The numerical solution of the Vlasov-Fokker-Planck equation is a well established method to simulate the dynamics, including the self-interaction with its own wake field, of an electron bunch in a storage ring. In this paper we present Inovesa, a modularly extensible program that uses opencl to massively parallelize the computation. It allows a standard desktop PC to work with appropriate accuracy and yield reliable results within minutes. We provide numerical stability-studies over a wide parameter range and compare our numerical findings to known results. Simulation results for the case of coherent synchrotron radiation will be compared to measurements that probe the effects of the microbunching instability occurring in the short bunch operation at ANKA. It will be shown that the impedance model based on the shielding effect of two parallel plates can not only describe the instability threshold, but also the presence of multiple regimes that show differences in the emission of coherent synchrotron radiation.
The planning and decision-making for a distributed energy supply concept in complex actor structures like in districts calls for the approach to be highly structured. Here, a strategy with strong use of energetic simulations is developed, the core elements are presented, and research gaps are identified. The exemplary implementation is shown using the case study of a new district on the former Oldenburg airbase in northwestern Germany. The process is divided into four consecutive phases, which are carried out with different stakeholder participation and use of different simulation tools. Based on a common objective, a superstructure of the applicable technologies is developed. Detailed planning is then carried out with the help of a multi-objective optimal sizing algorithm and Monte Carlo based risk assessment. The process ends with the operating phase, which is to guarantee a further optimal and dynamic mode of operation. The main objective of this publication is to present the core elements of the planning processes and decision-making framework based on the case study and to find and identify research gaps that will have to be addressed in the future.
1 August 2019 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment