Heng Kong

Heng Kong

Auto-generated profile, based on publicly available information

Heng Kong

Beijing Municipal Construction Group Co., Ltd., A40 Xingshikou Road, Haidian District, Beijing 100195, China

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 November 2021 in Catalysts
Verified
Journal Article
Open access
PDF file
JWJing Wang
Jing Wang
HKHeng Kong
Heng Kong
HZHaihong Zhong
Haihong Zhong
YJYu Jiang
Yu Jiang
FGFei Guo
Fei Guo
Yongjun FengYongjun Feng
Yongjun Feng
The oxygen reduction reaction (ORR) and oxygen evolution reaction (OER), namely, so-called oxygen electrode reactions, are two fundamental half-cell reactions in the energy storage and conversion devices, e.g., zinc–air batteries and fuel cells. However, the oxygen electrode reactions suffer from sluggish kinetics, large overpotential and complicated reaction paths, and thus require efficient and stable electrocatalysts. Transition-metal-based layered double hydroxides (LDHs) and their derivatives have displayed excellent catalytic performance, suggesting a major contribution to accelerate electrochemical reactions. The rational regulation of electronic structure, defects, and coordination environment of active sites via various functionalized strategies, including tuning the chemical composition, structural architecture, and topotactic transformation process of LDHs precursors, has a great influence on the resulting electrocatalytic behavior. In addition, an in-depth understanding of the structural performance and chemical-composition-performance relationships of LDHs-based electrocatalysts can promote further rational design and optimization of high-performance electrocatalysts. Finally, prospects for the design of efficient and stable LDHs-based materials, for mass-production and large-scale application in practice, are discussed.

30 April 2018 in Stavební obzor - Civil Engineering Journal
Verified
Journal Article
Open access
洪F洪贤 FU
洪贤 FU
HKHong Kong
Hong Kong
JWJinke Wu
Jinke Wu
In this study,criteria and blast ing technologies are introduced in order to control the stability ofsurrounding rock of tunnel built using drill and blast safety . The paper is composed of three parts,namely, a blast vibration propagation law in roof surrounding rock in close proximity to tunnel face,two formulae to calculate particle critical vibration velocity of shotcrete and key structural element atthe roof of tunnel, and innovative technologies of tunnel blasting . The blast vibration propagationlaw is the base to control the sta bility of surrounding rock during tunnel blast ing Based onMorhr Coulomb criterion and the dynamic analys is, two formulae to calculate the critical particlevibration velocity are proposed Based on a series of trial blasts using electronic detonators, tw oinnovative blasting technologies are derived. One is the blast holes detonated one by one by usingelectronic detonator , and another is the blast holes detonated by combining initiation system ofelectronic detonators and nonel detonators T he use of ele ctronic detonators in tunnel blasting notonly leads to a smaller blast vibration but also to a smaller extent of the EDZ (excavation damagedzone)

6 February 2018
Verified
Conference Paper
Closed access
Wenjun ZhangWenjun Zhang
Wenjun Zhang
MJMingming Jin
Mingming Jin
HLHuayang Lei
Huayang Lei
HKHeng Kong
Heng Kong
CGCaixia Guo
Caixia Guo
The soil settlement or heave of shield tunnel caused by tunneling excavation is a three dimensional problem. Based on the previous research results, this paper proposed a three dimensional unified equation to calculate the vertical soil displacement induced by ground loss under non-synchronous construction for double-tube shield tunnels. The equation takes into account the lag time of construction and the effect of soil consolidation. Analyzed results showed that the following vertical soil displacement can be obtained simultaneously through the equation: (a) at ground surface and any depth of ground, (b) along transversal and longitudinal direction, (c) under non-synchronous and synchronous construction, and (d) for single-tube tunnel and double-tube tunnels. Meanwhile, the equation can be applied to illustrate the two-dimensional and three-dimensional curves of vertical soil displacement. Compared with the monitoring data of shield tunnel section between Zaoying Station and Dongfeng Beiqiao Station in Beijing Metro Line 14, the rationality and applicability of the proposed equation were verified. The influencing factors and changing tendency of vertical soil displacement for shield tunnel were investigated by adopting the equation.