Microgrids technologies are seen as a cost effective and reliable solution to handle numerous challenges, mainly related to climate change and power demand increase. This is mainly due to their potential for integrating available on-site renewable energy sources and their flexibility and scalability. The particularity of microgrids is related to their capacity to operate in synchronization with the main grid or in islanded mode to secure the power supply of nearby end-users after a grid failure thanks to storage solutions and an intelligent control system. The most critical operating case occurs when a sudden transition from grid-connected (GC) to stand-alone operation (SA) happens. During the transition, the system experiences abrupt changes that can result in a malfunction of the control system and a possible failure of the power system. The transition issue attracted considerable attention from researchers. Indeed, many research works are proposed to address this issue by proposing detection and transition techniques that ensure a smooth transition at the islanding time. Although there are several approaches to dealing with this issue, a categorization of the proposed methods in the literature and their differences is useful to assist engineers and researchers working on this topic. Thus, this study proposes a comprehensive review to summarize these approaches and point out their advantages and limitations.
This paper presents a study analysis of a wind energy conversion system (WECS) based on a doubly fed induction generator (DFIG) connected to the electric power grid. The aim of the work is to apply and compare the dynamic performances of two types of controllers (namely, classical PI and Fuzzy-PI) for the WECS in terms of tracking and robustness with respect to the wind fluctuation as well as the impact on the quality of the energy produced. A vector control with stator flux orientation of the DFIG is also presented to control the active and reactive powers between the stator and the grid, and further to achieve maximum wind energy capturing. To show the effectiveness of the control method performances analysis of the system are analyzed and compared by simulation in terms of the performances ofthe machine
This paper introduces a novel energy management strategy incorporating stochastic elements designed for off-grid photovoltaic (PV) systems supplying multiple loads in environments marked by unpredictable power usage. In these PV microgrid applications, unpredictable power consumption can lead to discrepancies between energy supply and demand, compromising system reliability and efficiency. This issue is especially pertinent in providing reliable electricity to remote or rural areas where conventional grid infrastructure is not available or reliable. To overcome this challenge, this paper addresses the random variability in load consumption by modeling it as a Markov decision process (MDP). The MDP framework facilitates the development of an effective decision-making process, accounting for the probabilistic nature of energy consumption patterns. Furthermore, by integrating MDP-based load consumption prediction into the energy management system, real-time optimization of both PV power and battery charging and discharging within the microgrid is achieved. This integration balances energy production and consumption, enhancing overall system efficiency. Three scenarios were examined to evaluate the effectiveness of the suggested strategy in enhancing the real-time operation of off-grid PV systems: standard test conditions, time-varying climatic profiles, and real-time weather situations. The findings indicate that the proposed strategy can adapt to dynamic load profiles, ensuring efficient energy utilization while maintaining microgrid stability.
This paper focuses on the modeling, analysis, and design of grid-forming (GFM) inverter-based microgrids (MGs). It starts with the development of a mathematical model for three-phase voltage source inverters (VSI). The voltage and current controllers consist of two feedback loops: an outer feedback loop of the capacitance-voltage and an inner feedback loop of the output inductance current. The outer voltage loop is employed to enhance the controller’s response time. The inner current loop is used to provide active damping for the resonance created by the LCL filter. A two-layer control scheme is adopted for the GFM inverter control. The primary decentralized control uses droop control and virtual impedance loops to share active and reactive power. Simultaneously, the centralized secondary control addresses frequency and amplitude deviations induced by the droop control. Additionally, a synchronization loop is proposed for seamless reconnection of GFM inverters to the MG and to connect the GFM-controlled MG to the main grid. It has the advantage that the inverter operates in GFM mode even after the synchronization has occurred. The simulation results have shown that the voltage controller ensures a 0.005 s settling time and maintains the steady-state error at its minimum value of 0.1 V. Similarly, the current controller ensures a 0.006 s settling time with a 10−5 steady-state error. The system with the designed controller has a low total harmonic distortion (THD) of 1.46% and improved power quality of the output voltage. Furthermore, a quick restoration time is observed during load steps and tripping events, with a restoration time of 1 s with 10−10 steady-state error. Synchronization is achieved within 0.8 s for the incoming inverters and requires 3 s to synchronize the MG with the main grid, maintaining a steady-state error of 10−9.