29 December 2025 in Buildings
Verified
Journal Article
Open access
PDF file
WLWensheng Liang
Wensheng Liang
JLJiang Lu
Jiang Lu
JFJinping Fu
Jinping Fu
BZBi Zhang
Bi Zhang
BZBaowen Zhang
Baowen Zhang
YWYanjie Wang
Yanjie Wang
The embedded through-section (ETS) technique is a promising method for fiber-reinforced polymer (FRP)-strengthening reinforced concrete (RC) structures, offering higher bond resistance and reduced surface preparation compared to externally bonded or near-surface mounted FRP systems. A common failure in ETS applications is debonding at the FRP bar-to-concrete interface. However, current design standards often assume uniform bond stress and lack predictive models that account for debonding propagation and its effect on load capacity. Furthermore, a detailed analysis of interfacial stress development, including debonding initiation and progression along varying bond lengths, remains limited. To address these gaps, this study introduces an analytical model that describes the complete debonding process in ETS FRP bar-to-concrete joints, incorporating both long and short bond lengths and frictional effects. Based on a trilinear cohesive material law (CML), closed-form expressions are deduced for the load–slip response, maximum load, interfacial shear stress and strain distribution along the FRP bar. The proposed model is validated experimentally through pull-out tests on glass FRP (GFRP) bars adhesively bonded to concrete with different strength grades. The results show that the analytical predictions agree well with both the self-conducted experimental data for short joints and existing test results for long joints given in the literature. Therefore, the developed design-oriented solution enables accurate evaluation of the actual contribution of ETS FRP reinforcement to RC members by explicitly modeling debonding behavior. This provides a rigorous and mechanics-based tool for performance-based design of ETS FRP-to-concrete joints, addressing a critical gap in the future refinement of current design standards.

22 April 2026 in Buildings
Verified
Journal Article
Open access
PDF file
YXYifan Xu
Yifan Xu
WLWensheng Liang
Wensheng Liang
XDXianghong Ding
Xianghong Ding
YWYanjie Wang
Yanjie Wang
The long-term durability of adhesive anchors in aggressive environments is a critical concern for infrastructure safety, with steel corrosion being one of the most detrimental phenomena. While glass fiber-reinforced polymer (GFRP) anchors offer corrosion-resistant alternatives to steel anchors in harsh marine environments, the bond performance at the anchorage interface progressively deteriorates under wetting–drying (WD) cycles, which may compromise long-term anchorage integrity. However, the bond characteristics of GFRP anchors under WD exposure, particularly the development of predictive models, remain insufficiently understood. This paper presents an experimental investigation into the impact of WD cycles on the bond of GFRP adhesive anchors in concrete. Twenty-four specimens were tested under pull-out loads, considering two key variables: bonded length (40 mm and 80 mm, corresponding to 5 and 10 times the bar diameter) and number of WD cycles (0, 30, 60, and 90). Artificial seawater was prepared via ASTM D1141-98 to simulate marine exposure conditions. The results revealed that both bond strength and bond stiffness decreased significantly with increasing WD cycles, while the failure mode progressively shifted from the bar–adhesive interface to the adhesive–concrete interface. Based on the experimental data, a cycle-dependent bond strength model was developed to predict the bond degradation of the anchor–concrete interface after WD exposure. Requiring only the undegraded concrete strength, the proposed model effectively captures the coupled effects of WD cycles and bonded length on bond strength degradation, presenting a practical tool for the durability design and service life evaluation of GFRP anchorage systems in coastal and marine environments.

17 August 2026 in Buildings
Verified
Journal Article
Open access
PDF file
JTJinghua Tang
Jinghua Tang
WLWensheng Liang
Wensheng Liang
CAChinara Adamkulova
Chinara Adamkulova
XCXindong Chang
Xindong Chang
Hanwen CuiHanwen Cui
Hanwen Cui
Hao FuHao Fu
Hao Fu
Prefabricated construction couples factory production, buffer storage, transportation, on-site installation, and workforce resources. Desynchronization across these stages creates waiting, idle labor, standby, and buffer pressure—non-value-adding losses that local schedule and cost controls leave hidden. This study takes a project-control view of multi-stage prefabricated delivery and develops a full multi-stage synchronization model that makes these losses explicit and controllable during schedule evaluation. From a sustainable-construction perspective, the framework targets operational resource efficiency by reducing non-value-adding waiting, idle labor, buffer burden, and standby, rather than claiming direct carbon or life-cycle effects. The model optimizes three objectives: makespan, total cost, and a resource-efficiency synchronization loss (RESL) that aggregates waiting, crew-idle, buffer, and standby losses; RESL is a schedule-based resource-efficiency proxy, not a carbon or life-cycle measure. A SPEA2-based solver, SI-SAR-SPEA2, adds structured initialization and synchronization-aware light repair. Using project-inspired semi-realistic prefabricated building-delivery instances, the evaluation compares alternative model scopes, algorithm baselines, a pre-fixed fresh-seed extension, ablation variants, and sensitivity settings. The full model exposes cross-stage synchronization losses and substantially reduces RESL relative to a production–transport model, whereas its relative performance against a production–transport–installation model remains marginal, instance-dependent, and weight-dependent. Under the formal benchmark protocol, SI-SAR-SPEA2 improves hypervolume, average rank, and RESL compared with the SPEA2 backbone, but this quality gain requires additional runtime. The results position RESL as an integrated project-control indicator for comparing schedule alternatives in terms of delivery timing, cost exposure, workforce utilization, and synchronization risk.