Walter Jose Quiroz Chavil

Walter Jose Quiroz Chavil

Auto-generated profile, based on publicly available information

Walter Jose Quiroz Chavil


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 July 2023 in International Journal of Professional Business Review
Verified
Journal Article
Open access
PDF file
NFNilthon Arce Fernández
Nilthon Arce Fernández
Flabio GutierrezFlabio Gutierrez
Flabio Gutierrez
MPManuel Emilio Milla Pino
Manuel Emilio Milla Pino
WCWalter Jose Quiroz Chavil
Walter Jose Quiroz Chavil
ARAdán Díaz Ruiz
Adán Díaz Ruiz
JSJaime Lucho Cieza Sánchez
Jaime Lucho Cieza Sánchez
Purpose: This work aims to minimize the penalty generated by delays in delivering construction projects operated by a single machine. Theoretical framework: The fundamental issues to develop this work are optimization and its application to delays in construction projects operated in their initial stage by a single machine. Design/Methodology/Approach: We presented a construction case study, developed an optimization model, implemented a computational optimization tool and obtained the optimal sequence to perform the tasks. Findings: The numerical results demonstrated the model’s usefulness in minimizing the penalty generated by delays in the delivery of projects. Research, practical & social implications: The benefit of this study is to help managers or decision-makers schedule their construction projects with limited resources and deadlines per activity to minimize penalty costs of delay. Originality/Value: Considering that the construction sector generates the largest labor force in Peru, the study has an important social value by providing a tool to improve operations and incentivize construction companies to continue operating. In addition, it provides a substantial basis for future work by applying optimization in a specific area of civil engineering. To our knowledge, no researcher or company in Peru has yet addressed this study.

17 September 2021 in Revista Científica Pakamuros
Verified
Journal Article
Open access
PDF file
NFNilthon Arce Fernández
Nilthon Arce Fernández
WCWalter Jose Quiroz Chavil
Walter Jose Quiroz Chavil
Flabio GutierrezFlabio Gutierrez
Flabio Gutierrez
LTLuis Rafael Tinedo
Luis Rafael Tinedo
JTJosé Luis Piedra Tineo
José Luis Piedra Tineo
La presente investigación tuvo por objetivo minimizar la penalidad total generada por el retraso en la entrega de proyectos operados por una máquina (retroexcavadora). Se empleó el método doble simplex de paso largo con el software GNU Octave (versión 6.2.0). Para estimar la fecha y el orden de entrega de los proyectos antes de la ejecución, se implementó un plan de trabajo para la máquina. La empresa Consultores & Ejecutores Jhothiza S.R.L. verificó los plazos de entrega ejecutando el modelo y concluyendo que la penalidad óptima fue de S/. 8100.