Hamish Macdonald

Hamish Macdonald

Auto-generated profile, based on publicly available information

Hamish Macdonald

Offshore Renewable Energy Catapult Glasgow UK

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 July 2022 in Wind Energy
Verified
Journal Article
Open access
OKOmer Khalid
Omer Khalid
Guangbo HaoGuangbo Hao
Guangbo Hao
CDCian Desmond
Cian Desmond
HMHamish Macdonald
Hamish Macdonald
FMFiona Devoy McAuliffe
Fiona Devoy McAuliffe
WHWeifei Hu
Weifei Hu
Marine operations required to transfer technicians and equipment represent a significant proportion of the total cost of offshore wind. The profile of sites being considered for floating offshore wind farms (FOWFs), e.g., further from the shore and in harsher environments, indicates that these costs need to be assessed by taking into account the maintenance requirements and restricted weather windows. There is an immediate need to investigate the potential use of robotic systems in the wind farm's operations and maintenance (O&M) activities, to reduce the need for costly manned visits. The use of robotic systems can be critical, not only to replace repetitive activities and bring down the levelised cost of energy but also to reduce the health and safety risks by supporting human operators in performing the desired inspections. This paper provides a review of the state of the art in the applications of robotics for O&M of FOWFs. Emerging technology trends and associated challenges and opportunities are highlighted, followed by an outline of the agenda for future research in this domain.

23 April 2015 in Wind Energy
Verified
Journal Article
Open access
PDF file
HMHamish Macdonald
Hamish Macdonald
DIDavid Infield
David Infield
DNDavid H. Nash
David H. Nash
Margaret StackMargaret Stack
Margaret Stack
Wind turbines can be subject to a wide range of environmental conditions during a life span that could conceivably extend beyond 20 years. Hailstone impact is thought to be a key factor in the leading edge erosion and damage of the composite materials of wind turbine blades. Using UK meteorological data, this paper demonstrates that the rotational speed is a crucial factor in determining the magnitude of the kinetic energy associated with singular impact and is likely to be significant for incidents of hail. An improved representation of hail characteristics, occurrence probabilities and realistic impact component velocities is also proposed, from which the prospect of individual impact by large hailstones is found to be very scarce. Instead, the damage posed by multiple impacts throughout wind turbine operation is assessed. The annual average cumulative impact energy for a high frequency of hail case study is determined and evaluated against example composite failure threshold energies in the literature. © 2015 The Authors. Wind Energy published by John Wiley & Sons Ltd.

23 November 2023 in Wind Energy
Verified
Journal Article
Open access
OKOmer Khalid
Omer Khalid
Guangbo HaoGuangbo Hao
Guangbo Hao
HMHamish MacDonald
Hamish MacDonald
ACAubryn Cooperman
Aubryn Cooperman
FMFiona Devoy McAuliffe
Fiona Devoy McAuliffe
CDCian Desmond
Cian Desmond
Operations and maintenance (O&M) of floating offshore wind farms (FOWFs) poses various challenges in terms of greater distances from the shore, harsher weather conditions, and restricted mobility options. Robotic systems have the potential to automate some parts of the O&M leading to continuous feature‐rich data acquisition, operational efficiency, along with health and safety improvements. There remains a gap in assessing the techno‐economic feasibility of robotics in the FOWF sector. This paper investigates the costs and benefits of incorporating robotics into the O&M of a FOWF. A bottom‐up cost model is used to estimate the costs for a proposed multi‐robot platform (MRP). The MRP houses unmanned aerial vehicle (UAV) and remotely operated vehicle (ROV) to conduct the inspection of specific FOWF components. Emphasis is laid on the most conducive O&M activities for robotization and the associated technical and cost aspects. The simulation is conducted in Windfarm Operations and Maintenance cost‐Benefit Analysis Tool (WOMBAT), where the metrics of incurred operational expenditure (OPEX) and the inspection time are calculated and compared with those of a baseline case consisting of crew transfer vessels, rope‐access technicians, and divers. Results show that the MRP can reduce the inspection time incurred, but this reduction has dependency on the efficacy of the robotic system and the associated parameterization e.g., cost elements and the inspection rates. Conversely, the increased MRP day rate results in a higher annualized OPEX. Residual risk is calculated to assess the net benefit of incorporating the MRP. Furthermore, sensitivity analysis is conducted to find the key parameters influencing the OPEX and the inspection time variation. A key output of this work is a robust and realistic framework which can be used for the cost‐benefit assessment of future MRP systems for specific FOWF activities.

1 August 2019 in Wear
Verified
Journal Article
Closed access
HMHamish Macdonald
Hamish Macdonald
DNDavid Nash
David Nash
Margaret StackMargaret Stack
Margaret Stack

1 July 2014
Verified
Conference Paper
Closed access
HMHamish Macdonald
Hamish Macdonald
GHGraeme Hawker
Graeme Hawker
KBKeith Bell
Keith Bell
During high wind speed shutdown (HWSS) events, the power outputs of wind power plants may be subject to high ramp rates, causing issues for the System Operator (SO) in predicting total wind output, allocating adequate reserve levels and minimising balancing costs. As the timing of these events is difficult to predict, it is proposed that individual turbines may be used as probabilistic early warning indicators of HWSS events across sites, and by extension to a wide geographical area. The shut-down history of two separate wind farms across Scotland is analysed to determine the likelihood and impact of such events. It is shown that in most cases, HWSS does not result in the full loss of availability. Factors such as turbine elevation and mean wind exposure are key indicators of the order of shut-down across a site. The suggestion that sites could be used as early warning indicators for the pattern of HWSS across a transmission zone is difficult to characterise and for the two wind farms studied, prediction was not consistent.