Teaching production systems and Lean tools is a challenge for educators in the construction area, which is highlighted by the difficulty of emulating in the classroom the scenarios that industry professionals will face. Hence, implementing pedagogical games has a high potential to improve construction education processes. However, gaps are observed in the proposal of pedagogical games applicable to teaching construction systems based on Lean tools. Considering this gap, this paper proposes a game of paper planes to support the teaching of production systems in construction based on the Lean tools Continuous Improvement Cells and 5S. The research method consisted of applying the Design Science Research (DSR) method to develop, evaluate, and improve the game proposal. Thus, the game was assumed as an artifact subject to a development and improvement process to solve an identified problem. The proposed game consists of three main rounds: (1) production system design, (2) Continuous Improvement Cells implementation, and (3) 5S implementation. The main theoretical and practical contribution is the proposal of a pedagogical game to support the teaching of construction production systems based on Lean tools, evaluating students’ knowledge by applying surveys before and after the game and assessing performance indicators. The application of the game to a group of undergraduate and graduate students showed a broad positive impact on the assimilation of the principles of construction production systems based on Lean tools.
1 December 2018 in Revista ingeniería de construcción
Resumen: En el contexto de hacer caminos más sostenibles, este estudio compara dos mezclas de asfalto: una convencional, y otra con neumáticos fuera de uso (NFU), utilizando un método de toma de decisiones multicriterio enfocado en las ventajas entre las diferentes alternativas llamado “selección por ventajas” (Choosing by Advantages, CBA). El objetivo es responder si es conveniente utilizar NFU en mezclas asfálticas en los países en desarrollo, y qué impactos ambientales genera su uso en la construcción de carreteras. Esta investigación se basa en un estudio de caso de un proyecto de construcción de carretera en Chile. Los principales resultados son los siguientes: 1) el uso del betún caucho (BC) es más ventajoso que el uso de betún convencional, y 2) el costo requerido para la fabricación y ejecución del BC es de 1.4 veces mezcla más alto que el costo de la convencional; sin embargo, el costo de mantenimiento del BC es menor. Por último, la investigación muestra que es conveniente utilizar NFU en las mezclas del asfalto, ya que genera mejoras sociales y ambientales, tales como la reducción de variabilidad IRI en el tiempo, minimización del ruido y disminución de emisiones de gases de efecto invernadero (GEI).
1 December 2022 in Journal of Construction Engineering and Management
A relevant problem in the construction sector is low productivity due to the high variability and uncertainty of projects, which makes it necessary to increase efficiency through better project planning and control. The last planner system (LPS) has proven to increase planning reliability; however, improving the management of commitments in weekly planning meetings is necessary. Therefore, the objective of this research is to develop a commitment management system (CMS) using the fundamental elements of the linguistic action perspective (LAP) in synergy with the LPS. Design science research (DSR) was used to develop the CMS through three iterations (artifacts) that were applied in construction projects in Chile and Colombia. To evaluate and validate the artifact, the following two approaches were used: (1) internal, conducted by the research team through reflections on each artifact and its consequences, and (2) external, through quantitative and qualitative results. The main results led to the development of a pioneering system of commitment management in construction projects, which proved to be a practical contribution when implemented, showing positive results in participants’ statements, CMS indicators, LPS indicators, and performance (time deviation). Additionally, in terms of theoretical contributions, the CMS allows reinforcing the LPS with the incorporation of specific LAP fundamentals in construction projects through a (1) system containing indicators to measure and control the management of commitments, (2) flowchart of specific commitments for construction projects, and (3) six-phase implementation plan to be replicated. The main conclusions regarding the CMS are that it allows to: (1) manage commitments by focusing on the foreman (or supervisor), (2) implement a plan that allows replication of this system, (3) improve trust and teamwork based on participants’ statements, and (4) improve performance in time deviation of construction projects.
The COVID-19 pandemic was a significant disruption to the construction industry around the globe with multiple impacts, such as workforce limitations and contractual conflicts. Multiple studies have explored the impacts of the pandemic in the construction sector so far. However, little is known about how construction companies responded to the pandemic and what companies’ characteristics may have influenced their responses. The objective of this study is to explore the impacts of COVID-19 and how construction companies responded to the pandemic. To do so, semi-structured interviews with experienced professional working in Chile are qualitatively analyzed to leverage their experience. Furthermore, characteristics of construction companies that influenced how companies responded to the pandemic, namely, size, experience, and financial standing, are explored. The results obtained suggest that the focus in responding to the pandemic was taking care of workers’ safety, improving the planning of projects under highly uncertain conditions, and dealing with the financial stress of developing construction projects. When looking at the influence of companies’ experience, size, and economic capacity, experienced and large companies’ responses were related to implementing teleworking and dealing with a limited workforce. Regarding the economic capacity of construction companies, the focus was placed on responding to the pandemic using multiple sources of financing. Differences identified in how construction companies responded to the pandemic emphasizes the importance of understanding attributes that led companies to having better responses to the pandemic and being prepared for the post-pandemic context.