Filippo Maria Ottaviani

Prof. Filippo Maria Ottaviani

Management and Production Engineering, Politecnico di Torino, Turin, Piedmont, Italy
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 February 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
Alberto De MarcoAlberto De Marco
Alberto De Marco
TNTimur Narbaev
Timur Narbaev
Massimo RebuglioMassimo Rebuglio
Massimo Rebuglio
From a managerial perspective, project success hinges on estimates at completion as they allow tailoring response actions to cost and schedule overruns. While the literature is moving towards sophisticated approaches, standard methodologies, such as Earned-Value Management (EVM) and Earned Schedule (ES), are barely implemented in certain contexts. Therefore, it is necessary to improve performance forecasting without increasing its difficulty. The objective of this study was twofold. First, to guide modeling and implementing project progress within cost and to schedule Performance Factors (PFs). Second, to test several PFs utilized within EVM and ES formulae to forecast project cost and duration at completion. Progress indicators dynamically adjust the evaluation approach, shifting from neutral to conservative as the project progresses, either physically or temporally. This study compared the performance of the progress-based PFs against EVM and ES standard, combined, and average-based PFs on a dataset of 65 real construction projects, in both cost and duration forecasting. The results show that progress-based PFs provide more accurate, precise, and timely forecasts than other PFs. This study allows practitioners to select one or more of the proposed PFs, or even to develop one, following the guidelines provided, to reflect best their assumptions about the future course of project performance.

13 March 2024 in Systems
Verified
Journal Article
Open access
PDF file
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
Alberto De MarcoAlberto De Marco
Alberto De Marco
CRCarlo Rafele
Carlo Rafele
GCGABRIEL CASTELBLANCO
GABRIEL CASTELBLANCO
Project risk management (PRM) involves identifying risks, assessing their impact, and developing a contingency plan. A structured contingency management (CM) approach prevents subjective biases in analyzing risks and developing responses. Previous studies have either focused on improving the accuracy of risk estimates or analyzed, from a qualitative perspective, the relationships between perceived risk and project performance. This study aimed to improve PRM by providing a risk-perception-based contingency management framework (CMF). The CMF guides contingency depletion based on two short- and long-term cost overrun indicators and their respective thresholds. Thresholds and the initial contingency reserve amount are determined by applying the Monte Carlo method to a stochastic, discrete-event, finite-horizon, dynamic project simulation model. The study developed the CMF through a structured approach, validating the simulation model on eight specific project configurations. The results prove that the framework can be applied to any project, shaping the risk response strategy. This study contributes to PRM by explaining the relationships between risk perception and risk responses and providing a prescriptive CM tool.

30 July 2025 in Automation in Construction
Verified
Journal Article
Open access
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
PBPablo Ballesteros-Perez
Pablo Ballesteros-Perez
TNTimur Narbaev
Timur Narbaev

4 August 2023 in International Journal of Construction Management
Verified
Journal Article
Closed access
Alberto De MarcoAlberto De Marco
Alberto De Marco
TNTimur Narbaev
Timur Narbaev
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
MVMario Vanhoucke
Mario Vanhoucke

1 July 2020
Verified
Conference Paper
Closed access
IMIonut Alexandru Mitrea
Ionut Alexandru Mitrea
GZGiovanni Zenezini
Giovanni Zenezini
Alberto De MarcoAlberto De Marco
Alberto De Marco
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
TDTiziana Delmastro
Tiziana Delmastro
CBCristiana Botta
Cristiana Botta
The widespread diffusion of the online channel in the retail marketplace is impacting modern society considerably in recent years. Given the growing demand, Business to Consumer (B2C) e-commerce entails a much higher complexity of the delivery process due to significant fragmentation of parcel shipments in the last mile, especially in urban areas, where traffic and congestion problems are arising together with environmental issues. All these aspects rise interest not only from companies – which strive to maintain a high target service level for their customers - but also for public administrations, that aim to foresee the implications of this phenomenon. In this context, the purpose of the study is to investigate the potential of an alternative solution to the traditional home delivery, namely the self-collection delivery service through automated parcel lockers. The research study is based on data gathered from an online survey submitted to a sample of residents living in the metropolitan city of Turin, Italy. The potential of parcel lockers to capture the actual demand will be assessed to determine the feasibility of the delivery solution under consideration.

26 July 2024 in Procedia Computer Science
Verified
Journal Article
Open access
Alberto De MarcoAlberto De Marco
Alberto De Marco
Filippo Maria OttavianiFilippo Maria Ottaviani
Filippo Maria Ottaviani
FBFabio Bolognesi
Fabio Bolognesi