Mahmoud Karaz

Mr. Mahmoud Karaz

Department of Civil Engineering (DEC), University of Minho, Guimarães, Braga, Portugal
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MKMahmoud Karaz
Mahmoud Karaz
JTJosé Manuel Cardoso Teixeira
José Manuel Cardoso Teixeira
TATatiana Gondim do Amaral
Tatiana Gondim do Amaral
Effective waste elimination is critical for the success of construction projects. Although several studies have focused on various aspects of construction waste, limited efforts have yet to investigate the dynamic effect of Making-Do (MD) practices on productivity, rework, defects, and material waste. From a lean construction perspective, this study aims to address MD waste using the Last Planner System (LPS) and BIM. First, the causal structure that can cause MD in construction projects was expressed in a causal loop diagram (CLD), and thematic analysis uncovered the strategies of LPS-BIM to eliminate MD identified by reviewing the literature. Secondly, twenty-five strategies from the LPS and BIM strategies to address MD using structural equation modeling (SEM) were assessed. Subsequently, a system dynamics model (SDM) for investigating LPS-BIM strategies on MD decisions in a construction project was formulated based on the underlying causal loop diagrams and the mathematical relations among the variables. Finally, the model was applied to three projects, and simulations for four LPS-BIM scenarios were carried out. The findings show that dynamic interactions among diverse production planning and control factors are critical in evaluating MD impacts on a construction project. The results demonstrate that the LPS-BIM approach resulted in an average 43.8% reduction in the tasks performed with MD, 45.3% of constraints, 66.5% of construction waste, an increasing 13.7% completion rate, and a 29.3% cost reduction, demonstrating that LPS-BIM is a more efficient solution for MD mitigation and construction planning. This study aims to guide construction planners and policymakers to better manage their production constraints by eliminating negative MD practices from their plans.

28 April 2023 in U.Porto Journal of Engineering
Verified
Journal Article
Open access
PDF file
MKMahmoud Karaz
Mahmoud Karaz
JTJosé Cardoso Teixeira
José Cardoso Teixeira
Construction waste (CW) is an abstract, high-level concept and difficult to measure systematically. The conventional management methods have failed to translate the reality in the construction industry context. The integrated Lean Construction (LC) and Building Information Modelling (BIM) streamline several proactive and collaborative solutions to address CW at its source across the whole asset lifecycle. This paper adopts the systematic literature review method to (i) understand ‘waste’ and ‘waste elimination’ concepts through LC perspectives and (ii) to review factors of LC-BIM for waste elimination. Based on thematic analysis applied to 54 relevant documents in the Scopus and IGLC databases, some literature was approached. According to thematic analysis applied to the existing LC-BIM approaches, despite the potential of LC-BIM for CW elimination, the current literature lacks the concept of waste elimination in the number and content of publications. The paper highlights some generic recommendations for future theoretical and empirical developments.

21 May 2024 in Preprints.org
Verified
Preprint
Open access
PDF file
MKMahmoud Karaz
Mahmoud Karaz
JTJosé Manuel Cardoso Teixeira
José Manuel Cardoso Teixeira
TATatiana Gondim do Amaral
Tatiana Gondim do Amaral
Effective waste elimination is critical for the success of construction projects. Although several studies have focused on various aspects of construction waste, limited efforts have investigated the dynamic effect of Making-Do (MD) practices on productivity, rework, defects, and materials wastage. From a lean construction perspective, this study aims to address MD waste using the Last Planner System (LPS) and BIM. First, the casual structure that can cause MD in construction projects was expressed in a casual loop diagram (CLD), and thematic analysis uncovered the strategies of LPS-BIM to eliminate MD identified by reviewing the literature. Secondly, twenty-five strategies from the LPS and BIM strategies to address MD using Structural Equation Modeling (SEM) were assessed. Subsequently, a system dynamics model (SDM) for investigating LPS-BIM strategies on MD decisions in a construction project was formulated based on the underlying causal loop diagrams and the mathematical relations among the variables. Finally, the model was applied to three projects, and simulations for four LPS-BIM scenarios were carried out. The findings show that dynamic interactions among diverse production planning and control factors are critical in evaluating MD impacts on a construction project. The results demonstrate that the LPS-BIM approach resulted in an average 43.8% reduction in the tasks performed with MD, 45.3% of constraints, 66.5% of construction waste, increasing 13.7% completion rate, and 29.3% cost reduction, demonstrating that LPS-BIM as a more efficient solution for MD mitigation and construction planning.

15 September 2020
Verified
Book Chapter
Closed access
PDF file
MKMahmoud Karaz
Mahmoud Karaz
JTJosé Cardoso Teixeira
José Cardoso Teixeira
KRKamel Mohamed Rahla
Kamel Mohamed Rahla


31 December 2025 in Proceedings of Smart and Sustainable Built Environment Conference Series
Verified
Journal Article
Closed access
Moslem SheikhkhoshkarMoslem Sheikhkhoshkar
Moslem Sheikhkhoshkar
MKMahmoud Karaz
Mahmoud Karaz
Hind BRILHind BRIL
Hind BRIL
The increased use of modular construction focuses on streamlined rack systems, but the existing ad-hoc-based plans for stacking logistics require a methodical approach. This paper provides a comprehensive guideline on rack specification to support safe, efficient and cost-effective transportation of prefabricated façade panels during modular integrated construction (MiC) to address issues such as instability and damage in transit. A mixed methods design combines a five-step process, which involves literature review and existing standards (e.g. EN 12195; ISO 1496-1), 2-round Delphi questionnaire, 13 specialists, statistical analysis, and a validation rack design of industrial supplier against the developed specifications. The most significant results include seven drivers, such as Panel Characteristics, Handling/Loading-Unloading, Transportation Conditions, Cost and Budget, Safety and Stability, Modularity and Adaptability, and Space Efficiency, each with 25 factors, and safety and stability (e.g., vibration resistance, mean 4.538, SD 0.877) are the top drivers. The novel specification guide fills industrial design gaps, such as poor fastening mechanisms. These are small sample sizes and untested second-round data, implying that further validation should be done. In practice, the guide aids the architecture and construction logistics through the delivery of panels free of damage, and the partner's design demonstrates compliance regarding trailer compatibility. However, fasteners need to be improved to guarantee a higher level of safety. It also fosters sustainable urban development because of the reduction of costs and delays and the possible benefits to society, such as better living conditions due to efficient renovations.