Improving energy efficiency is the most important goal for buildings today. One of the ways to increase energy efficiency is to use the regenerative potential of elevators. Due to the special requirements of elevator drives, energy storage systems based on supercapacitors are the most suitable for storing regenerative energy. This paper proposes an energy storage system consisting of a supercapacitor bank and a bidirectional six-phase interleaved DC/DC converter. The energy savings achieved by the proposed system were investigated through simulation tests. The proposed system was modeled considering all physical constraints. A simulation model of the existing faculty elevator system was created in PLECS and verified with field measurements. Reliable results were ensured by using the verified simulation model and considering all physical constraints. The operation of the proposed energy storage system was tested under various conditions. In addition, the simulation model of the elevator system with the proposed energy storage system was tested using the elevator traffic data obtained from the measurements. The simulation results show the effectiveness of the proposed energy storage system and that significant energy savings can be achieved.
1 November 2017 in Electric Power Systems Research
This paper presents a case study of three-phase ferroresonance in a low-voltage power factor correction system and investigates the influence of harmonic distortion on the occurrence of ferroresonance. Ferroresonance is an extremely dangerous and rare phenomenon that causes overvoltages and overcurrents in the system and degrades the power quality. The study is carried out on real field measurements in an industrial plant where ferroresonance occurs in the power factor correction (PFC) system at the detuned reactor. The three-phase ferroresonance analysed in this paper is an extremely rare phenomenon that has never been reported in this type of configuration. The measurement results have shown that in this type of configuration the high harmonic distortion is a necessary condition for ferroresonance to occur. In such conditions, switching on the capacitor stage triggers the ferroresonance with quasi-periodic oscillations supported by the medium voltage grid. The main contribution is the analysis of the three-phase ferroresonance in the detuned PFC system and the influence of the harmonics on the occurrence of the ferroresonance in such a case. The possible solutions to this problem and recommendations to avoid this phenomenon are discussed.
19 December 2019 in IET Renewable Power Generation
In wind energy conversion systems of type 4, the critical operating point in permanent‐magnet generators (PMGs) is the moment of switching on the generator‐side converter (GSC). The induced back‐electromotive force (EMF) acting on PMG terminals can cause inrush currents if the synchronisation between PMG and GSC is not done well. The main condition for achieving a satisfying synchronisation is to know the rotor angle, rotating speed and induced back EMF before the GSC is switched on. This synchronisation together with the switching on of the GSC is called the flying start of a PMG. In this study, a novel sensorless PMG flying‐start method is proposed to ensure good synchronisation. The flying‐start method is based on an extended flux PMG model in a rotating reference frame with a discrete second‐order sliding‐mode observer and a phase‐locked loop controller during the discontinuous operating mode. This is based on discontinuous currents, which are induced because of the PMG rotation caused by wind energy. The proposed method ensures the operation of PMGs in the continuous operating mode as well. The effectiveness of the proposed method is verified on saturable models of low‐ and high‐power surface and interior PMGs through simulations in Simulink and Piecewise Linear Electrical Circuit Simulation (PLECS).
22 February 2023 in IEEE Transactions on Industrial Electronics
This article deals with a sensorless control of permanent magnet generators (PMGs) including a method of flying start. Flying start involves synchronization between the voltages of the generator-side converter (GSC) and the PMG, as well as switching on the GSC. Without a proper flying start, inrush current and impact torque can cause undesirable side effects. In this article, a framework for the sensorless control of the PMG based on a sliding mode observer (SMO) is proposed, which includes the flying start method. The flying start is performed during a discontinuous operation of the GSC. This method ensures the flying start and continuous operation of the PMG, with few adjustments required between the two modes. In addition, the self-commissioning method is used to determine the PMG parameters required to tune the SMO and current controllers, and to reduce the SMO estimation error. The new method is verified experimentally on a 5.5-kW PMG.
21 March 2024 in IEEE Transactions on Industry Applications
Recent advances in the control of grid-side converters (GSCs) aim to improve system reliability by eliminating the need for voltage sensors. Effective control without voltage sensors requires both synchronization before the GSC is connected to the grid and continuous operation afterwards. To meet these two requirements, a novel voltage sensorless control method is proposed using a robust and reliable estimation structure with a sliding-mode observer (SMO) and a double generalized second-order integrator with frequency-locked loop (DSOGI-FLL). The main objective of sensorless start-up of GSC is to suppress the inrush current that occurs when the grid and GSC voltages are not well synchronized. To achieve this, the discontinuous operation of the GSC is exploited by forcing controlled short circuits at the GSC terminals, resulting in a discontinuous current between the grid and the GSC. Therefore, the proposed estimation structure is analyzed and adapted to operate properly in discontinuous operation. Thus, a successful synchronization, i.e. an estimation of the grid angle and amplitude, is ensured based on the sampled counterpart of the discontinuous current. After synchronization and with only minor modifications to the estimation structure, the proposed method also enables stable operation in continuous mode, which implies standard voltage-oriented control (VOC) with pulse-width modulation (PWM). Consequently, the whole process of voltage sensorless control of the GSC is performed using a single estimation structure, which is inherently robust to disturbances such as voltage distortion due to the specific characteristics of SMO and DSOGI-FLL. The proposed method is validated by simulations and experimental tests.