The article presents the results of determining the power and ecological indicators of the implementation of innovative control technology of the Integrated Power System (IPS) of Ukraine using electric heat generators (EHG). This control technology is based on the use of modern principles of interaction of power-generating and heat-generating systems, which will take place during the performance of Daily curve of electricity load (DCEL) compaction processes controlled by the load of EHG complexes. The implementation of this control technology involves the introduction in the IPS from 1 GW to 2 GW of electric power EHG systems. A simplified method of calculating the amount of electricity to ensure the operation of EHG complexes during the year. During the compaction of DGEN in the hours of night falling during the year will be generated an additional 3,629 billion kWh of electricity. If this energy is generated by the existing coal-fired thermal power plants, an additional 1659.2 thousand tpp/year will be consumed. The thermal energy that will be produced at the EHG will reduce the consumption of natural gas for heating and the hot water by gas boilers of district heating systems. The operation of EHG complexes will save 353.5 million m3 of natural gas. The results of calculations of ecological and power indicators in the implementation of EHG for the control of IPS are presented for two successive stages. At the first stage, an increase in the minimum level of DCEL by 1 GW is considered. This will allow to move away from the daily practice of stopping 7-10 power units of coal-fired power plants. In the second stage, an increase in the minimum level of DCEL by another 1 GW is considered. This will allow to change about 25 maneuverable power units of TPPs with a capacity of 200 and 300 MW each to the basic mode of operation during the night falling of DCEL. With the use of this control technology it will be possible to form in the IPS self-sufficient reserves of shunting capacity for secondary and tertiary power regulation in the power system. Increasing the share of thermal power plants that will operate in the basic mode of electricity generation allows us to consider the possibility of replacing thermal generation with nuclear power plants in the future. Bibl. 16, Fig. 3, Tab. 4.
The article considers promising directions for the construction of new systems for regulating the generating capacity of nuclear, solar and wind power plants, capable of changing and improving the processes of managing the load regime of the unified energy system of Ukraine. Conducted studies have shown that with the implementation of new systems, there is a real opportunity to abandon modern but too expensive means of maneuverable generation, such as reserve stations with highly maneuverable TPPs, as well as frequency control support systems (FCS) using powerful storage batteries. In contrast to this, it is offered in the processes of managing the regime of the unified energy system of Ukraine, applying the new principles and means of regulating the generating capacities of NPPs, as well as WPPs and SPPs. For this, it will be necessary to create reserves from the automatically controlled load of powerful EC electric boilers in the OESU. At the same time, only the automated dispatching control system (ADСS) will perform the load regulation processes of powerful ECs. It is assumed that the information data on the current load regulation parameters of the ECs complexes will be sent to the ADСS from specialized tools built on the basis of the use of information and measurement technologies (IMT) developed at the Institute of General Energy on NAS of Ukraine. The result of the conducted research is the development of methodical approaches to the management of the OES regime, using new principles of regulation of generating capacities both in the power grid of NPPs and in the cities where WPPs and SES are installed. Keywords: power system, electric heat generators, load schedule, control system
Currently, the solution to the urgent issue of eliminating the shortage of maneuverable generating capacities existing in the United Energy System of Ukraine (UES) can be the introduction of automatically controlled complexes of powerful electric boilers (EB) into the existing automated dispatch control system (ADCS). The introduction of EB complexes to ADCS facilities will provide an opportunity to implement the processes of compacting the daily load schedule (SDEL), which will ensure the possibility of achieving better indicators of the energy, economic and environmental efficiency of the operation of the UES. For example, of in the energy region of the central energy system (CES), the issue of installing and using powerful electric boilers in the system of operating thermal power plants of cities is considered. The specifics of using powerful electric boilers in the summer season have been determined. The cited studies are of a recommendatory nature for the preparation and development of a new investment project. Keywords: Unified energy system, powerful electric boilers, automated dispatch control system (ADCS), schedule of daily electrical load (SDEL).