Miguel Angelo de Carvalho Michalski

Prof. Dr. Miguel Angelo de Carvalho Michalski

Mechatronic Engineering and Mechanical Systems, Universidade de São Paulo, São Paulo, Brazil
orcid
Researcher | Professor | Data Scientist and Analyst | Reliab...

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
RSRenan Favarão da Silva
Renan Favarão da Silva
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza

5 July 2022 in Expert Systems with Applications
Verified
Journal Article
Closed access
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza

23 September 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RSRenan Favarão da Silva
Renan Favarão da Silva
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
Proper maintenance planning is critical for maintenance management to contribute to increasing availability, ensuring quality requirements, and controlling the safety and environmental risks associated with physical assets. As supporting tools for developing maintenance strategies, Reliability-Centered Maintenance (RCM) and Risk-Based Maintenance (RBM) methods are currently used in several organizations. Nevertheless, these strategies are often approached separately although they are complementary. In this context, this paper proposes a novel method that effectively integrates RCM and RBM by adapting the traditional RCM method to incorporate risk management into maintenance planning decision-making to support maintenance management. The proposed Reliability and Risk Centered Maintenance (RRCM) method allows organizations to determine maintenance plans that ensure the reliability of the physical assets while considering and prioritizing the risks associated with their potential functional failures. The proposed method was demonstrated through a case study considering the operational context of a hydroelectric power plant. The results show the ability of RRCM to assist in the development and implementation of maintenance plans oriented to reliability, risk, and cost.

6 November 2024 in Journal of Sound and Vibration
Verified
Journal Article
Closed access
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
IMItalo Skovroski de Melo
Italo Skovroski de Melo
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza

1 January 2020
Verified
Conference Paper
Closed access
RSRenan Favarão da Silva
Renan Favarão da Silva
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
SNSilvio Ikuyo Nabeta
Silvio Ikuyo Nabeta
FHFernando Hiroyuki Hamaji
Fernando Hiroyuki Hamaji

23 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
Arthur MelaniArthur Melani
Arthur Melani
RSRenan Favarão da Silva
Renan Favarão da Silva
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
FHFernando H. Hamaji
Fernando H. Hamaji
From the breakdown of the Kaplan rotor of a hydrogenerator unit and the monitored data collected during its operation before such a failure, this work presents a post-occurrence data analysis in which a previously developed hybrid method based on unsupervised machine learning techniques is applied to detect and diagnose failure before a unit shutdown. In addition to demonstrating the efficiency and capacity of the developed method in an application with real data, the conducted analysis seeks to shed light on the events that occurred at the considered hydroelectric power plant, helping to understand the failure mode evolution and outcome. The results of the fault detection and diagnosis process clearly demonstrated how the evolution of failure modes took place in the analyzed equipment. The detection of potential failures far in advance would support adequate maintenance planning and mitigating actions that could prevent unit breakdown and the consequent damage and financial losses.