Federico Trigos

Prof. Federico Trigos

EGADE Business School, Tecnológico de Monterrey, Monterrey, Nuevo León, Mexico

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2022 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Open access
SGSusan Gourvenec
Susan Gourvenec
FSFraser Sturt
Fraser Sturt
EREmily Reid
Emily Reid
Federico TrigosFederico Trigos
Federico Trigos

1 September 2014 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
JRJenny Díaz Ramírez
Jenny Díaz Ramírez
Jose Ignacio HuertasJose Ignacio Huertas
Jose Ignacio Huertas
Federico TrigosFederico Trigos
Federico Trigos

29 May 2007 in Facilities
Verified
Journal Article
Closed access
PDF file
Jose Ignacio HuertasJose Ignacio Huertas
Jose Ignacio Huertas
JRJenny Díaz Ramírez
Jenny Díaz Ramírez
Federico TrigosFederico Trigos
Federico Trigos
Purpose – The purpose of this article is to present a model to estimate and evaluate the operational costs of alternative layouts for large capacity warehouses or distribution centers with a large variety of goods. Design/methodology/approach – The proposed model is based on time and resources studies per each of the basic activities on a warehouse operation. For validation purposes, the proposed model was applied on a perishable goods warehouse in Mexico. The output data was compared to actual data. Performance measures were operational costs and average picking time. Findings – It was found that the proposed model is robust, flexible, simple and easy to be implemented. The model was used to evaluate two new alternatives of layout and operations of the same warehouse. It was found that the option with the layout with docks on long opposite sides of the warehouse and the operation without a separate picking zone minimizes operational costs. Research limitations/implications – The richness of the model is strongly supported by the information the warehouse has about its operation. With knowledge of the process, it is required to distinguish deterministic from stochastic basic activities and develop distance computations that depend on the layout being studied. Practical implications – The approach used to model warehouse operations was to estimate the movements and resource consumption per commodity. This allows the model to be used in every operational context when the complexity of the system is strongly dependent on and proportional to the volume of operations. In addition, it is particularly adequate as a tool to compare average performance measures of different scenarios for the same system. Originality/value – The model proposed here provides a simple way to estimate particularly operational resource consumptions and picking times as proxy measures for efficiency and efficacy of a warehouse. It uses distance computations, time information and unit occurrence frequencies of basic activities over a single commodity in the system.

19 March 2018 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
GGGilberto E. García
Gilberto E. García
Federico TrigosFederico Trigos
Federico Trigos
DMDemófilo Maldonado-Cortés
Demófilo Maldonado-Cortés
LPLaura Peña-Parás
Laura Peña-Parás

5 May 2016 in International Journal of Production Research
Verified
Journal Article
Closed access
Federico TrigosFederico Trigos
Federico Trigos
ELEduardo Manuel López
Eduardo Manuel López
A specialised case of the classical one-dimensional cutting stock problem (1D-CSP) with six main additional features is adapted in this paper to model and solve planning unit operations with limited resources in the make-to-order industrial environment, generating a new decision-making problem. The objective is to satisfy demand using the minimum number of manufacturing cycles. Although there is a large number of applications, this paper proposes a decision model directed at the vulcanising operation during the manufacturing of rubber curved hoses in the automotive industry. Because each vulcanising cycle (VC) uses a considerable amount of resources, the need to minimise the total number of VCs is of importance due to its direct relationship with lead time and productivity. An integer-programming model based on a network optimisation formulation is proposed to solve the problem to optimality and allows for construction of the mathematical model. In addition, due to the limited capacity of computers to solve large instances, a heuristic is developed to obtain near-optimal solutions. Scheduling issues are found in the optimal solution of the integer-programming model, but the heuristic overcomes such obstacles. Numerical experiments demonstrate the efficiency of the heuristic.

1 May 2019 in International Journal of Production Economics
Verified
Journal Article
Closed access
Federico TrigosFederico Trigos
Federico Trigos
AVAlan R. Vazquez
Alan R. Vazquez
LCLeopoldo Eduardo Cárdenas-Barrón
Leopoldo Eduardo Cárdenas-Barrón