Eirini Konstantinou

Eirini Konstantinou

Auto-generated profile, based on publicly available information

Eirini Konstantinou

Institute for Manufacturing, University of Cambridge, Cambridge, UK

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2020 in Journal of Management in Engineering
Verified
Journal Article
Closed access
QLQiuchen Lu
Qiuchen Lu
Ajith Kumar ParlikadAjith Kumar Parlikad
Ajith Kumar Parlikad
PWPhilip Woodall
Philip Woodall
GRGishan Don Ranasinghe
Gishan Don Ranasinghe
Xiang XieXiang Xie
Xiang Xie
JSJennifer Schooling
Jennifer Schooling
A digital twin (DT) refers to a digital replica of physical assets, processes, and systems. DTs integrate artificial intelligence, machine learning, and data analytics to create living digital simulation models that are able to learn and update from multiple sources as well as represent and predict the current and future conditions of physical counterparts. However, current activities related to DTs are still at an early stage with respect to buildings and other infrastructure assets from an architectural and engineering/construction point of view. Less attention has been paid to the operation and maintenance (O&M) phase, which is the longest time span in the asset life cycle. A systematic and clear architecture verified with practical use cases for constructing a DT would be the foremost step for effective operation and maintenance of buildings and cities. According to current research about multitier architectures, this paper presents a system architecture for DTs that is specifically designed at both the building and city levels. Based on this architecture, a DT demonstrator of the West Cambridge site of the University of Cambridge in the UK was developed that integrates heterogeneous data sources, supports effective data querying and analysis, supports decision-making processes in O&M management, and further bridges the gap between human relationships with buildings/cities. This paper aims at going through the whole process of developing DTs in building and city levels from the technical perspective and sharing lessons learned and challenges involved in developing DTs in real practices. Through developing this DT demonstrator, the results provide a clear roadmap and present particular DT research efforts for asset management practitioners, policymakers, and researchers to promote the implementation and development of DT at the building and city levels.

1 June 2021 in Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
Verified
Journal Article
Closed access
QLQiuchen Lu
Qiuchen Lu
Xiang XieXiang Xie
Xiang Xie
Ajith Kumar ParlikadAjith Kumar Parlikad
Ajith Kumar Parlikad
JSJennifer Mary Schooling
Jennifer Mary Schooling
EKEirini Konstantinou
Eirini Konstantinou
With the rising adoption of building information modelling (BIM) for asset management within the architecture, engineering and construction sectors, BIM-enabled asset management during the operation and maintenance phase has been increasingly attracting more and more attention in both research and practice. This paper provides a comprehensive review and analysis of the development of state-of-the-art research and industry standards that impact on BIM and asset management within the operation and maintenance phase. However, in the aspects of both information richness and analytical capability, BIM is not always enough in delivering effective and efficient asset management, particularly in the operation and maintenance phase. Therefore, a framework for future development of smart asset management is proposed, integrating the concept of digital twins. Digital twins integrate artificial intelligence, machine learning and data analytics to create dynamic digital models that are able to learn and update the status of the physical counterpart from multiple information sources. The findings will contribute to inspiring novel research ideas and promote widespread adoption of digital-twin-enabled asset management within the operation and maintenance phase.

1 July 2019 in Automation in Construction
Verified
Journal Article
Closed access
EKEirini Konstantinou
Eirini Konstantinou
JLJoan Lasenby
Joan Lasenby
IBIoannis Brilakis
Ioannis Brilakis

1 July 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
EKEirini Konstantinou
Eirini Konstantinou
IBIoannis Brilakis
Ioannis Brilakis
Computer vision–based tracking methods are used to track construction resources for productivity and safety purposes. This type of tracking requires that targets be accurately matched across multiple camera views to obtain a three-dimensional (3D) trajectory out of two or more two-dimensional (2D) trajectories. This matching is straightforward when it involves easily distinguishable targets in uncluttered scenes. This can be challenging in industrial scenes such as construction sites due to congestion, occlusions, and workers in greatly similar high-visibility apparel. This paper proposes a novel vision-based method that addresses all these issues. It uses as input the output of a 2D vision-based tracking method and searches for potential matches in three sequential steps. It terminates only when a positive match is found. The first step returns the strongest candidate by correlating a segment of workers’ past 2D trajectories. The second uses geometric restrictions, whereas the third correlates color intensity values. The proposed method features a promising performance of 97% precision, 98% recall, and 95% accuracy.

24 May 2016
Verified
Conference Paper
Closed access
EKEirini Konstantinou
Eirini Konstantinou
IBIoannis Brilakis
Ioannis Brilakis
Three-dimensional (3D) paths of resources have been proposed in construction management, as an efficient way for measuring labor productivity. These paths are either extracted by using sensors such as global positioning system (GPS), radio frequency identification (RFID), and ultra-wideband (UWB), or based on cameras placed at jobsites for surveillance purposes. However, the tag-based methods are seriously limited by privacy conflicts since they are not welcome from the personnel. On the other hand, the computer vision based methods have not achieved full automation in measuring labour productivity because they require prior knowledge of the type of tasks performed in specific working zones. This is associated with the lack of depth information. For this purpose, this paper proposes a computationally efficient computer vision method for matching construction workers across different frames. Entity matching is a process that corresponds to a compulsory step prior to the calculation of the 3D position. The proposed matching method, is based on epipolar geometry, template and motion similarity features. The main result of this process is to provide a method for the acquisition of the 3D paths that compose the detailed profile of a construction activity in terms of both time and space.

1 June 2019 in Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
Verified
Journal Article
Closed access
EKEirini Konstantinou
Eirini Konstantinou
IBIoannis Brilakis
Ioannis Brilakis
Over the past decades, the construction industry lags further and further behind the manufacturing sector when productivity is considered. Current practices for managing labour productivity are labour intensive, time and cost consuming and error prone. They are mainly reactive processes initiated after the detection of a negatively influencing factor. Although research studies have been performed towards leveraging these limitations, a gap still exists in managing the labour productivity of multiple workers at the same time accurately, unobtrusively and cost and time efficiently. This paper proposes a trajectory-based method to address this gap. Firstly, a computer vision-based method extracts the three-dimensional (3D) trajectories of workers. Secondly, a clustering-based method converts the 3D trajectories into work cycles that depict the labour input. The proposed method features an accuracy of 84% in terms of inferring the total labour time spent on construction-related tasks – that is, direct work.