Renan Favarão da Silva

Prof. Renan Favarão da Silva

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
RSRenan Favarão da Silva
Renan Favarão da Silva
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza

23 September 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RSRenan Favarão da Silva
Renan Favarão da Silva
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
Proper maintenance planning is critical for maintenance management to contribute to increasing availability, ensuring quality requirements, and controlling the safety and environmental risks associated with physical assets. As supporting tools for developing maintenance strategies, Reliability-Centered Maintenance (RCM) and Risk-Based Maintenance (RBM) methods are currently used in several organizations. Nevertheless, these strategies are often approached separately although they are complementary. In this context, this paper proposes a novel method that effectively integrates RCM and RBM by adapting the traditional RCM method to incorporate risk management into maintenance planning decision-making to support maintenance management. The proposed Reliability and Risk Centered Maintenance (RRCM) method allows organizations to determine maintenance plans that ensure the reliability of the physical assets while considering and prioritizing the risks associated with their potential functional failures. The proposed method was demonstrated through a case study considering the operational context of a hydroelectric power plant. The results show the ability of RRCM to assist in the development and implementation of maintenance plans oriented to reliability, risk, and cost.

11 October 2021 in Journal of Quality in Maintenance Engineering
Verified
Journal Article
Closed access
RSRenan Favarão da Silva
Renan Favarão da Silva
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
Purpose: Maintenance management is perceived as fundamental for ensuring that physical assets contribute to business outcomes. In this context, the purpose of this paper is to elaborate a novel maintenance management framework for asset management (MMFAM) based on ISO 55000 series guidelines.Design/methodology/approach: The paper proposes an MMFAM that intends to translate the technical requirements set out in the ISO 550001 standard to the maintenance stage of asset management. First, the framework is modeled using consideration based on the analysis of the ISO 55000 series and the review of previous maintenance management frameworks. Then, support tools are presented that collaborate for the implementation of the processes and activities provided for in the MMFAM.Findings: The proposed MMFAM was modeled using a Business Process Model and Notation since it is a standardized graphical notation for process modeling and contributes to the understanding of the framework. In addition, the applicable tools were presented for the practical implementation of MMFAM processes and activities.Practical implications: The paper is expected to contribute to maintenance practitioners and researchers in understanding and disseminating a novel maintenance management framework that is in line with asset management through the international ISO 55000 series.Originality/value: As it is essentially multidisciplinary and complex, asset management has still been little explored. Moreover, the requirements for implementing an asset management system, as explained in the ISO 55001 standard, only provide what needs to be done, but not how to do it. Accordingly, the paper fills a gap in maintenance management literature, as it addresses the ISO 55000 series for asset management in depth.

8 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
RSRenan Favarão da Silva
Renan Favarão da Silva
MBMARJORIE Maria Bellinello
MARJORIE Maria Bellinello
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
Sara AntomarioniSara Antomarioni
Sara Antomarioni
Maurizio BevilacquaMaurizio Bevilacqua
Maurizio Bevilacqua
Filippo Emanuele CiarapicaFilippo Emanuele Ciarapica
Filippo Emanuele Ciarapica
The current global competitive scenario and the increase in complexity and automation of equipment and systems demand better results from maintenance management in organizations. As maintenance resources are limited, prioritizing maintenance activities is essential to allocate them properly and to meet maintenance management objectives. In the face of these challenges, multicriteria decision-making (MCDM) methods are commonly used in organizations to support decision-making. Nevertheless, selecting a suitable MCDM method for maintenance planning can be complicated given the diversity of methods and their strengths and weaknesses. In this context, this paper proposes a novel knowledge-based method for deciding a multicriteria decision-making (MCDM) method to prioritize maintenance work orders of hydroelectric plants. As the main novel contribution, it translates the intrinsic characteristics of the main MCDM methods into questions related to maintenance planning to guide the recommendation of a suitable MCDM method for organizations through a decision tree diagram. This approach was applied to a maintenance case study of a hydroelectric power plant in order to demonstrate its use and contribute to its understanding. These findings contribute to maintenance management in selecting an MCDM method aligned with the context of its maintenance planning for the prioritization of maintenance work orders.

1 January 2020
Verified
Conference Paper
Closed access
RSRenan Favarão da Silva
Renan Favarão da Silva
Arthur MelaniArthur Melani
Arthur Melani
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
SNSilvio Ikuyo Nabeta
Silvio Ikuyo Nabeta
FHFernando Hiroyuki Hamaji
Fernando Hiroyuki Hamaji

23 December 2021 in Energies
Verified
Journal Article
Open access
PDF file
Miguel Angelo de Carvalho MichalskiMiguel Angelo de Carvalho Michalski
Miguel Angelo de Carvalho Michalski
Arthur MelaniArthur Melani
Arthur Melani
RSRenan Favarão da Silva
Renan Favarão da Silva
GSGilberto Francisco Martha de Souza
Gilberto Francisco Martha de Souza
FHFernando H. Hamaji
Fernando H. Hamaji
From the breakdown of the Kaplan rotor of a hydrogenerator unit and the monitored data collected during its operation before such a failure, this work presents a post-occurrence data analysis in which a previously developed hybrid method based on unsupervised machine learning techniques is applied to detect and diagnose failure before a unit shutdown. In addition to demonstrating the efficiency and capacity of the developed method in an application with real data, the conducted analysis seeks to shed light on the events that occurred at the considered hydroelectric power plant, helping to understand the failure mode evolution and outcome. The results of the fault detection and diagnosis process clearly demonstrated how the evolution of failure modes took place in the analyzed equipment. The detection of potential failures far in advance would support adequate maintenance planning and mitigating actions that could prevent unit breakdown and the consequent damage and financial losses.