Rajitha Udawalpola

Dr. Rajitha Udawalpola

Department of Electrical and Information Engineering, Faculty of Engineering, University of Ruhuna
+1
orcid

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 July 2007 in International Journal for Numerical Methods in Engineering
Verified
Journal Article
Closed access
PDF file
RURajitha Udawalpola
Rajitha Udawalpola
MBMartin Berggren
Martin Berggren

1 July 2010 in Journal of Computational and Applied Mathematics
Verified
Journal Article
Closed access
EWEddie Wadbro
Eddie Wadbro
RURajitha Udawalpola
Rajitha Udawalpola
MBMartin Berggren
Martin Berggren

29 December 2010 in International Journal for Numerical Methods in Engineering
Verified
Journal Article
Closed access
PDF file
RURajitha Udawalpola
Rajitha Udawalpola
EWEddie Wadbro
Eddie Wadbro
MBMartin Berggren
Martin Berggren

20 January 2021 in Energies
Verified
Journal Article
Open access
PDF file
RURajitha Udawalpola
Rajitha Udawalpola
TMTaisuke Masuta
Taisuke Masuta
TYTaisei Yoshioka
Taisei Yoshioka
KTKohei Takahashi
Kohei Takahashi
HOHideaki Ohtake
Hideaki Ohtake
Power imbalances such as power shortfalls and photovoltaic (PV) curtailments have become a major problem in conventional power systems due to the introduction of renewable energy sources. There can be large power shortfalls and PV curtailments because of PV forecasting errors. These imbalances might increase when installed PV capacity increases. This study proposes a new scheduling method to reduce power shortfalls and PV curtailments in a PV integrated large power system with a battery energy storage system (BESS). The model of the Kanto area, which is about 30% of Japan’s power usage with 60 GW grid capacity, is used in simulations. The effect of large PV power integration of 50 GW and 100 GW together with large BESS capacity of 100 GWh and 200 GWh has been studied. Mixed integer linear programming technique is used to calculate generator unit commitment and BESS charging and discharging schedules. The simulation results are shown for two months with high and low solar irradiance, which include days with large PV over forecast and under forecast errors. The results reveal that the proposed method eliminates power shortfalls by 100% with the BESS and reduce the PV curtailments by 69.5% and 95.2% for the months with high and low solar irradiance, respectively, when 200 GWh BESS and 100 GW PV power generation are installed.

8 February 2023 in Electrical Engineering in Japan
Verified
Journal Article
Closed access
TYTaisei Yoshioka
Taisei Yoshioka
KNKoji Nishio
Koji Nishio
KTKohei Takahashi
Kohei Takahashi
TMTaisuke Masuta
Taisuke Masuta
RURajitha Udawalpola
Rajitha Udawalpola
HOHideaki Ohtake
Hideaki Ohtake