Ying Hong

Ying Hong

Auto-generated profile, based on publicly available information

Ying Hong

School of Civil and Environmental Engineering, University of New South Wales, Sydney, Australia

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 August 2018 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
YHYing Hong
Ying Hong
AHAhmed Hammad
Ahmed Hammad
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
AAAli Akbarnezhad
Ali Akbarnezhad
Purpose: The purpose of this paper is to present a model for building information modelling (BIM) implementation at small and medium-sized construction contractor organisations (SMOs). The proposed BIM adoption model assesses BIM implementation benefits, costs and challenges faced by SMOs. Correlation between BIM adoption in SMOs and the associated impacting factors, including knowledge support and BIM adoption motivation, is captured through the model. Design/methodology/approach: A literature review of BIM adoption in construction was first presented. Research data, collected from 80 SMOs in Australia through a conducted survey, are then analysed. Descriptive analysis and structural equation modelling were used to investigate SMOs’ understanding of BIM, and to qualify the correlations among the proposed latent variables impacting BIM implementation at SMOs, respectively. Additionally, this study used χ2 test to compare differences between BIM users and non-BIM users regarding BIM understanding, interested applications and attitudes towards implementation benefits and challenges. Findings: Potential benefits associated with BIM implementation are a major motivation factor when it comes to BIM adoption at SMOs. In addition, existing staff’s capability in using BIM tools positively affects the establishment of an organisational knowledge-support system, which determines the decision of adopting BIM eventually. Ultimately, there is a need for further emphasis on staff engagement in the implementation process. Research limitations/implications: The results presented in this paper are applicable to SMOs in the building sector of construction. BIM implementation at organisations involved in non-building activities, including civil works and infrastructure, needs to be assessed in the future. Practical implications: The results indicate that rather than placing the focus mainly on benefits of BIM implementation, successful implementation of BIM in practice requires adequate effort to assess implementation problems, establish knowledge support and engage staff in using BIM. Originality/value: Results of this study provide an insight into the adoption challenges of BIM in SMOs, given that the focus of previous studies has been mostly placed on BIM adoption in architectural firms and large contractors.

1 November 2020 in Automation in Construction
Verified
Journal Article
Closed access
YHYing Hong
Ying Hong
AHAhmed W.A. Hammad
Ahmed W.A. Hammad
AAAli Akbarnezhad
Ali Akbarnezhad
MAMehrdad Arashpour
Mehrdad Arashpour


13 January 2022 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
JFJohn Patrick Fitzsimmons
John Patrick Fitzsimmons
RLRuodan Lu
Ruodan Lu
YHYing Hong
Ying Hong
IBIoannis Brilakis
Ioannis Brilakis
The UK commissions about £100 billion in infrastructure construction works every year. More than 50% of them finish later than planned, causing damage to the interests of stakeholders. The estimation of time-risk on construction projects is currently done subjectively, largely by experience despite there are many existing techniques available to analyse risk on the construction schedules. Unlike conventional methods that tend to depend on the accurate estimation of risk boundaries for each task, this research aims to proposes a hybrid method to assist planners in undertaking risk analysis using baseline schedules with improved accuracy. The proposed method is endowed with machine intelligence and is trained using a database of 293,263 tasks from a diverse sample of 302 completed infrastructure construction projects in the UK. It combines a Gaussian Mixture Modelling-based Empirical Bayesian Network and a Support Vector Machine followed by performing a Monte Carlo risk simulation. The former is used to investigate the uncertainty, correlated risk factors, and predict task duration deviations while the latter is used to return a time-risk simulated prediction. This study randomly selected 10 projects as case studies followed by comparing their results of the proposed hybrid method with Monte Carlo Simulation. Results indicated 54.4% more accurate prediction on project delays.

24 March 2019 in Construction Management and Economics
Verified
Journal Article
Closed access
YHYing Hong
Ying Hong
AHAhmed Hammad
Ahmed Hammad
AAAli Akbarnezhad
Ali Akbarnezhad
Building Information Modelling (BIM) is perceived as an effective tool for improving the delivery and coordination of construction projects. The Chinese construction sector has demonstrated significant interest in implementing the 3-dimensional modelling-based process. BIM adoption is influenced by several factors which can either be operational or strategic related. Factors which can have a significant impact include the size of the construction organization and the type of projects that the organization has to deliver (i.e. building vs infrastructure projects). This study aims to evaluate the effect of project type and size on BIM adoption in the Chinese market, via an adoption model which analyses factors impacting the adoption decision. The study examines 200 samples collected from the Chinese construction industry, split equally between infrastructure and building construction data groups, as well as SMEs and large organizations. The collected data are first analyzed by principal component analysis and then through a Structural Equation Modelling-based multiple group analysis. Results demonstrate that essential factors such as operational risks are considered by small organization, whereas large organizations focus on implementation challenges. Implementation benefits and challenges are significant on the adoption decision in infrastructure organizations, but not in building organizations. In addition, the study reveals that “technical support” is an important factor when it comes to BIM adoption among all types of organizations, regardless of the organization’s size and project type delivered.

1 February 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
YHYing Hong
Ying Hong
AHAhmed Hammad
Ahmed Hammad
XZXiaoyang Zhong
Xiaoyang Zhong
BWBeibei Wang
Beibei Wang
AAAli Akbarnezhad
Ali Akbarnezhad
The growing rate of building information modeling (BIM) adoption inevitability adds to the importance of understanding the BIM adoption decision-making process. Several models based on systematic surveys are available in the literature to formulate the BIM adoption decision-making process. It is still, however, not clear whether the decision parameters in these models are universally important. This study examines the main attributes of the BIM adoption decision-making process in China and Australia. An adoption model developed earlier for Australia is tested for Chinese data collected from 103 small and medium construction companies (SMEs). By highlighting model fitness issues, the model is then reconstructed for comparing BIM adoption in cross-cultural contexts. Data are analyzed using a logistic regression to understand the main factors impacting BIM adoption. Structural equation modeling based on multigroup analysis is also adopted in the analysis. The analysis indicates that Australian construction SMEs adopt BIM to solve organizational collaboration problems and improve workflow efficiency, whereas Chinese construction SMEs adopt BIM to improve organizational technical ability. The results of this study highlighted the Chinse companies tend to be more careful during the implementation of new technology to minimize uncertainty, whereas BIM adoption decision makers in Australian companies are more focused on change management and empowering subordinates.