Kailash Rajaram Harne

Kailash Rajaram Harne

Auto-generated profile, based on publicly available information

Kailash Rajaram Harne

Department of Civil Engineering, Netaji Subhas University of Technology, Dwarka, New Delhi 110078, India

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2025 in Ecological Engineering & Environmental Technology
Verified
Journal Article
Open access
MCMcdonald Choudhury
Mcdonald Choudhury
MSMeenakshi Suhag
Meenakshi Suhag
PJPriyanka Jha
Priyanka Jha
KHKailash Rajaram Harne
Kailash Rajaram Harne
Palas SamantaPalas Samanta
Palas Samanta
RCRAKESH CHOUDHARY
RAKESH CHOUDHARY
Urban waste management has emerged as a critical public health and environmental issue globally, driven by rapid urbanization, population growth, and increased tourism. This study focuses on the urban waste management (UWM) scenario in Guwahati, one of the fastest-growing smart cities in the...

31 March 2026 in Water Practice & Technology
Verified
Journal Article
Open access
CDChitaranjan Dalai
Chitaranjan Dalai
PRP.KISHORE KUMAR REDDY
P.KISHORE KUMAR REDDY
KMKashfina Kapadiya Memon
Kashfina Kapadiya Memon
CKChandan Kumar
Chandan Kumar
DPDeepak Parashar
Deepak Parashar
RAMGOPAL SAHURAMGOPAL SAHU
RAMGOPAL SAHU
Watershed hydrology may face more difficulties in future due to changes in flow patterns, water-balance partitioning, and drought-related dynamics forced by climate change. This study uses a multi-model CMIP6 framework linked with SWAT hydrological modelling to examine climate change-induced hydrological responses and implications for drought behaviour in the Seonath Basin. A compromise-programming technique was used to evaluate 13CMIP6-GCMs, and MPI-ESM1-2-HR emerged as the most suitable model for recreating historical temperature and precipitation. A calibrated SWAT model was developed by bias-corrected projections under the SSP2-4.5 scenario that performed well during calibration (R²=0.87–0.91; NSE=0.86–0.90). Future climate simulations indicate substantial hydrological reorganization. A 15% increase in mean annual precipitation (1189 → 1365 mm) results in a 78% increase in surface runoff (218 → 389 mm), a more than fourfold increase in percolation to the shallow aquifer (62 → 321 mm), and an increase in deep aquifer recharge from 3.1 mm to 16.1 mm. Streamflow-to-precipitation rises from 0.25 to 0.43 while evapotranspiration-to-precipitation rises from 0.70 to 0.38, according to water-balance ratios at the basin outflow, suggesting faster hydrological performance and shorter soil-water residence times. Under situations of increased rainfall, the percolation-to-precipitation ratio rises significantly from 0.05 to 0.24, indicating improved subsurface routing.

8 February 2023 in Environmental Monitoring and Assessment
Verified
Journal Article
Closed access
PDF file
KHKailash Rajaram Harne
Kailash Rajaram Harne
HJHimanshu Joshi
Himanshu Joshi
RWRAJAN WANKHADE
RAJAN WANKHADE

16 November 2022 in Research Square
Verified
Preprint
Open access
PDF file
KHKailash Harne
Kailash Harne
HJHimanshu Joshi
Himanshu Joshi
Phytoremediation in the form of constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. Efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of the Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 0C. It has been observed that the pilot-constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.

19 August 2022 in Research Square
Verified
Preprint
Open access
PDF file
KHKailash Harne
Kailash Harne
HJHimanshu Joshi
Himanshu Joshi
RWRajan Wankhade
Rajan Wankhade
Phytoremediation in the form of constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. The efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 oC. It has been observed that the pilot constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 Kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.

22 December 2022 in Research Square
Verified
Preprint
Open access
PDF file
KHKailash Harne
Kailash Harne
HJHimanshu Joshi
Himanshu Joshi
Phytoremediation also known as constructed wetlands is an effective method of treatment of municipal as well as industrial wastewater. The efficacy of this method has already been tested in European and American countries and found to be the best method of wastewater treatment. Efforts have been made in the present work to check the efficacy of phytoremediation in the form of constructed wetlands under Indian climatic conditions. A pilot plant of constructed wetlands has been constructed on the premises of the Uttaranchal Jal Nigam Sewage treatment plant and municipal wastewater has been allowed to pass through the constructed wetland. It has been observed that BOD removal at 24 0C is governed by the equation Ce/Co = e-1.0042 x t and the removal rate constant of BOD has been observed to be 0.795 d-1 at 20 0C. It has been observed that the pilot-scale constructed wetland is bringing effluent BOD and TSS up to 20 mg/l and 30 mg/l respectively consistently for the duration under study. The values of hydraulic retention time, hydraulic loading, and organic loading for achieving this performance are found to be 1.75 days,13.22 cm/d, and 142.78 kg/ha. d respectively. Performance study of constructed wetland and the existing activated sludge treatment has shown that the percent removal for the parameters TSS, BOD, COD, and Fecal Coliforms is near to the same order except for TN and TP, where the activated sludge process unit shows higher removal than the constructed wetland.