Ludwig Rivera

Mr. Ludwig Rivera

University of Seoul
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 October 2020 in Infrastructures
Verified
Journal Article
Open access
PDF file
Ludwig RiveraLudwig Rivera
Ludwig Rivera
HILARIO, JR. BAGUECHILARIO, JR. BAGUEC
HILARIO, JR. BAGUEC
Chunho YeomChunho Yeom
Chunho Yeom
Delays in road construction projects due to various reasons are a major problem facing construction professionals. The incapability of finishing projects punctually and within a given budget is a persistent issue worldwide. This study aims to determine the ten principal causes of delay in road construction projects in 25 developing countries across the globe. The study involves two steps. First, the authors compiled information regarding the most frequent delays in a road construction project. Second, they analyzed the intensity of each cause of delay in these projects. Being more accurate in the methodology, given the nature of the information, the researchers used a quasi-meta-analysis for processing the data. Half (50%) of the countries have similar causes of delay, and likewise, 50% of the countries identified the top ten primary causes of delay in road construction projects based on the intensity results. This study uses the results of the intensity. According to the results of the homologation, the lack of experience of the construction manager, inadequate planning/scheduling, and influence on people’s land alongside the road construction project (expropriation for the construction of the project) have more significant impacts than frequent changes in the design (which was listed as the most frequent cause of delay).