1 October 2025 in Ecological Engineering & Environmental Technology
Urban waste management has emerged as a critical public health and environmental issue globally, driven by rapid urbanization, population growth, and increased tourism. This study focuses on the urban waste management (UWM) scenario in Guwahati, one of the fastest-growing smart cities in the...
31 March 2026 in Water Practice & Technology
Watershed hydrology may face more difficulties in future due to changes in flow patterns, water-balance partitioning, and drought-related dynamics forced by climate change. This study uses a multi-model CMIP6 framework linked with SWAT hydrological modelling to examine climate change-induced hydrological responses and implications for drought behaviour in the Seonath Basin. A compromise-programming technique was used to evaluate 13CMIP6-GCMs, and MPI-ESM1-2-HR emerged as the most suitable model for recreating historical temperature and precipitation. A calibrated SWAT model was developed by bias-corrected projections under the SSP2-4.5 scenario that performed well during calibration (R²=0.87–0.91; NSE=0.86–0.90). Future climate simulations indicate substantial hydrological reorganization. A 15% increase in mean annual precipitation (1189 → 1365 mm) results in a 78% increase in surface runoff (218 → 389 mm), a more than fourfold increase in percolation to the shallow aquifer (62 → 321 mm), and an increase in deep aquifer recharge from 3.1 mm to 16.1 mm. Streamflow-to-precipitation rises from 0.25 to 0.43 while evapotranspiration-to-precipitation rises from 0.70 to 0.38, according to water-balance ratios at the basin outflow, suggesting faster hydrological performance and shorter soil-water residence times. Under situations of increased rainfall, the percolation-to-precipitation ratio rises significantly from 0.05 to 0.24, indicating improved subsurface routing.
8 February 2023 in Environmental Monitoring and Assessment
16 November 2022 in Research Square
Phytoremediation in the form of constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. Efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of the Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 0C. It has been observed that the pilot-constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.
19 August 2022 in Research Square
Phytoremediation in the form of constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. The efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 oC. It has been observed that the pilot constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 Kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.
22 December 2022 in Research Square
Phytoremediation also known as constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. Efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of the Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 0C. It has been observed that the pilot-scale constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.