at a low-level intensity loss of less than 1%, and the output beam power for the routine user program has been increased to 210 kW. The most important issues in increasing the output beam power are the control and minimization of beam loss to maintain machine activation within the permissible level. This paper presents the current status of the RCS beam power ramp-up, with particular emphasis on our approach to beam loss issues. The future prospects of RCS beam commissioning and operation are also described.

30 April 2009 in Physical Review Special Topics - Accelerators and Beams
Verified
Journal Article
Open access
PDF file
PSP. K. Saha
P. K. Saha
YSY. Shobuda
Y. Shobuda
HHH. Hotchi
H. Hotchi
NHN. Hayashi
N. Hayashi
TTT. Takayanagi
T. Takayanagi
YIY. Irie
Y. Irie
The 3 GeV Rapid Cycling Synchrotron (RCS) at Japan Proton Accelerator Research Complex is nearly at the operational stage with regard to the beam commissioning aspects. Recently, the design painting injection study has been commenced with the aim of high output beam power at the extraction. In order to observe the phase space footprint of the painting injection, a method was developed utilizing a beam position monitor (BPM) in the so-called single pass mode. The turn-by-turn phase space coordinates of the circulating beam directly measured using a pair of BPMs entirely positioned in drift space, and the calculated transfer matrices from the injection point to the pair of BPMs with several successive turns were used together in order to obtain the phase space footprint of the painting injection. There are two such pairs of BPMs placed in two different locations in the RCS, the results from which both agreed and were quite consistent with what was expected.

6 November 2002 in Physical Review E
Verified
Journal Article
Closed access
PDF file
YSYoshihiro Shobuda
Yoshihiro Shobuda
KYKaoru Yokoya
Kaoru Yokoya
Since the resistive wall impedance for a beam pipe of a nonround cross section depends on the coordinates of a witness particle, the witness particle receives an incoherent tune shift. When the expression for the impedance of an infinitely thick chamber is applied to the calculation of this tune shift, it becomes infinite. We have derived the resistive wall impedance for a chamber with a finite thickness and calculated the tune shift. There is no ambiguity in this expression for the tune shift, because it is automatically finite.

24 April 2007 in Physical Review Special Topics - Accelerators and Beams
Verified
Journal Article
Open access
PDF file
YSYoshihiro Shobuda
Yoshihiro Shobuda
YCYong Ho Chin
Yong Ho Chin
KTKoji Takata
Koji Takata
A gap in the vacuum chamber stands between a beam and the outside world, and the theoretical elucidation of the interaction mechanism between the gap and the beam is of great importance to understand the interaction of any device with the beam. In this paper, we will present the formulas for the longitudinal and transverse impedances due to a gap in the beam chamber. In this process, we will derive the complete solutions of electromagnetic fields effective in the entire region, including the inside and the outside of the chamber, in a form that they can be easily numerically evaluated. The newly developed technique can provide new methods of solutions of electromagnetic fields also for a rather broad class of structures such as cavities. The numerical results of impedances are consistent with the ABCI results and their behavior in high frequency agrees well with the prediction of the diffraction theory. Our theory can also accurately reproduce the behavior of the impedance near and above the cutoff frequencies. In addition, our theory is applicable even to the impedances for nonrelativistic beams. We found that the broadband impedance of the small cavitylike structure can be estimated from the gap size and the chamber radius only, regardless of the exact shape of the structure. We also found that the transverse impedance of a gap has a large resonance peak at the frequency where the wavelength is equal to the chamber circumference. This resonance peak appears around 1–2 GHz in most of the cases, and we should be careful to design a ceramic break so that this transverse mode will not leak out to interact with nearby devices.

31 May 2023 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PDF file
YSYoshihiro Shobuda
Yoshihiro Shobuda
HHHiroyuki Harada
Hiroyuki Harada
PSPranab Kumar Saha
Pranab Kumar Saha
TTTomohiro Takayanagi
Tomohiro Takayanagi
FTFumihiko Tamura
Fumihiko Tamura
MYMasanobu Yamamoto
Masanobu Yamamoto
At the Rapid Cycling Synchrotron (RCS) in Japan Proton Accelerator Research Complex (J-PARC), theoretical predictions have indicated that the kicker impedance would excite the beam instability. A 1-MW beam with large emittance can be delivered to the Material and Life Science Experimental Facility through suppression of the beam instabilities by choosing the appropriate machine parameters. However, we require other high-intensity and high-quality smaller emittance beams (than the 1-MW beam) for the main ring. Hence, we proposed a scheme for suppressing the kicker impedance by using prototype diodes and resistors, thereby demonstrating the effect on the kicker impedance reduction. However, the J-PARC RCS must be operated with a repetition rate of 25 Hz, which urged us to consider special diodes that are tolerant to heating. After developments, we have demonstrated that the special diodes with resistors can suppress the beam instability by reducing the kicker impedance. Enhanced durability of the prototype diodes and resistors for the 25-Hz operation was also realized. Moreover, the new diodes and the resistors have a negligible effect on the extracted beam from the RCS. From a simulation point of view, the scheme can be employed for at least 5-MW beam operation within the stipulated specifications.

20 June 2025 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PSP. K. Saha
P. K. Saha
HHH. Harada
H. Harada
FTF. Tamura
F. Tamura
KOK. Okabe
K. Okabe
MYM. Yoshimoto
M. Yoshimoto
HHH. Hotchi
H. Hotchi
At the 3-GeV rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex, we have minimized the beam loss at high-intensity beam operation up to the designed beam power of 1 MW. This was accomplished through systematic numerical simulations and experimental studies conducted over 2 years from 2020 and 2022. We first focused on mitigating uncontrolled beam losses originating from the foil scattering of the circulating beam, which results in high residual radiation levels, particularly in the injection area. These uncontrolled beam losses were well mitigated by reducing the stripper foil size and optimizing the injection beam size. Subsequently, we attempted to minimize the space charge effects and the associated beam losses at 1 MW by implementing several measures, such as refining both longitudinal and transverse injection paintings, correcting betatron resonances, and optimizing betatron tunes at injection. Consequently, we reduced beam losses throughout the RCS, including the collimator area, by 80% as compared to those observed at 1-MW trial operation in 2020. The residual beam loss at 1 MW is now estimated to be well below 10 − 3 , which is primarily attributed to residual foil scattering-induced beam losses. Notably, beam losses in areas other than the collimator section are uncontrolled and required to be well minimized to ensure stable operation and regular accelerator maintenance. We have considerably reduced the machine activation, achieving a 1-order-of-magnitude decrease at the collimator compared to that in 2020. This improvement has enabled the RCS to maintain more than 98% availability for user operation recently. The simulation and measurement results, demonstrating good agreement, provide a detailed understanding of the beam loss mechanism at each step and guide the implementation of effective optimizations.