Xianghong Ding

Dr. Xianghong Ding


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 October 2025 in Journal of Hazardous Materials
Verified
Journal Article
Closed access
XDXianghong Ding
Xianghong Ding
SFShi-Jin Feng
Shi-Jin Feng
SZSheng Zhang
Sheng Zhang
YHYong He
Yong He

11 June 2026 in Journal of Hazardous Materials
Verified
Journal Article
Closed access
LZLian-Heng Zhao
Lian-Heng Zhao
QZQiao-Ling Zhang
Qiao-Ling Zhang
XDXianghong Ding
Xianghong Ding
PDPeng-Gen Dai
Peng-Gen Dai
QMQing-Yin Meng
Qing-Yin Meng

22 April 2026 in Buildings
Verified
Journal Article
Open access
PDF file
YXYifan Xu
Yifan Xu
WLWensheng Liang
Wensheng Liang
XDXianghong Ding
Xianghong Ding
YWYanjie Wang
Yanjie Wang
The long-term durability of adhesive anchors in aggressive environments is a critical concern for infrastructure safety, with steel corrosion being one of the most detrimental phenomena. While glass fiber-reinforced polymer (GFRP) anchors offer corrosion-resistant alternatives to steel anchors in harsh marine environments, the bond performance at the anchorage interface progressively deteriorates under wetting–drying (WD) cycles, which may compromise long-term anchorage integrity. However, the bond characteristics of GFRP anchors under WD exposure, particularly the development of predictive models, remain insufficiently understood. This paper presents an experimental investigation into the impact of WD cycles on the bond of GFRP adhesive anchors in concrete. Twenty-four specimens were tested under pull-out loads, considering two key variables: bonded length (40 mm and 80 mm, corresponding to 5 and 10 times the bar diameter) and number of WD cycles (0, 30, 60, and 90). Artificial seawater was prepared via ASTM D1141-98 to simulate marine exposure conditions. The results revealed that both bond strength and bond stiffness decreased significantly with increasing WD cycles, while the failure mode progressively shifted from the bar–adhesive interface to the adhesive–concrete interface. Based on the experimental data, a cycle-dependent bond strength model was developed to predict the bond degradation of the anchor–concrete interface after WD exposure. Requiring only the undegraded concrete strength, the proposed model effectively captures the coupled effects of WD cycles and bonded length on bond strength degradation, presenting a practical tool for the durability design and service life evaluation of GFRP anchorage systems in coastal and marine environments.

25 February 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JTJiahui Tang
Jiahui Tang
ZRZhiwen Ran
Zhiwen Ran
XDXianghong Ding
Xianghong Ding
Twin shield tunneling in river-crossing soft soils faces increased risks like face instability, largely due to unclear mechanisms linking water level fluctuations to ground settlement. To address this issue, a 3D fluid–solid-coupled FLAC3D model is developed based on the Zhanqiaogang section of Hangzhou Metro Line 15. Specifically, the model simulates four hydrological conditions: low water, normal water level, high water level, and flood level. It examines their effects on ground settlement, stress distribution, and pore water pressure during twin-tunnel excavation. The results indicate that the maximum ground surface settlement on the left alignment under flood-level conditions increased by 41.58% compared with that under normal water levels. On the right alignment, surface settlement increased from 6.54 mm under normal water levels to 8.54 mm under flood conditions, representing a 30.6% increase. A sensitivity analysis is also conducted on pore water pressure, soil internal friction angle, and support stiffness. Results show that ground settlement increases with rising river levels, mainly due to elevated pore pressure reducing soil strength. Sensitivity analysis confirms pore pressure as the key factor influencing deformation. Numerical results align well with field data, highlighting the critical role of hydraulic boundaries. Based on these results, control measures are proposed to provide practical guidance for mitigating settlement in similar river-crossing tunnel projects.

19 July 2026 in Buildings
Verified
Journal Article
Open access
PDF file
JWJiarui Wang
Jiarui Wang
LZLiya Zhang
Liya Zhang
J王Jiarui 王
Jiarui 王
XDXianghong Ding
Xianghong Ding
Biao LuoBiao Luo
Biao Luo
The construction of deep foundation pits for urban metro systems, particularly when in close proximity to existing sensitive structures, can easily induce unacceptable settlement and deformation. When shield tunneling and the top-down method are superimposed in both space and time, the resulting disturbance to the surrounding environment is more complex. A metro station project in Shenzhen was selected as the case study. Field monitoring and numerical simulation were combined to analyze the deformation of nearby bridge piers during different construction stages. The settlement-control effects of different reinforcement measures were also compared. The results indicate that the maximum settlement of the bridge piers throughout the monitored construction period reaches 31.81 mm. In the third stage, the cumulative settlement exceeded 10 mm. After the left-line shield passed through the station, the differential settlement between adjacent piers exceeded 5 mm. In the fourth stage, upon completion of the south section of the negative third floor, the differential settlement within the same pair of piers exceeded 4 mm. The maximum differential settlement between adjacent piers on the side closer to the foundation pit is 8.92 mm, whereas that on the side farther from the pit is 12.53 mm. The maximum values of both the differential settlement between adjacent piers and that within the same pair of piers occur during stages where multiple construction processes overlap. The connections between successive construction procedures are thus identified as weak links in deformation control. The discrepancy in cumulative settlement between symmetrically located piers arises primarily from the different reinforcement methods adopted. Supplementary pile reinforcement provides better performance than sleeve-valve-pipe grouting reinforcement. Because its reinforcement depth is insufficient to extend below the foundation pit excavation surface, the latter method fails to effectively restrain deformation in deep soils. The results describe the spatio-temporal development of pier deformation under combined construction disturbances. They also help identify critical construction stages and compare the settlement-control effects of different reinforcement measures. In addition, the numerical results provide a possible interpretation of pile load-transfer behavior under the combined effects of shield tunneling and top-down excavation. These findings serve as a practical reference for the design, construction sequencing, and risk management of similar metro station projects adjacent to bridges.