Aibolat Karatayev

Aibolat Karatayev

Auto-generated profile, based on publicly available information

Aibolat Karatayev


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2020 in Mining of Mineral Deposits
Verified
Journal Article
Open access
BBBorys Blyuss
Borys Blyuss
YSYevhen Semenenko
Yevhen Semenenko
OMOlha Medvedieva
Olha Medvedieva
SKSerhii Kyrychko
Serhii Kyrychko
AKAibolat Karatayev
Aibolat Karatayev

30 June 2026 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
EKElvira Khalikova
Elvira Khalikova
AZAila Zhumabekova
Aila Zhumabekova
AVA V
A V
DSDinara Syzdykbaeva
Dinara Syzdykbaeva
GSGulmira Sattarova
Gulmira Sattarova
KAKaratayev Aibolat
Karatayev Aibolat
Purpose. To investigate the stress-strain state of the coal-rock mass surrounding a gob-side development roadway and to justify its support parameters under the mining conditions of the Karaganda Coal Basin. Methods. The study was based on geomechanical modeling of the coal-rock mass surrounding a roadway driven adjacent to the goaf of a previously extracted longwall panel and separated from it by a limited-width coal pillar. The simulations were performed in ANSYS using the finite element method in 2D. The computational model incorporated the goaf, protective coal pillar, stratified structure of the surrounding rocks, mining depth, physical and mechanical rock properties, loading conditions, and roadway support parameters. The stress-strain state and strength factor were additionally assessed in Rocscience RS2 for a ventilation roadway driven along the boundary of the goaf. Findings. The width and strength of the coal pillar were found to affect stress redistribution around the gob-side roadway significantly. A limited-width pillar shifted the peak maximum stress 5-10 m deeper into the intact coal mass and reduced its magnitude by approximately 1.6 times compared with the pillarless configuration. Stresses directly above the roadway decreased by a factor of 1.2-1.3. Increasing the pillar strength or its width to 20 m reduced the maximum stresses in the rock mass by almost twofold. The RS2 simulations showed that increasing the mining depth from 450 to 700 m increased the maximum principal stresses by a factor of 1.7-1.9 and the roadway contour displacements by a factor of 1.2-1.35. Originality. Relationships governing stress redistribution and the formation of reduced-stability zones around gob-side development roadways were established as functions of coal pillar parameters, mining depth, and roadway support conditions. Practical implications. The results provide a geomechanical basis for selecting support schemes for gob-side roadways located within zones of elevated rock pressure.

30 June 2025 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
VDVladimir Demin
Vladimir Demin
EKElvira Khalikova
Elvira Khalikova
AVA V
A V
DSDinara Syzdykbaeva
Dinara Syzdykbaeva
AKAibolat Karatayev
Aibolat Karatayev
MMMurat Gazizovich Mustafin
Murat Gazizovich Mustafin
Purpose. The research is aimed at developing scientifically sound principles of the technology for maintaining mine workings to ensure their stability during mining of coal seams in the Karaganda coal basin (Republic of Kazakhstan). The influence of fastening parameters on strengthening effect under conditions of controlled stress-strain state of the “host rocks – fastening elements” system is studied. Methods. The study includes an analysis of scientific-practical experience in operating mine workings and conditions for conducting underground operations. The stress-strain state of the mass is assessed by the finite element method in two-dimensional formulation using the RS2 software package. The inelastic deformation zones are calculated taking into account the geological-technological factors influencing the behavior of the mass in the area of the cutting zonal extraction workings. Findings. For the first time, the patterns of change in the sizes of plastic deformation zones and stressed areas around mine workings with different technological fastening solutions have been quantified. The dependence of the stress-strain state on the characteristics and geometry of the fastening system has been revealed. Originality. The patterns of changes in the size of deformation and stress zones in the vicinity of mine workings at different techno-logical fastening schemes have been determined. The dependence of the stress-strain state of the mass on the parameters of the fastening systems has been revealed. Practical implications. Scientifically sound recommendations have been developed for the technology of fastening cutting ventilation mine workings using two-level roof-bolting systems in the case of stable roof layers. The optimum parameters for fastening operational mine workings that provide stability at different depths of seam occurrence have been substantiated.

26 November 2021 in Горный журнал Казахстана
Verified
Journal Article
Closed access
ҚҚҚ.ә. Қалмұрзаев
Қ.ә. Қалмұрзаев
АҚА.д. Қаратаев
А.д. Қаратаев
АЖА.е. Жумабекова
А.е. Жумабекова
Бүгінгі таңда, тау жыныстары сілемнің тау-кен соққысына қауіптілігін бағалау үшін қазбаларды жүргізу кезінде теспелерді бұрғылау арқылы анықтайтын геомеханикалық әдіс және арнайы құралдың көмегімен анықтайтын геофизикалық әдіс кеңінен қолданылады. Малеев кенорнында қазбаларды өту кезінде жарылыс пен желдету жұмыстарынан кейін, алдын – ала арнайы бұрғыланған теспелерге тау жыныстардың акустикалық эмиссиясын өлшейтін құрылғыны орнатып, микросоққылардың жилігі өлшенеді және оның тау-кен соққысына бейімділігі анықталады. Осы мәліметтердің негізінде, тау-кен соққыларына бейім тау жыныстарыдың түрлері мен аймақтарын анықтау арқылы тау-кен жұмыстарының қауіпсіздігін қамтамасыз ететін тиімді шараларды табуға мүмкіндік береді. В настоящее время для оценки склонности массива горных пород к удароопасноти широко используются: геомеханический метод (с помощью бурения шпуров при проходке горных выработок) и геофизический метод (определение параметров геофизико-акустической эмиссии горных пород с помощью специального прибора). На нижних горизонтах Малеевского месторождения после взрывных работ и проветривания горных выработок в предварительно пробуренные скважины устанавливают прибор для измерения акустической эмиссии горных пород и определяются частоты микроударов и склонность к горным ударам. На основании полученных данных определяются критерии категории удароопасности по параметрам акустической эмиссии типов горных пород и активные удароопасные зоны с целью определения эффективных мер по снижению рисков удароопасности для обеспечения безопасного ведения горных работ. Currently, to assess the tendency of a rock mass to rock bump hazard, the geomechanical method is widely used by drilling boreholes when driving mine workings and the geophysical method is to determine the parameters of geophysical-acoustic emission of rocks using a special device. On the lower horizons of the Maleevskoye deposit, after blasting and ventilation of mine workings, a device is installed in pre-drilled wells to measure the acoustic emission of rocks and the frequencies of micro-impacts and the tendency to rock bursts are determined. Based on the data obtained, criteria for the category of rock bump hazard are determined by the parameters of acoustic emission of rock types and active rock bump hazard zones in order to determine effective measures to reduce the risk of rock bump hazard to ensure safe mining works.