7 December 2017 in Complexity
Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs) and support vector machines (SVM) are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.
1 January 2015 in Procedia Engineering
Taking into consideration the significant impact of working force on the quality of realization of a construction process from the aspect of safety at work, it is essential to be familiar with the features of construction workers and identify their risk groups. Within the research, the analysis was carried out examining the influence of experience of workers in construction jobs at which they suffered an injury, along with the analysis of the influence of workers’ age on the occurrence of injuries. The type of works has an impact on the occurrence an injury only in the case when the works are realized by workers with less than 4 years of experience. It was determined that those types of works which require a certain level of professional training account for a smaller number of injuries compared with those types of work where “physical” work is dominant
1 January 2016 in Procedia Engineering
30 June 2023 in Social informatics journal
Architectural, engineering and construction (AEC) industry has large amounts of data, the analysis of which can predict risks such as project delays, project budget overruns, low resource use efficiency, environmental damage, reduced safety, and the like. Research has shown that 98% of construction projects are realized with the contracted budget and deadline exceeded. This paper aims to show the significant potential and possibilities of applying artificial intelligence (AI) in the AEC industry, pointing out the benefits and obstacles faced by the AEC industry during the implementation of AI. The benefits of applying AI in the AEC industry relate to increasing efficiency, reducing costs, increasing productivity, increasing safety, better planning and providing timely and accurate information. The key obstacles that hinder the implementation of AI in practice are high implementation costs, incomplete data, job loss due to automation, mistrust of AI technology, cyber vulnerability, and lack of understanding field of AI.
22 December 2021 in Waste Management & Research: The Journal for a Sustainable Circular Economy
Managing asbestos streams in developing and transition countries is particularly challenging. Deficiencies are often present for adequate procedures for the management of asbestos waste; solid quality data or databases on the quantities of asbestos production and usage are missing and asbestos inventories or the registry of asbestos-related diseases following European Union (EU) or other regulations are not in place. This paper aims to develop a model for determining and assessing the quantity of asbestos in the built environment of a transition country. Quantities of asbestos products and life expectancy of those products were assessed to develop a model that forecasts flows and stocks of asbestos products and wastes. The overall objective is to evaluate the model and show the manifestation of asbestos in the waste stream in a case study on a country with a transition economy, such as Serbia. Results show that total quantities of asbestos fibre consumption are approximately 0.5 million tonnes; the largest amount of waste generation is expected in the 2020s. Therefore, it is necessary to prepare for the forthcoming quantities of waste by improving legal procedures, implementation of existing regulations, and provision of economic resources. An important link for the adequate management of asbestos waste is to raise public awareness of the dangers and importance of proper and timely disposal of asbestos products.
1 April 2016 in Tehnicki vjesnik - Technical Gazette
The paper considers the problem of selecting the most appropriate variation for the pipeline route Beloševac - Divci within the Kolubara regional water supply system (Serbia). Variations are evaluated according to five criteria, three...