Thong Jia Wen

Thong Jia Wen

Auto-generated profile, based on publicly available information

Thong Jia Wen

Faculty of civil Engineering, Universiti Teknologi Malaysia, Johor Bahru, Malaysia

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 December 2024 in Civil and Environmental Engineering Reports
Verified
Journal Article
Open access
AVAnees Ahmed Vighio
Anees Ahmed Vighio
Rozana ZakariaRozana Zakaria
Rozana Zakaria
FAFaridahanim Ahmad
Faridahanim Ahmad
VIKNESWARAN MUNIKANANVIKNESWARAN MUNIKANAN
VIKNESWARAN MUNIKANAN
NWNoraziah Wahi
Noraziah Wahi
Joanna Agnieszka PawłowiczJoanna Agnieszka Pawłowicz
Joanna Agnieszka Pawłowicz
The global warming incremental impacts such as temperature, precipitation, rise in sea level, and extreme weather events are indeed being observed globally. In recent decades, energy demand and greenhouse gas emissions have increased due to buildings being designed with active cooling and heating solutions, despite global attempts to reduce energy consumption. About 50 percent of all energy use is attributed to buildings. There has been a debate for Decades on building active and passive design, but very limited studies have been carried out to confirm the Overall Thermal Transfer Value (OTTV) during the operation phase of the building. This paper highlights the analysis of OTTV in the Passive Design Strategies using several conditions of glazing facades. The passive design of glazing facade strategies includes the variation in opaque wall Colour with different values of the coefficient of solar absorption, change in glazing type (U-Value and Shading Coefficient), and the decrease in the size of the openings. Building parameters were collected and OTTV was determined using the equation in Malaysian Standard MS 1525 for Energy Efficiency. The OTTV was then compared to the recommended value for Malaysia’s tropical climate. Results showed that different paint Colours improved OTTV by up to 23.05%, changing glazing type reduced OTTV from 76.93 W/m² (Base case) to 64.12 W/m² (Double Low-E, e2=.1 Tint green), and reducing glass area by 10% lowered OTTV to 62.24 W/m².Whereas, by combining the Type of Glazing and White facade Colour the OTTV was reduced to 39.68%. It is concluded that this OTTV analysis enhances building energy efficiency and reduces cooling loads.

1 May 2025 in Journal of Applied Engineering Sciences
Verified
Journal Article
Open access
PDF file
NSNg Hock Seng
Ng Hock Seng
NTNg Chiew Teng
Ng Chiew Teng
TWThong Jia Wen
Thong Jia Wen
MSMOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
MOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
SMSuzila Mohd
Suzila Mohd
Poi Ngian ShekPoi Ngian Shek
Poi Ngian Shek
The construction industry is undergoing a significant transformation driven by advancements in Building Information Modelling (BIM) and robotics, which are key elements of the Fourth and Fifth Industrial Revolutions. While BIM facilitates collaborative information management throughout a building’s lifecycle, robotics introduces automation and precision in construction tasks. The integration of BIM-robotics has the potential to enhance safety, productivity and efficiency in construction. However, the adoption of BIM-robotics remains underexplored in Malaysia. This study aims to evaluate the challenges of implementing BIM robotics in the Malaysian construction industry. A total of 22 secondary data sources were collected from a comprehensive literature review. A questionnaire survey was adopted for primary data collection. For data analysis, four statistical tests were conducted which are exploratory factor analysis (EFA), descriptive analysis, reliability analysis and correlation analysis. The main findings identified four key factors from the EFA, such as technological, organisational, environmental and financial. Descriptive analysis revealed the critical challenge within each factor, while reliability analysis confirmed strong internal consistency. All identified challenges were found to be positively correlated. By identifying the challenges to BIM-robotics adoption, this study provides valuable insights for policymakers, industry practitioners and researchers to create plans for overcoming these challenges. Ultimately, this study contributes to advancing the construction industry’s readiness for technological integration, aligning with national goals for Construction 4.0 and beyond.

2 July 2025 in International Journal of Building Pathology and Adaptation
Verified
Journal Article
Closed access
JCJing Yang Chin
Jing Yang Chin
CNChiew Teng Ng
Chiew Teng Ng
RSRadzuan Sa’ARi
Radzuan Sa’ARi
HNHock Seng Ng
Hock Seng Ng
JTJia Wen Thong
Jia Wen Thong
Purpose: In 2022, buildings were responsible for 30% of the world’s final energy demand and contributed to 26% of global greenhouse gas emissions. To achieve a high level of energy efficiency, it is imperative to consider energy retrofitting of existing buildings due to it forms most of the built environment. This research aims to propose an ideal strategy of energy retrofit measures to increase energy efficiency on one of existing public buildings by using Building Information Modelling (BIM)-based energy model. Design/methodology/approach: This research was conducted through three phases. The first phase was data acquisition where the current condition of the existing building was determined. The second phase was modelling process. The BIM-based energy model was created based on the building as-built condition. The third phase was strategies simulation which different strategies of energy retrofit measures were simulated to find the ideal strategy for the existing building. Findings: Research found out that the Heating, Ventilation, and Air-Conditioning (HVAC) system of existing buildings has the greatest potential to increase energy efficiency. The ideal strategy to implement found out to be strategy which replacing the HVAC systems to high-efficiency Variable Air Volume systems and reduce the Light Power Density by 60% through upgrading the lighting system. Originality/value: By integrating BIM with energy analysis, the post-retrofit energy consumption of different strategies can be compared effectively, and robust decision-making frameworks can be developed, thus enhancing building sustainability and advancing towards net-zero carbon objectives.

1 December 2025 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
NJNur Adibah Binti Jalaluddin
Nur Adibah Binti Jalaluddin
TWThong Jia Wen
Thong Jia Wen
NTNg Chiew Teng
Ng Chiew Teng
NSNoor Nabilah Binti Sarbini
Noor Nabilah Binti Sarbini
MKMariyana Aida Binti Ab. Kadir
Mariyana Aida Binti Ab. Kadir
The conservation of historical buildings in Malaysia is increasingly hindered by aging infrastructure, incomplete documentation, and the absence of coordinated maintenance strategies. This study presents a semantically enriched Building Information Modelling (BIM) framework for three-dimensional (3D) reconstruction and condition assessment, using a heritage building in Johor Bahru as a case study. Instead of conventional point cloud scanning, the method combines 360-degree panoramic images from Metareal with two-dimensional (2D) floor plans to manually develop a detailed BIM model in Autodesk Revit. This image-based approach helps overcome common limitations in heritage projects, such as high costs, restricted access, and the technical complexity of laser scanning. Semantic data such as defect type, severity, urgency, and previous interventions were integrated into the BIM model using custom parameters and visual filters. The condition assessment concentrated on architectural and cultural components such as decorative ceilings, masonry walls, timber windows, and tiled floors, which are vulnerable to deterioration in Malaysia’s tropical climate. Digital simulations were also used to test restoration options based on cost, durability, and historical authenticity, supporting more informed decision-making. Although the framework demonstrates strong potential for collaboration between conservation specialists and heritage stakeholders, this aspect remains a limitation of the present study, as validation was performed only through simulation. Overall, the findings confirm the feasibility of a semantically enriched BIM as a non-invasive, replicable tool for digital historical documentation and sustainable conservation planning in Malaysia. Future research may integrate photogrammetry to enhance geometric accuracy and actively involve stakeholders to reinforce collaborative validation. this text with the article Replace this text with the article