Queen Arista Rosmania Putri Sumarsono

Ms. Queen Arista Rosmania Putri Sumarsono

University of Brawijaya, Malang, Jawa Timur, Indonesia
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 August 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
AMAs’ad Munawir
As’ad Munawir
HHHarimurti Harimurti
Harimurti Harimurti
QSQueen Arista Rosmania Putri Sumarsono
Queen Arista Rosmania Putri Sumarsono
Earthquakes are a high-risk natural phenomenon in Indonesia, which is between three tectonic plates: the Eurasian, Pacific, and Indo–Australian plates. This study examines the response of bored piles with asymmetrical pile cap in the Auditorium Building of Brawijaya University to seismic loads, which is still rare to conduct this research. This study assessed based on 3D finite element-numerical approach, where lateral resistance and p-multiplier values compared on the effects of combination lateral loads, pile stiffness, and soil stiffness. The behavior of lateral resistance and deflection group piles with asymmetrical pile cap and single pile with square pile cap gives a good agreement. The side slope of the pile cap can increase the shear zone, increase the lateral resistance, and the most considerable lateral resistance to the lowest occurs in the horizontal direction, opposite the loading direction. In addition, the pile configuration that is not symmetrical gives an increasing p-multiplier value followed by an increasing deflection and the p-multiplier from the 3D finite element method was within the recommended range.

25 January 2023 in Studia Geotechnica et Mechanica
Verified
Journal Article
Open access
PDF file
QSQueen Arista Rosmania Putri Sumarsono
Queen Arista Rosmania Putri Sumarsono
AMAs’ad Munawir
As’ad Munawir
HAHarimurti
Harimurti
Sciendo provides publishing services and solutions to academic and professional organizations and individual authors. We publish journals, books, conference proceedings and a variety of other publications.

1 September 2020 in Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK)
Verified
Journal Article
Closed access
PDF file
QSQueen Arista Rosmania Putri Sumarsono
Queen Arista Rosmania Putri Sumarsono
JKJurusan Teknik Sipil Mahasiswa Manajemen Rekayasa Konstruksi
Jurusan Teknik Sipil Mahasiswa Manajemen Rekayasa Konstruksi
GAGerard Aponno
Gerard Aponno
DTDjoko Tridjanto
Djoko Tridjanto
PSPoliteknik Negeri Malang Dosen Jurusan Teknik Sipil
Politeknik Negeri Malang Dosen Jurusan Teknik Sipil
In Blitar District, exactly at Sutojayan Sub-District has become a place for flood every year because Bogel River is no longer able to relocate the flood discharge. Therefore, need to be planned a flood control construction with retaining wall begin from dimension, stability, cost estimate, and time schedule. The data required are soil testing, location map, river’s geometric section, and work unit price of Blitar District at 2019. Dimension of retaining wall is planned based on flood waters face at Q25th, the stability is calculated towards overturning, sliding and bearing capacity, axial bearing capacity of pile is calculated based on three method that is Mayerhof’s (1976), Vesic’s (1977), and Janbu’s (1976) method, while for lateral bearing capacity of pile is calculated based on Brom’s method. From the design results, the dimension of retaining wall is obtained the high 3.50 metres, upper stem’s width 0.30 metres, bottom stem’s width 0.45 metres, plate’s width 3.00 metres, heel’s width 1.55 metres, toe’s width 1.00 metres, and toe’s or heel’s high 0.35 metres. The chosen pile is pile with 20 cm × 20 cm dimension with 5 metres length for retaining wall at Sta BG. 22 and 6 metres for Sta BG. 23. With 27 pile for a 10 metres segmen, the stability against sliding and bearing capacity can be fullfiled. The reinforcement that used for plate and stem are D 16 for main tensile reinforcement, D 13 for main press reinforcement, and D 10 for divide tensile and press reinforcement. The sum of estimate cost of retaining wall is Rp. 8,626,239,000.000 with 321 work days.